Residential Building Permit (New Single-Family Dwelling / Addition) — Moscow, Idaho · Requirements sheet
Verified 2026-07-04 · Source: https://www.ci.moscow.id.us/DocumentCenter/View/21221/City-of-Moscow-Project-Process-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Single-Family Dwelling / Addition) in Moscow, Idaho
Required for new one- and two-family dwelling construction and additions within Moscow city limits, administered by the City of Moscow Building Safety Division. Building Permit Fees are based on ICC Building Valuations (February issue of the Building Safety Journal) on a bracketed fee table, with a separate Plan Review Fee for projects valued over $10,000.
Verified 2026-07-04 · Source
When you need this permit
- Site/plot plan required with all building permit applications (except simple re-roof permits), showing property lines, all structures, street, driveway, sidewalk, and location of proposed work
- Floor plans showing all door/window sizes and locations, room dimensions and uses
- For new dwellings/additions: foundation plan, floor framing plan, roof framing plan, electrical plan (meter, switch, outlet, and light locations), and two sets of wet-stamped structural/truss calculations if required
- Two complete paper sets of plans (or one electronic set, followed by two stamped paper sets after electronic approval) submitted to the Community Development Office
- Contractor must be registered with the State of Idaho; name and registration number required on the application
- Plan Review Fee (65% of Building Permit Fee, or 40% for duplicate plans) applies to projects over $10,000 in valuation; a $500 Plan Review Deposit is credited toward this fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Made when trenches are excavated, forms set, and all steel reinforcing, hold-down hardware and/or anchor bolts in place
- 2
Concrete Slab or Under-Floor
Made after all in-slab or under-floor equipment, piping, and conduit are in place, but before concrete is placed or floor sheathing installed
- 3
Roof Sheathing Nailing
Made when roof sheathing is installed and entirely nailed off
- 4
Framing or Rough
Made after all framing, fire-blocking, and bracing are in place, and all pipes, chimneys, vents, roof covering, and rough electrical/plumbing/heating are complete and inspected
- 5
Insulation
Made when all insulation is installed and all shell openings/gaps are caulked or sealed
- 6
Lath and/or Gypsum Board
Made after all lath/gypsum board is in place but before plastering is applied or joints/fasteners are taped and finished
- 7
Final
Made after finishing grading, when the building is complete and ready for occupancy, and all plumbing/electrical fixtures and appliances are installed; results in a Certificate of Occupancy
See the full Moscow inspection guide — scheduling & re-inspection fees →
Tips
- New Single-Family Dwelling plan review is <10 business days for first review and <5 business days for subsequent reviews, per the City's published Submittal for Plan Review timeline table (Homeowner's Guide, page 9).
- Inspection requests should be made the day prior to the requested inspection; call (208) 883-7022 or request in person at the Building Division counter.
- Permits automatically expire if reasonable work is not accomplished during any 180-day period; renewal requires additional fees.
- Special Inspectors (hired by the owner) may be required for specialized construction methods such as welding, epoxy, or high-strength concrete; reports must be given to the City inspector.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moscow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Moscow
Residential Building Permit (New Single-Family Dwelling / Addition) in other cities
Compare residential building permit (new single-family dwelling / addition) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Moscow project checklist
Describe your project once and get every permit, document, and fee it triggers in Moscow — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.