Solar PV Permit — Unincorporated Latah County, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://api.latah.id.us/web/DownloadFile?filename=PlanningBuilding%5CFee%20Schedules%5CFee%20Schedule%20-%20Development%20Services.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit in Unincorporated Latah County, Idaho
Latah County publishes a distinct per-square-foot valuation rate for 'solar panels' ($5.00/sq ft) in its Development Services Fee Schedule, Table 1-A, used to compute a standard valuation-based Building Permit fee for rooftop or larger ground-mounted PV installations. Separately, the Code of Latah County Section 7-1-3(A) unconditionally exempts small freestanding solar collectors (not exceeding 200 sq ft and no higher than 10 ft) from BOTH a building permit AND the Zoning Placement Permit that otherwise applies to most permit-exempt structures. Electrical interconnection is handled by the Idaho Division of Occupational and Professional Licenses (DOPL), not the county, consistent with the statewide Idaho pattern documented elsewhere in this corpus (Latah has adopted no electrical code of its own).
Verified 2026-07-20 · Source
When you need this permit
- Building Permit required for rooftop-mounted PV systems and for ground-mounted/freestanding solar collectors exceeding 200 sq ft or taller than 10 ft, valued at $5.00 per sq ft under Table 1-A of the county's Fee Schedule
- UNCONDITIONALLY EXEMPT from both a building permit and the Zoning Placement Permit: freestanding solar collectors not exceeding 200 sq ft and not higher than 10 ft, per Code of Latah County Section 7-1-3(A)
- Written septic/sewer approval (North Central District Health Department or municipality) and written road-access approval (ITD, highway district, or municipality) are standard building-permit submittal requirements per Section 7-1-3(B), subject to narrow exemptions for certain accessory-structure permits
- Idaho-licensed Engineer or Architect required to submit structural drawings for structures governed by the IBC, per Section 7-1-3(E) — relevant for larger ground-mount racking/foundation systems
- Electrical interconnection (arrays, inverters, point of connection) requires a separate Idaho DOPL Electrical Permit — Latah County has adopted no electrical code and does not issue electrical permits itself
- Permit becomes null and void if no inspection is requested/performed within 180 days of issuance or within 180 days of the most recent inspection, per Section 7-1-3(C)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Zoning Inspection (if a Zoning Placement Permit applies)
Confirms setback and zoning compliance before/after placement, per Section 7-1-3(A)(3)
- 2
State Rough-In / Final Electrical Inspection
Performed by Idaho DOPL, not the county — verifies wiring, combiners, disconnects, and point of connection
- 3
County Final Inspection
Confirms mounting/structural work complete per approved plans, where a full Building Permit was required
See the full Unincorporated Latah County inspection guide — scheduling & re-inspection fees →
Tips
- A small freestanding ground-mount solar collector (≤200 sq ft, ≤10 ft tall) needs NO county permit at all — not even the Zoning Placement Permit that otherwise applies to most exempt structures — but it still needs its own separate DOPL Electrical Permit for the wiring if it is grid-tied.
- Larger installations (most rooftop residential PV systems, or any ground-mount exceeding the small-collector threshold) are valued at $5.00/sq ft under the county's own published fee table and processed as a standard valuation-based Building Permit — budget using that per-square-foot figure, not a flat solar fee.
- Because Latah adopted no electrical code of its own, budget separately for the Idaho DOPL Electrical Permit (interconnection) in addition to whatever county building/zoning fee applies to the mounting/structural work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Latah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Latah County
Solar PV Permit in other cities
Compare solar pv permit fees across Idaho →
Look up this fee in a different city →