EV Charger / Electric Vehicle Charging Station Permit in Worley, Idaho
Worley has no dedicated EV charger/EVSE permit type. As with solar, the State of Idaho DOPL — not the City of Worley — issues and inspects the electrical permit for an EV charger circuit; the City only handles application intake at City Hall. Reviewed directly against DOPL's own 'Electrical Permit Worksheet (Fee Schedule)' (Homeowner Electrical Permit form, revised 8/17/2022, re-fetched live 2026-07-20 and confirmed unchanged/current): the worksheet has no line item named 'EV charger,' 'electric vehicle,' 'EVSE,' or 'charging station.' A residential Level 2 EV charger circuit added to an existing home is captured under the worksheet's general 'Existing Residence' line — '$65 fee plus $10 per additional branch circuit' — since installing a dedicated EV charger circuit is exactly that: adding a branch circuit to an existing panel. If bundled into new construction, it is included in the flat 'New: Single Family Dwelling' fee tier by square footage. The worksheet's residual catch-all, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY,' is resolved on close re-reading of its exact instruction text: it directs the applicant to 'Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system' — an EV charger is a load/consumption device, not a generation, production, or storage system, so this catch-all does NOT apply to it. The 'Existing Residence' branch-circuit line is therefore the controlling fee mechanism for a standard EV charger circuit, not an ambiguous choice between two lines.
Verified 2026-07-20 · Source
When you need this permit
- Apply for the State of Idaho DOPL electrical permit for the EV charger circuit — purchased through dbs.idaho.gov or via the DOPL Homeowner Electrical Permit Application/Worksheet if self-installing on an owner-occupied primary/secondary residence; NOT issued locally by the City of Worley, which has no city electrical program Owner-builder
- Idaho Code § 39-4109 and IDAPA 24.39.30 (Rules of Building Safety) govern statewide electrical permitting administered by DOPL
- Work must comply with the National Electrical Code edition currently adopted by the Idaho Building Code Board
- If the charger installation requires a new structure (e.g., a carport) or a panel/service upgrade tied to new construction, a companion DOPL building permit (Table 1-A, valuation-based) may also apply
- Contact DOPL at (208) 334-3950 or the Worley City Hall building permit line at (208) 686-1258 to confirm which fee line (branch-circuit addition vs. the renewable-energy catch-all) DOPL currently applies to a standalone EV charger installation before purchasing the permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
DOPL Electrical Inspection
All electrical work performed under a DOPL permit, including a new EV charger circuit, must be inspected by the Division of Occupational and Professional Licensing; project value/scope is verified against actual costs at Final
See the full Worley inspection guide — scheduling & re-inspection fees →
Tips
- Worley residents apply for EV charger electrical work directly through DOPL (dbs.idaho.gov), not through City Hall's own staff — City Hall only handles application intake.
- Because DOPL's published worksheet has no line item explicitly named for EV chargers, the applicable fee is the 'Existing Residence' branch-circuit-addition line ($65 + $10/circuit) — the worksheet's renewable-energy catch-all is expressly scoped to solar/power-generation/storage systems and does not apply to a standard charger circuit, per the worksheet's own instruction text.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Worley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Worley
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Worley project checklist
Describe your project once and get every permit, document, and fee it triggers in Worley — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →