Worley building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Worley, Idaho.
Last verified 2026-07-23 · Source · Embed this page’s badge · Version history
Building department
- Address
- 9936 W. E Street, P.O. Box 219, Worley, ID 83876
- Phone
- (208) 686-1258 (City Hall, phone & fax)
- Office hours
- Monday 8:30 AM – 4:30 PM; Tuesday–Thursday 7:00 AM – 4:30 PM; Friday 8:30 AM – 2:00 PM (per City of Worley Contact-Us page)
- Website
- Official site
Inspection guide
See how inspections work in Worley — sequence, scheduling & re-inspection fees.
Codes adopted
Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.
- Idaho has a mandatory statewide baseline building code under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41; Idaho Code § 39-4109). No Worley-specific code-adoption ordinance is published online, and the City is not present on Municode or American Legal Publishing's code libraries (town too small to be independently codified there) — the City of Worley's own official website (cityofworley.org) publishes no separate codes-adopted or fee-schedule page.
- 2018 International Building Code (IBC), as adopted and amended by the Idaho Building Code Board — statewide default administered by Idaho DOPL absent a superseding local ordinance. Source: Idaho Code § 39-4109; DOPL Rules of Building Safety (IDAPA 24.39.30), https://dopl.idaho.gov/wp-content/uploads/2023/10/BLD-Rules.pdf
- Idaho Residential Code (2020 edition) — the version of the International Residential Code (IRC), Parts I, II, III, and IX, as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(b)
- Idaho Energy Conservation Code — version of the International Energy Conservation Code (IECC) as adopted/amended by the Idaho Building Code Board. Source: Idaho Code § 39-4109(1)(c)
- Building permit issuance and fee collection occur through Worley City Hall (per the City's own Services and About-Us pages), while plan review and inspections are performed by Idaho DOPL under contract — confirmed in DOPL's Inspector List with Schedules, which lists a building inspector (Kelly Buck) assigned to Worley (ZIP 83876, Kootenai County) with the jurisdictional note 'Inside City Limits.' Source: https://dopl.idaho.gov/wp-content/uploads/2023/12/BCRE-Inspector-List-with-Schedules.pdf
- Electrical, mechanical, and plumbing permitting/inspection in Worley are administered by Idaho DOPL under the same statewide default (National Electrical Code as adopted by the Idaho Building Code Board; 2017 Idaho State Plumbing Code based on the 2015 UPC; International Mechanical Code/International Fuel Gas Code as adopted) — no separate city ordinance assumes this trade-permit jurisdiction. Source: https://dopl.idaho.gov/
Permit types & fees
Residential Building Permit
Required for new single-family residential construction, additions, and structural alterations within the incorporated City of Worley. Permit applications are issued through Worley City Hall; plan review and inspections are performed by the Idaho Division of Occupational and Professional Licenses (DOPL) Building Safety program under the statewide default administration arrangement, since no separate city building-code ordinance or fee schedule is independently published.
Solar Photovoltaic (PV) Permit
Required for installing a rooftop or ground-mounted solar photovoltaic system within Worley city limits. Unlike many Idaho cities that run their own local building department, Worley relies entirely on the State of Idaho DOPL for BOTH the structural building permit and the electrical permit — plan review and inspection for all trades (building, electrical, mechanical, plumbing) are performed by DOPL under the statewide program, with the City of Worley only handling permit application intake at City Hall. Neither DOPL's Table 1-A Building Permit Fees nor its Electrical Permit Worksheet publishes a dedicated solar/PV-specific building fee, but DOPL's electrical fee schedule does publish a dedicated Solar/Renewable Energy formula.
EV Charger / Electric Vehicle Charging Station Permit
Worley has no dedicated EV charger/EVSE permit type. As with solar, the State of Idaho DOPL — not the City of Worley — issues and inspects the electrical permit for an EV charger circuit; the City only handles application intake at City Hall. Reviewed directly against DOPL's own 'Electrical Permit Worksheet (Fee Schedule)' (Homeowner Electrical Permit form, revised 8/17/2022, re-fetched live 2026-07-20 and confirmed unchanged/current): the worksheet has no line item named 'EV charger,' 'electric vehicle,' 'EVSE,' or 'charging station.' A residential Level 2 EV charger circuit added to an existing home is captured under the worksheet's general 'Existing Residence' line — '$65 fee plus $10 per additional branch circuit' — since installing a dedicated EV charger circuit is exactly that: adding a branch circuit to an existing panel. If bundled into new construction, it is included in the flat 'New: Single Family Dwelling' fee tier by square footage. The worksheet's residual catch-all, 'OTHER INSTALLATIONS including SOLAR/RENEWABLE ENERGY,' is resolved on close re-reading of its exact instruction text: it directs the applicant to 'Check here if this is a Solar, Renewable Energy, power generation, power production, or energy storage system' — an EV charger is a load/consumption device, not a generation, production, or storage system, so this catch-all does NOT apply to it. The 'Existing Residence' branch-circuit line is therefore the controlling fee mechanism for a standard EV charger circuit, not an ambiguous choice between two lines.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- No data reported
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity
Tips & gotchas
- Worley is a legally independent Idaho municipal corporation (incorporated 1917, Mayor-Council government) despite lying entirely within the exterior boundaries of the Coeur d'Alene Reservation — verified directly from the City's own site rather than assumed from the Plummer precedent.
- Kootenai County's 'ARTICLE 10.14. WORLEY' code entry is a Chapter 10 'Areas of City Impact' zoning provision (Idaho Code Title 67, Ch. 65) governing the county's land-use jurisdiction in the area surrounding Worley — it is not a delegation of Worley's own building-permit authority to the county.
- Worley issues its own building permits at City Hall, but relies on the State of Idaho (DOPL) for plan review and inspections — the City has not adopted an independent building-code enforcement ordinance, and no separate fee schedule, codes-adopted ordinance, or design-criteria table is published anywhere online for Worley specifically.
- The building-permit fee is DOPL's statutory Table 1-A fee schedule (confirmed 2026-07-23): DOPL's own rules state building permits statewide 'shall be obtained from the Division' absent a local ordinance, and no Worley-specific fee ordinance is published anywhere online — the same basis already used for the solar PV permit fee elsewhere in this record.
- No downloadable application form, ordinance text, or fee schedule exists on cityofworley.org — the site is a thin, older-generation (Homestead-builder) municipal website. Contact City Hall directly at (208) 686-1258 for current forms and fees.
- Electrical, mechanical, and plumbing permits in Worley are handled entirely by Idaho DOPL, not the City.