Electrical Permit in Moscow, Idaho

Required for electrical installation, alteration, service change-out, or new circuit work within Moscow city limits, administered by the City of Moscow Building Safety Division under the locally adopted National Electrical Code (NEC).

Verified 2026-07-04 · Source

When you need this permit

  • Electrical permit required for service change-outs, circuit extensions/additions, and new residential electrical service and wiring
  • New residential (single- and two-family only) electrical service and wiring is fee-assessed per square foot
  • Commercial electrical work (including multi-family dwellings, fraternities/sororities, and mobile park distribution wiring/pedestals) is fee-assessed on a contract-price bracket table
  • Permit Issuance Fee charged with all permits except flat-fee, Commercial, and Institutional permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Service Change OutCity of Moscow FY2026 Fee Schedule, Schedule C, page 7
$73.75
Extension or Addition of up to 6 CircuitsCity of Moscow FY2026 Fee Schedule
$48.00
Extension or Addition of More Than 6 CircuitsCity of Moscow FY2026 Fee Schedule
$73.75
Electric Furnaces, Heat Pumps, Air Conditioners, Unit Space Heaters, Ventilation FansPer appliance. City of Moscow FY2026 Fee Schedule
$8.75
Domestic Water PumpsCity of Moscow FY2026 Fee Schedule
$36.25
Commercial Contract Price $0 - $2,000Plus 4% of contract price up to $2,000. Includes multi-family dwellings, fraternities/sororities, distribution wiring/pedestals for mobile parks. City of Moscow FY2026 Fee Schedule
$31.75
Commercial Contract Price $2,001 - $10,000Plus 3% of contract price over $2,000. City of Moscow FY2026 Fee Schedule
$117.25
Commercial Contract Price $10,001 - $100,000Plus 2% of contract price over $10,000. City of Moscow FY2026 Fee Schedule
$374.75
Commercial Contract Price Over $100,001Plus 1% of contract price over $100,000. City of Moscow FY2026 Fee Schedule
$2,303.00
Permit Issuance FeeCity of Moscow FY2026 Fee Schedule, page 8
$32.75
Temporary ServiceCity of Moscow FY2026 Fee Schedule, page 8
$23.25
New Dwelling Unit Electrical Service and Wiring (Single/Two Family)Per square foot. City of Moscow FY2026 Fee Schedule, page 8
$0.13
Electric Furnaces and Unit Space Heaters (new residential)Per appliance. City of Moscow FY2026 Fee Schedule, page 8
$6.25

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Moscow?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Part of the framing/rough inspection; wiring must be complete and inspected before framing sign-off

  2. 2

    Final (Certificate of Compliance - Electrical)

    Final electrical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

See the full Moscow inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical Certificate of Compliance inspection is a flat $79.00 fee per the FY2026 Fee Schedule.
  • New residential electrical service/wiring for single- and two-family dwellings is billed per square foot ($0.13/sq ft) rather than a flat trade fee.

Frequently asked questions

Moscow requires an electrical permit for: Electrical permit required for service change-outs, circuit extensions/additions, and new residential electrical service and wiring; New residential (single- and two-family only) electrical service and wiring is fee-assessed per square foot; Commercial electrical work (including multi-family dwellings, fraternities/sororities, and mobile park distribution wiring/pedestals) is fee-assessed on a contract-price bracket table; Permit Issuance Fee charged with all permits except flat-fee, Commercial, and Institutional permits. If your project isn't listed, confirm with City of Moscow Building Safety Division (Community Development Department) at (208) 883-7022 before starting work.

In Moscow, the published Electrical Service Change Out is: $73.75. Additional published fees: Extension or Addition of up to 6 Circuits — $48.00; Extension or Addition of More Than 6 Circuits — $73.75; Electric Furnaces, Heat Pumps, Air Conditioners, Unit Space Heaters, Ventilation Fans — $8.75; Domestic Water Pumps — $36.25; Commercial Contract Price $0 - $2,000 — $31.75; Commercial Contract Price $2,001 - $10,000 — $117.25; Commercial Contract Price $10,001 - $100,000 — $374.75; Commercial Contract Price Over $100,001 — $2,303.00; Permit Issuance Fee — $32.75; Temporary Service — $23.25; New Dwelling Unit Electrical Service and Wiring (Single/Two Family) — $0.13; Electric Furnaces and Unit Space Heaters (new residential) — $6.25. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Moscow does not publish a plan-review timeline for this permit. Contact City of Moscow Building Safety Division (Community Development Department) at (208) 883-7022 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Moscow requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final (Certificate of Compliance - Electrical). Schedule each through City of Moscow Building Safety Division (Community Development Department) ((208) 883-7022).

Apply through City of Moscow Building Safety Division (Community Development Department) at 504 S. Washington Street, Moscow, ID 83843. Phone: (208) 883-7022, email: jgoodwin@ci.moscow.id.us. Office hours: Community Development / Building Division, 504 S. Washington Street, Moscow, ID 83843. Building Official: Justin Goodwin, CBO, (208) 883-7014, jgoodwin@ci.moscow.id.us, fax (208) 883-7033. Inspection requests: (208) 883-7022, requests should be made the day prior to the requested inspection; field inspections generally completed 8:00 AM-5:00 PM.. Official information: https://www.ci.moscow.id.us/243/Building-Safety.

Moscow, Idaho has adopted: The City of Moscow independently administers and issues its own building permits within Moscow city limits through its Building Safety Division, part of the Community Development Department — this is a distinct office from the Latah County Planning & Building Department (522 South Adams Street, Moscow, ID), confirmed by the City's own Homeowner's Guide to Construction Permits and Inspections, which lists 'Latah County Planning/Building, (208) 883-7220' as a separate entry in its Useful Telephone Numbers page, distinct from the City's own Community Development line. Source: City of Moscow Homeowner's Guide to Construction Permits and Inspections (Building Division, Justin Goodwin CBO), https://www.ci.moscow.id.us/DocumentCenter/View/21221/City-of-Moscow-Project-Process-PDF, page 19; International Building Code (IBC), locally adopted and administered by the City of Moscow — specific edition year not published on the City's Construction Regulations index page as of 2026-07-04; the page lists 'International Building Code' as Chapter 01 of the City's adopted code chapters without stating the edition. Source: City of Moscow Construction Regulations page, https://www.ci.moscow.id.us/244/Construction-Regulations; International Residential Code (IRC), locally adopted and administered by the City of Moscow (Chapter 16 of the City's adopted code chapters); specific edition year not published on the Construction Regulations index page. Source: City of Moscow Construction Regulations page; Uniform Plumbing Code (UPC), locally adopted (Chapter 02 of the City's adopted code chapters) — notably the Uniform Plumbing Code rather than the International Plumbing Code; specific edition year not published on the index page. Source: City of Moscow Construction Regulations page; National Electrical Code (NEC), locally adopted (Chapter 03 of the City's adopted code chapters); specific edition year not published on the index page. Source: City of Moscow Construction Regulations page; International Fuel Gas Code (IFGC), locally adopted (Chapter 04 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Mechanical Code (IMC), locally adopted (Chapter 10 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Existing Building Code (IEBC), locally adopted (Chapter 12 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Property Maintenance Code (IPMC), locally adopted (Chapter 13 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Energy Conservation Code (IECC), locally adopted (Chapter 15 of the City's adopted code chapters); the City separately publishes an Energy Conservation Plan Review Supplement. Source: City of Moscow Construction Regulations page and Plan Review Information page, https://www.ci.moscow.id.us/256/Plan-Review-Information; Idaho Building Code Act (Idaho Code Title 39, Chapter 41) makes building code standards a matter of statewide concern; local governments that issue building permits and perform code enforcement (such as the City of Moscow) must adopt the International Building Code and Idaho Residential Code as amended by the Idaho Building Code Board through negotiated rulemaking. Source: Idaho Legislature, Idaho Code Title 39 Chapter 41 (39-4116), https://legislature.idaho.gov/statutesrules/idstat/title39/t39ch41/; NOTE ON OMISSION: The City of Moscow's Construction Regulations index page (ci.moscow.id.us/244/Construction-Regulations) lists adopted code chapters by title only (Building, Plumbing, Electrical, Fuel Gas, Mechanical, Existing Building, Property Maintenance, Energy Conservation, Residential) without publishing the specific edition years for any of them on that page; the City's Municipal Code chapter text (which would state exact editions and local amendment sections) was not independently reachable within this research pass. Specific edition years are omitted here rather than assumed to match a neighboring jurisdiction's editions.. Local amendments apply — see the Moscow overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moscow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.