Construction Permit — Deck / Accessory Structure (Garage, Shed) — East Helena, Montana · Requirements sheet
Verified 2026-07-03 · Source: https://easthelenamt.us/coeh/planning-zoning-building/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Construction Permit — Deck / Accessory Structure (Garage, Shed) in East Helena, Montana
Required for construction of decks, private garages, and accessory storage structures within East Helena city limits, issued under the city's Building (B) program. Structures for the owner's own use consisting only of minor work (see Informational Building Permit) may qualify for the lower-fee track; new construction of a deck, garage, or accessory building otherwise uses the standard Construction Permit Application and Plan Submittal Requirements.
Verified 2026-07-03 · Source
When you need this permit
- Zoning Application must be approved before the Building Permit Application is submitted
- Construction Permit Application (Building & Safety) required, with project valuation, owner/contractor information, and description of project
- Exterior deck framing connection detailing to supports, and railing post connections, must be shown per the city's Plan Submittal Requirements where a deck is part of new construction or an addition
- Site plan showing property lines, existing/proposed structures (including decks/porches), and distances to property lines is required
- A private garage or storage structure used only for the owner's own use may qualify for the Informational Building Permit ($25.00) only for the specific minor-work categories under City Code 4-1-13 — new construction of a garage/accessory structure itself requires the standard Construction Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing Inspection
Made when forms and footing steel/post footings are in place, prior to concrete placement
- 2
Framing Inspection
Made after framing, sheathing, and bracing are in place, before any covering is applied
- 3
Final Inspection
Completed structure verified against approved plans
See the full East Helena inspection guide — scheduling & re-inspection fees →
Tips
- Decks, garages, and accessory structures still require the Zoning Application step before a Building Permit Application will be accepted.
- reviewTimelineDays follows the same MCA 50-60-106(2)(c) statutory floor (10 working days) used for the general residential building permit, since East Helena publishes no permit-type-specific turnaround of its own for accessory structures or decks.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the East Helena building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in East Helena
Construction Permit — Deck / Accessory Structure (Garage, Shed) in other cities
Compare construction permit — deck / accessory structure (garage, shed) fees across Montana →
Look up this fee in a different city →
Now live
Build your East Helena project checklist
Describe your project once and get every permit, document, and fee it triggers in East Helena — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →