EV Charger / Electric Vehicle Charging Station Permit in Worley, Idaho

Worley has no dedicated EV charger/EVSE permit type. As with solar, the State of Idaho DOPL — not the City of Worley — issues and inspects the electrical permit for an EV charger circuit; the City only handles application intake at City Hall. DOPL's own 'Electrical Permit Worksheet (Fee Schedule)' (Homeowner Electrical Permit form, revised 8/17/2022) has no line item named 'EV charger,' 'electric vehicle,' 'EVSE,' or 'charging station.' A residential Level 2 EV charger circuit added to an existing home is captured under the worksheet's general 'Existing Residence' line — '$65 fee plus $10 per additional branch circuit' — since installing a dedicated EV charger circuit is exactly that: adding a branch circuit to an existing panel. If bundled into new construction, it is included in the flat 'New: Single Family Dwelling' fee tier by square footage. The worksheet's residual catch-all, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY,' does not apply: its instruction text directs the applicant to 'Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system', and an EV charger is a load device, not a generation, production, or storage system. The 'Existing Residence' branch-circuit line is the controlling fee mechanism for a standard EV charger circuit.

Verified 2026-07-20 · Source

When you need this permit

  • Apply for the State of Idaho DOPL electrical permit for the EV charger circuit — purchased through dbs.idaho.gov or via the DOPL Homeowner Electrical Permit Application/Worksheet if self-installing on an owner-occupied primary/secondary residence; NOT issued locally by the City of Worley, which has no city electrical program Owner-builder
  • Idaho Code § 39-4109 and IDAPA 24.39.30 (Rules of Building Safety) govern statewide electrical permitting administered by DOPL
  • Work must comply with the National Electrical Code edition currently adopted by the Idaho Building Code Board
  • If the charger installation requires a new structure (e.g., a carport) or a panel/service upgrade tied to new construction, a companion DOPL building permit (Table 1-A, valuation-based) may also apply
  • Contact DOPL at (208) 334-3950 or the Worley City Hall building permit line at (208) 686-1258 to confirm which fee line (branch-circuit addition vs. the renewable-energy catch-all) DOPL currently applies to a standalone EV charger installation before purchasing the permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

DOPL Electrical Permit — Existing Residence (additional branch circuit; the controlling line for a standalone EV charger circuit)
DOPL Electrical Permit Worksheet (Fee Schedule), 'Existing Residence' line — no line item named 'EV charger' or 'electric vehicle' exists on this worksheet, but the worksheet's own catch-all… Show full citationDOPL Electrical Permit Worksheet (Fee Schedule), 'Existing Residence' line — no line item named 'EV charger' or 'electric vehicle' exists on this worksheet, but the worksheet's own catch-all instruction text ('Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system') excludes load/consumption devices like an EV charger, making this branch-circuit-addition line the controlling mechanism rather than an ambiguous choice
$65.00 base fee plus $10.00 per additional branch circuit (one circuit included in the $65.00)
DOPL Electrical Permit — 'Other Installations' catch-all (solar/renewable-energy/power-production/storage systems only — does NOT apply to a standard EV charger)
DOPL Electrical Permit Worksheet, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY' section — its own instruction text scopes it to power generation/production/storage systems; Show full citationDOPL Electrical Permit Worksheet, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY' section — its own instruction text scopes it to power generation/production/storage systems; an EV charger is a consumption device, not generation/storage, so this line is confirmed NOT to be the controlling fee mechanism for a standard EV charger circuit
(Total cost of electrical system x 0.02) + $60 up to $10,000; tiered formula continues above that threshold

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Worley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    DOPL Electrical Inspection

    All electrical work performed under a DOPL permit, including a new EV charger circuit, must be inspected by the Division of Occupational and Professional Licensing; project value/scope is verified against actual costs at Final

See the full Worley inspection guide — scheduling & re-inspection fees →

Tips

  • Worley residents apply for EV charger electrical work directly through DOPL (dbs.idaho.gov), not through City Hall's own staff — City Hall only handles application intake.
  • Because DOPL's published worksheet has no line item explicitly named for EV chargers, the applicable fee is the 'Existing Residence' branch-circuit-addition line ($65 + $10/circuit) — the worksheet's renewable-energy catch-all is expressly scoped to solar/power-generation/storage systems and does not apply to a standard charger circuit, per the worksheet's own instruction text.

Frequently asked questions

Worley requires an ev charger / electric vehicle charging station permit for: Apply for the State of Idaho DOPL electrical permit for the EV charger circuit — purchased through dbs.idaho.gov or via the DOPL Homeowner Electrical Permit Application/Worksheet if self-installing on an owner-occupied primary/secondary residence; NOT issued locally by the City of Worley, which has no city electrical program; Idaho Code § 39-4109 and IDAPA 24.39.30 (Rules of Building Safety) govern statewide electrical permitting administered by DOPL; Work must comply with the National Electrical Code edition currently adopted by the Idaho Building Code Board; If the charger installation requires a new structure (e.g., a carport) or a panel/service upgrade tied to new construction, a companion DOPL building permit (Table 1-A, valuation-based) may also apply; Contact DOPL at (208) 334-3950 or the Worley City Hall building permit line at (208) 686-1258 to confirm which fee line (branch-circuit addition vs. the renewable-energy catch-all) DOPL currently applies to a standalone EV charger installation before purchasing the permit. If your project isn't listed, confirm with City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at (208) 686-1258 (City Hall, phone & fax) before starting work.

No. DOPL's statewide Electrical Permit Worksheet has no line item named for EV chargers. A dedicated EV charger circuit on an existing home falls under the worksheet's general 'Existing Residence' branch-circuit-addition fee ($65 plus $10 per additional circuit) — the worksheet's separate renewable-energy/power-generation catch-all is confirmed not to apply, since a charger consumes rather than generates or stores power.

Worley does not publish a plan-review timeline for this permit. Contact City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at (208) 686-1258 (City Hall, phone & fax) for current turnaround.

You'll need: DOPL Homeowner or Contractor Electrical Permit Application. See the required-documents checklist on this page for details on each.

Worley requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: DOPL Electrical Inspection. Schedule each through City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) ((208) 686-1258 (City Hall, phone & fax)).

Apply through City of Worley City Hall (building permits issued locally; plan review and inspections performed by Idaho DOPL Building Safety under the statewide program) at 9936 W. E Street, P.O. Box 219, Worley, ID 83876. Phone: (208) 686-1258 (City Hall, phone & fax), email: info@cityofworley.org. Office hours: Monday 8:30 AM – 4:30 PM; Tuesday–Thursday 7:00 AM – 4:30 PM; Friday 8:30 AM – 2:00 PM (per City of Worley Contact-Us page). Official information: https://web.archive.org/web/20260708034932/http://www.cityofworley.org/Services.html.

Worley, Idaho has adopted: Idaho has a mandatory statewide baseline building code under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41; Idaho Code § 39-4109). No Worley-specific code-adoption ordinance is published online, and the City is not present on Municode or American Legal Publishing's code libraries (town too small to be independently codified there) — the City of Worley's own official website (cityofworley.org) publishes no separate codes-adopted or fee-schedule page.; 2018 International Building Code (IBC), as adopted and amended by the Idaho Building Code Board — statewide default administered by Idaho DOPL absent a superseding local ordinance. Source: Idaho Code § 39-4109; DOPL Rules of Building Safety (IDAPA 24.39.30), https://dopl.idaho.gov/wp-content/uploads/2023/10/BLD-Rules.pdf; Idaho Residential Code (2020 edition) — the version of the International Residential Code (IRC), Parts I, II, III, and IX, as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(b); Idaho Energy Conservation Code — version of the International Energy Conservation Code (IECC) as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(c); Building permit issuance and fee collection occur through Worley City Hall (per the City's own Services and About-Us pages), while plan review and inspections are performed by Idaho DOPL under contract — confirmed in DOPL's Inspector List with Schedules, which lists a building inspector (Kelly Buck) assigned to Worley (ZIP 83876, Kootenai County) with the jurisdictional note 'Inside City Limits.' Source: https://dopl.idaho.gov/wp-content/uploads/2023/12/BCRE-Inspector-List-with-Schedules.pdf; Electrical, mechanical, and plumbing permitting/inspection in Worley are administered by Idaho DOPL under the same statewide default (National Electrical Code as adopted by the Idaho Building Code Board; 2017 Idaho State Plumbing Code based on the 2015 UPC; International Mechanical Code/International Fuel Gas Code as adopted) — no separate city ordinance assumes this trade-permit jurisdiction. Source: https://dopl.idaho.gov/. Local amendments apply — see the Worley overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Worley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Worley's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Worley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Worley lands. Privacy.

Compare ev charger / electric vehicle charging station permit fees across Idaho

Look up this fee in a different city →

Embed this data card →