Electric Vehicle (EV) Charger Permit in Moscow, Idaho

Moscow publishes no distinct EV-charger permit type or fee line — confirmed against the Building Safety Division page and the City of Moscow FY2026 Fee Schedule, neither of which contains an EV-charger/EVSE entry. A new circuit or outlet installed to serve a residential EV charger is fee-assessed under the general Electrical Permit's 'Extension or Addition of Circuits' category (a new dedicated EV circuit is typically one circuit, billed at the 'up to 6 circuits' rate); a panel/service upgrade for a higher-amperage Level 2 charger would instead fall under the Electrical Service Change Out fee.

Verified 2026-07-20 · Source

When you need this permit

  • A new circuit or outlet for an EV charger requires an Electrical Permit under the City's locally adopted National Electrical Code (NEC)
  • Fee-assessed under the 'Extension or Addition of up to 6 Circuits' category for a typical single dedicated EV charger circuit
  • A panel/service upgrade (e.g., to support a Level 2 charger) is instead fee-assessed under the Electrical Service Change Out category
  • Submitted to the City of Moscow Community Development Office, 504 S. Washington Street
  • Permit Issuance Fee charged in addition to the circuit/service fee, except for flat-fee, Commercial, and Institutional permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Extension or Addition of up to 6 Circuits (applies to a typical new EV charger circuit)City of Moscow FY2026 Fee Schedule, Schedule C — no distinct EV-charger fee line exists; this is the general fee category a new dedicated circuit falls under
$48.00
Electrical Service Change Out (applies if a panel/service upgrade is needed for a Level 2 charger)City of Moscow FY2026 Fee Schedule, Schedule C, page 7
$73.75
Permit Issuance FeeCity of Moscow FY2026 Fee Schedule, page 8
$32.75

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charger Permit permit actually take in Moscow?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    New circuit wiring inspected before concealment

  2. 2

    Final (Certificate of Compliance - Electrical)

    Final electrical inspection, $79.00 fee per the FY2026 Fee Schedule Inspections - Certificate of Compliance table

See the full Moscow inspection guide — scheduling & re-inspection fees →

Tips

  • There is no Moscow-specific 'EV charger permit' — a new circuit for EV charging is billed under the standard 'Extension or Addition of up to 6 Circuits' fee ($48.00), and a panel/service upgrade under the 'Electrical Service Change Out' fee ($73.75).
  • No EV-specific city page or fee line was located during this research pass; this entry documents the applicable general mechanism rather than an EV-confirmed fee.

Frequently asked questions

Moscow has not published EV-specific guidance, but a new electrical circuit or outlet to serve an EV charger requires a standard Electrical Permit, billed under the 'Extension or Addition of up to 6 Circuits' fee ($48.00) per the City of Moscow FY2026 Fee Schedule.

In Moscow, the published Extension or Addition of up to 6 Circuits (applies to a typical new EV charger circuit) is: $48.00. Additional published fees: Electrical Service Change Out (applies if a panel/service upgrade is needed for a Level 2 charger) — $73.75; Permit Issuance Fee — $32.75. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Moscow does not publish a plan-review timeline for this permit. Contact City of Moscow Building Safety Division (Community Development Department) at (208) 883-7022 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Moscow requires 2 inspection(s) for an electric vehicle (ev) charger permit, in order: Rough Electrical, Final (Certificate of Compliance - Electrical). Schedule each through City of Moscow Building Safety Division (Community Development Department) ((208) 883-7022).

Apply through City of Moscow Building Safety Division (Community Development Department) at 504 S. Washington Street, Moscow, ID 83843. Phone: (208) 883-7022, email: jgoodwin@ci.moscow.id.us. Office hours: Community Development / Building Division, 504 S. Washington Street, Moscow, ID 83843. Building Official: Justin Goodwin, CBO, (208) 883-7014, jgoodwin@ci.moscow.id.us, fax (208) 883-7033. Inspection requests: (208) 883-7022, requests should be made the day prior to the requested inspection; field inspections generally completed 8:00 AM-5:00 PM.. Official information: https://www.ci.moscow.id.us/243/Building-Safety.

Moscow, Idaho has adopted: The City of Moscow independently administers and issues its own building permits within Moscow city limits through its Building Safety Division, part of the Community Development Department — this is a distinct office from the Latah County Planning & Building Department (522 South Adams Street, Moscow, ID), confirmed by the City's own Homeowner's Guide to Construction Permits and Inspections, which lists 'Latah County Planning/Building, (208) 883-7220' as a separate entry in its Useful Telephone Numbers page, distinct from the City's own Community Development line. Source: City of Moscow Homeowner's Guide to Construction Permits and Inspections (Building Division, Justin Goodwin CBO), https://www.ci.moscow.id.us/DocumentCenter/View/21221/City-of-Moscow-Project-Process-PDF, page 19; International Building Code (IBC), locally adopted and administered by the City of Moscow — specific edition year not published on the City's Construction Regulations index page as of 2026-07-04; the page lists 'International Building Code' as Chapter 01 of the City's adopted code chapters without stating the edition. Source: City of Moscow Construction Regulations page, https://www.ci.moscow.id.us/244/Construction-Regulations; International Residential Code (IRC), locally adopted and administered by the City of Moscow (Chapter 16 of the City's adopted code chapters); specific edition year not published on the Construction Regulations index page. Source: City of Moscow Construction Regulations page; Uniform Plumbing Code (UPC), locally adopted (Chapter 02 of the City's adopted code chapters) — notably the Uniform Plumbing Code rather than the International Plumbing Code; specific edition year not published on the index page. Source: City of Moscow Construction Regulations page; National Electrical Code (NEC), locally adopted (Chapter 03 of the City's adopted code chapters); specific edition year not published on the index page. Source: City of Moscow Construction Regulations page; International Fuel Gas Code (IFGC), locally adopted (Chapter 04 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Mechanical Code (IMC), locally adopted (Chapter 10 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Existing Building Code (IEBC), locally adopted (Chapter 12 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Property Maintenance Code (IPMC), locally adopted (Chapter 13 of the City's adopted code chapters). Source: City of Moscow Construction Regulations page; International Energy Conservation Code (IECC), locally adopted (Chapter 15 of the City's adopted code chapters); the City separately publishes an Energy Conservation Plan Review Supplement. Source: City of Moscow Construction Regulations page and Plan Review Information page, https://www.ci.moscow.id.us/256/Plan-Review-Information; Idaho Building Code Act (Idaho Code Title 39, Chapter 41) makes building code standards a matter of statewide concern; local governments that issue building permits and perform code enforcement (such as the City of Moscow) must adopt the International Building Code and Idaho Residential Code as amended by the Idaho Building Code Board through negotiated rulemaking. Source: Idaho Legislature, Idaho Code Title 39 Chapter 41 (39-4116), https://legislature.idaho.gov/statutesrules/idstat/title39/t39ch41/; NOTE ON OMISSION: The City of Moscow's Construction Regulations index page (ci.moscow.id.us/244/Construction-Regulations) lists adopted code chapters by title only (Building, Plumbing, Electrical, Fuel Gas, Mechanical, Existing Building, Property Maintenance, Energy Conservation, Residential) without publishing the specific edition years for any of them on that page; the City's Municipal Code chapter text (which would state exact editions and local amendment sections) was not independently reachable within this research pass. Specific edition years are omitted here rather than assumed to match a neighboring jurisdiction's editions.. Local amendments apply — see the Moscow overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moscow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.