EV Charger / Electric Vehicle Charging Station Permit in Worley, Idaho

Worley has no dedicated EV charger/EVSE permit type. As with solar, the State of Idaho DOPL — not the City of Worley — issues and inspects the electrical permit for an EV charger circuit; the City only handles application intake at City Hall. Reviewed directly against DOPL's own 'Electrical Permit Worksheet (Fee Schedule)' (Homeowner Electrical Permit form, revised 8/17/2022, re-fetched live 2026-07-20 and confirmed unchanged/current): the worksheet has no line item named 'EV charger,' 'electric vehicle,' 'EVSE,' or 'charging station.' A residential Level 2 EV charger circuit added to an existing home is captured under the worksheet's general 'Existing Residence' line — '$65 fee plus $10 per additional branch circuit' — since installing a dedicated EV charger circuit is exactly that: adding a branch circuit to an existing panel. If bundled into new construction, it is included in the flat 'New: Single Family Dwelling' fee tier by square footage. The worksheet's residual catch-all, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY,' is resolved on close re-reading of its exact instruction text: it directs the applicant to 'Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system' — an EV charger is a load/consumption device, not a generation, production, or storage system, so this catch-all does NOT apply to it. The 'Existing Residence' branch-circuit line is therefore the controlling fee mechanism for a standard EV charger circuit, not an ambiguous choice between two lines.

Verified 2026-07-20 · Source

When you need this permit

  • Apply for the State of Idaho DOPL electrical permit for the EV charger circuit — purchased through dbs.idaho.gov or via the DOPL Homeowner Electrical Permit Application/Worksheet if self-installing on an owner-occupied primary/secondary residence; NOT issued locally by the City of Worley, which has no city electrical program Owner-builder
  • Idaho Code § 39-4109 and IDAPA 24.39.30 (Rules of Building Safety) govern statewide electrical permitting administered by DOPL
  • Work must comply with the National Electrical Code edition currently adopted by the Idaho Building Code Board
  • If the charger installation requires a new structure (e.g., a carport) or a panel/service upgrade tied to new construction, a companion DOPL building permit (Table 1-A, valuation-based) may also apply
  • Contact DOPL at (208) 334-3950 or the Worley City Hall building permit line at (208) 686-1258 to confirm which fee line (branch-circuit addition vs. the renewable-energy catch-all) DOPL currently applies to a standalone EV charger installation before purchasing the permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

DOPL Electrical Permit — Existing Residence (additional branch circuit; the controlling line for a standalone EV charger circuit)DOPL Electrical Permit Worksheet (Fee Schedule), 'Existing Residence' line, re-confirmed live 2026-07-20 — no line item named 'EV charger' or 'electric vehicle' exists on this worksheet, but the worksheet's own catch-all instruction text ('Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system') excludes load/consumption devices like an EV charger, making this branch-circuit-addition line the controlling mechanism rather than an ambiguous choice
$65.00 base fee plus $10.00 per additional branch circuit (one circuit included in the $65.00)
DOPL Electrical Permit — 'Other Installations' catch-all (solar/renewable-energy/power-production/storage systems only — does NOT apply to a standard EV charger)DOPL Electrical Permit Worksheet, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY' section — its own instruction text scopes it to power generation/production/storage systems; an EV charger is a consumption device, not generation/storage, so this line is confirmed NOT to be the controlling fee mechanism for a standard EV charger circuit
(Total cost of electrical system x 0.02) + $60 up to $10,000; tiered formula continues above that threshold

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Worley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    DOPL Electrical Inspection

    All electrical work performed under a DOPL permit, including a new EV charger circuit, must be inspected by the Division of Occupational and Professional Licensing; project value/scope is verified against actual costs at Final

See the full Worley inspection guide — scheduling & re-inspection fees →

Tips

  • Worley residents apply for EV charger electrical work directly through DOPL (dbs.idaho.gov), not through City Hall's own staff — City Hall only handles application intake.
  • Because DOPL's published worksheet has no line item explicitly named for EV chargers, the applicable fee is the 'Existing Residence' branch-circuit-addition line ($65 + $10/circuit) — the worksheet's renewable-energy catch-all is expressly scoped to solar/power-generation/storage systems and does not apply to a standard charger circuit, per the worksheet's own instruction text.

Frequently asked questions

Worley requires an ev charger / electric vehicle charging station permit for: Apply for the State of Idaho DOPL electrical permit for the EV charger circuit — purchased through dbs.idaho.gov or via the DOPL Homeowner Electrical Permit Application/Worksheet if self-installing on an owner-occupied primary/secondary residence; NOT issued locally by the City of Worley, which has no city electrical program; Idaho Code § 39-4109 and IDAPA 24.39.30 (Rules of Building Safety) govern statewide electrical permitting administered by DOPL; Work must comply with the National Electrical Code edition currently adopted by the Idaho Building Code Board; If the charger installation requires a new structure (e.g., a carport) or a panel/service upgrade tied to new construction, a companion DOPL building permit (Table 1-A, valuation-based) may also apply; Contact DOPL at (208) 334-3950 or the Worley City Hall building permit line at (208) 686-1258 to confirm which fee line (branch-circuit addition vs. the renewable-energy catch-all) DOPL currently applies to a standalone EV charger installation before purchasing the permit. If your project isn't listed, confirm with City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at (208) 686-1258 (City Hall, phone & fax) before starting work.

No. DOPL's statewide Electrical Permit Worksheet has no line item named for EV chargers. A dedicated EV charger circuit on an existing home falls under the worksheet's general 'Existing Residence' branch-circuit-addition fee ($65 plus $10 per additional circuit) — the worksheet's separate renewable-energy/power-generation catch-all is confirmed not to apply, since a charger consumes rather than generates or stores power.

Worley does not publish a plan-review timeline for this permit. Contact City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at (208) 686-1258 (City Hall, phone & fax) for current turnaround.

You'll need: DOPL Homeowner or Contractor Electrical Permit Application. See the required-documents checklist on this page for details on each.

Worley requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: DOPL Electrical Inspection. Schedule each through City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) ((208) 686-1258 (City Hall, phone & fax)).

Apply through City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at 9936 W. E Street, P.O. Box 219, Worley, ID 83876. Phone: (208) 686-1258 (City Hall, phone & fax), email: info@cityofworley.org. Office hours: Monday 8:30 AM – 4:30 PM; Tuesday–Thursday 7:00 AM – 4:30 PM; Friday 8:30 AM – 2:00 PM (per City of Worley Contact-Us page). Official information: https://web.archive.org/web/20260708034932/http://www.cityofworley.org/Services.html.

Worley, Idaho has adopted: Idaho has a mandatory statewide baseline building code under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41; Idaho Code § 39-4109). No Worley-specific code-adoption ordinance is published online, and the City is not present on Municode or American Legal Publishing's code libraries (town too small to be independently codified there) — the City of Worley's own official website (cityofworley.org) publishes no separate codes-adopted or fee-schedule page.; 2018 International Building Code (IBC), as adopted and amended by the Idaho Building Code Board — statewide default administered by Idaho DOPL absent a superseding local ordinance. Source: Idaho Code § 39-4109; DOPL Rules of Building Safety (IDAPA 24.39.30), https://dopl.idaho.gov/wp-content/uploads/2023/10/BLD-Rules.pdf; Idaho Residential Code (2020 edition) — the version of the International Residential Code (IRC), Parts I, II, III, and IX, as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(b); Idaho Energy Conservation Code — version of the International Energy Conservation Code (IECC) as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(c); Building permit issuance and fee collection occur through Worley City Hall (per the City's own Services and About-Us pages), while plan review and inspections are performed by Idaho DOPL under contract — confirmed in DOPL's Inspector List with Schedules, which lists a building inspector (Kelly Buck) assigned to Worley (ZIP 83876, Kootenai County) with the jurisdictional note 'Inside City Limits.' Source: https://dopl.idaho.gov/wp-content/uploads/2023/12/BCRE-Inspector-List-with-Schedules.pdf; Electrical, mechanical, and plumbing permitting/inspection in Worley are administered by Idaho DOPL under the same statewide default (National Electrical Code as adopted by the Idaho Building Code Board; 2017 Idaho State Plumbing Code based on the 2015 UPC; International Mechanical Code/International Fuel Gas Code as adopted) — no separate city ordinance assumes this trade-permit jurisdiction. Source: https://dopl.idaho.gov/. Local amendments apply — see the Worley overview page for the full list.

Compare ev charger / electric vehicle charging station permit fees across Idaho

Look up this fee in a different city →

Embed this data card →