Manufactured/Modular/Mobile Home Installation Permit — Unincorporated Latah County, Idaho · Requirements sheet
Verified 2026-07-04 · Source: https://codelibrary.amlegal.com/codes/latahcountyid/latest/latahcounty_id/0-0-0-1266
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured/Modular/Mobile Home Installation Permit in Unincorporated Latah County, Idaho
Required under Code of Latah County Section 7-1-5 for installation of any HUD-approved manufactured or modular home, or pre-HUD mobile home (built before June 15, 1976) with a valid rehabilitation certificate, in unincorporated Latah County.
Verified 2026-07-04 · Source
When you need this permit
- Valid installation permit (and foundation permit when applicable) issued by the Department of Planning and Building
- Passed inspections and a certificate of occupancy under the same requirements as any other single-family dwelling
- If installed in a legal manufactured home park, the park's approved development-plan setbacks control (in addition to Building Code setbacks)
- Application must include the license number and name of the contractor and licensed installer
- Installation must meet the state-approved installation instructions for the specific unit/model, or the current Idaho Manufactured Home Installation Standard
- Every installation requires a permit, including moving a home within a legally approved park or replacing a home in an existing space
- Structural changes/additions require plans stamped by an Idaho-licensed engineer; manufactured buildings cannot change occupancy classification
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Installation Inspection
Required to confirm compliance with the state-approved installation instructions or Idaho Manufactured Home Installation Standard.
- 2
Final / Certificate of Occupancy
Required under the same standards as any other single-family dwelling before occupancy.
See the full Unincorporated Latah County inspection guide — scheduling & re-inspection fees →
Tips
- Every manufactured/modular/mobile home installation requires its own permit — this includes moving an existing home to a different space within the same legally approved park.
- Manufactured buildings cannot change occupancy (e.g., cannot later be converted to a different use classification).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Latah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Latah County
Compare manufactured/modular/mobile home installation permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Unincorporated Latah County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Latah County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →