Moscow building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Moscow, Idaho.

Verified 2026-07-04 · Source

How to schedule

Inspections are requested through the building department below.

Address
504 S. Washington Street, Moscow, ID 83843
Phone
(208) 883-7022
Office hours
Community Development / Building Division, 504 S. Washington Street, Moscow, ID 83843. Building Official: Justin Goodwin, CBO, (208) 883-7014, jgoodwin@ci.moscow.id.us, fax (208) 883-7033. Inspection requests: (208) 883-7022, requests should be made the day prior to the requested inspection; field inspections generally completed 8:00 AM-5:00 PM.

Published scheduling rules

  • Inspection requests should be made the day prior to the requested inspection; call (208) 883-7022 or request in person at the Building Division counter. (Residential Building Permit (New Single-Family Dwelling / Addition))

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Dwelling / Addition)

  1. 1

    Foundation

    Made when trenches are excavated, forms set, and all steel reinforcing, hold-down hardware and/or anchor bolts in place

  2. 2

    Concrete Slab or Under-Floor

    Made after all in-slab or under-floor equipment, piping, and conduit are in place, but before concrete is placed or floor sheathing installed

  3. 3

    Roof Sheathing Nailing

    Made when roof sheathing is installed and entirely nailed off

  4. 4

    Framing or Rough

    Made after all framing, fire-blocking, and bracing are in place, and all pipes, chimneys, vents, roof covering, and rough electrical/plumbing/heating are complete and inspected

  5. 5

    Insulation

    Made when all insulation is installed and all shell openings/gaps are caulked or sealed

  6. 6

    Lath and/or Gypsum Board

    Made after all lath/gypsum board is in place but before plastering is applied or joints/fasteners are taped and finished

  7. 7

    Final

    Made after finishing grading, when the building is complete and ready for occupancy, and all plumbing/electrical fixtures and appliances are installed; results in a Certificate of Occupancy

Applies to: Electric Vehicle (EV) Charger Permit

  1. 1

    Rough Electrical

    New circuit wiring inspected before concealment

  2. 2

    Final (Certificate of Compliance - Electrical)

    Final electrical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Part of the framing/rough inspection; wiring must be complete and inspected before framing sign-off

  2. 2

    Final (Certificate of Compliance - Electrical)

    Final electrical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

Applies to: Gas / Mechanical Permit

  1. 1

    Rough Mechanical

    Part of the framing/rough inspection; ductwork, gas piping, and equipment rough-in must be complete and inspected before framing sign-off

  2. 2

    Final (Certificate of Compliance - Heating/Mechanical)

    Final mechanical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing, part of the standard rough/framing inspection

  2. 2

    Final (Certificate of Compliance - Electrical)

    Final electrical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

Final inspection only: Demolition Permit, Re-Roofing Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moscow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Moscow building permits

Get alerts for Moscow

We'll email you when Moscow's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.