Donnelly building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Donnelly, Idaho.

Verified 2026-08-02 · Source

How to schedule

Inspections are requested through the building department below.

Address
169 Halferty Street, PO Box 725, Donnelly, ID 83615
Phone
(208) 325-8859
Office hours
Mon–Thu 9:00 AM – 5:00 PM (City Hall; closed Fridays — leave a detailed message after hours or on weekends)

Published scheduling rules

  • Valley County currently performs all building inspections for the City of Donnelly on Donnelly's behalf — give at least 24 hours' notice when scheduling inspections. (Residential Building Permit (New Construction))

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Soils / Excavation

    Initial site/soils inspection prior to foundation work

  2. 2

    Footing / Hole

    Before concrete pour — footing excavation and forms

  3. 3

    Foundation

    Foundation walls, rebar, anchor bolts

  4. 4

    Slab

    Slab-on-grade prior to concrete pour, where applicable

  5. 5

    Frame

    Structural framing complete before insulation or wall cover

  6. 6

    Roof and Wall Sheathing

    Sheathing verified before house wrap and roofing materials applied

  7. 7

    House Wrap, Ice and Water Shield

    Weather barrier and ice/water shield installation

  8. 8

    Roof Covering

    Final roofing material installation

  9. 9

    Insulation

    Insulation installer certification of type, manufacturer, and R-value required per 2018 IRC Sec. N1101.16

  10. 10

    Siding

    Exterior siding installation

  11. 11

    Final

    All work complete; Donnelly Fire must sign off on any propane tanks before final/certificate of occupancy

Applies to: Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements)

  1. 1

    Soils / Excavation

    Initial site/soils inspection prior to foundation work

  2. 2

    Footing / Hole

    Before concrete pour -- footing excavation and forms

  3. 3

    Foundation

    Foundation walls, rebar, anchor bolts

  4. 4

    Slab

    Slab-on-grade prior to concrete pour, where applicable

  5. 5

    Frame

    Structural framing complete before insulation or wall cover

  6. 6

    Roof and Wall Sheathing

    Sheathing verified before house wrap and roofing materials applied

  7. 7

    Insulation

    Insulation installer certification of type, manufacturer, and R-value required per 2018 IRC Sec. N1101.16 (or the corresponding IBC/IECC commercial provision)

  8. 8

    Siding / Exterior Wall Covering

    Exterior wall covering installation

  9. 9

    Final

    All work complete; Donnelly Fire must sign off on any propane tanks before final/certificate of occupancy

Applies to: EV Charger / EVSE Permit (State of Idaho Electrical Permit)

  1. 1

    Rough-In

    Wiring and conduit installed before walls closed (if applicable)

  2. 2

    Final

    Charger circuit/unit installed, breaker sized correctly, energized

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Donnelly building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Donnelly building permits

Get alerts for Donnelly