Accessory Structure / Deck Permit in Glasgow, Montana
Required for decks over 2 feet off the surrounding ground and for detached accessory buildings/sheds larger than 120 square feet (10'x12') within Glasgow city limits. Uses the same combined Application for Building Permit as new construction.
Verified 2026-07-03 · Source
When you need this permit
- Building permit required for: new construction of detached or attached garages/carports; decks over 2 feet off the surrounding ground; accessory buildings or sheds in excess of 120 square feet (10'x12')
- NOT required for detached accessory buildings/sheds that are 120 square feet or smaller
- Garage size is capped by lot size: under 7,000 sq ft lot allows up to 1,000 sq ft garage; 7,000-10,000 sq ft lot allows up to 1,200 sq ft; over 10,000 sq ft (contiguous if more than one lot) allows up to 1,600 sq ft maximum residential garage
- A detached garage closer than 10 feet to a residential or commercial building is treated as 'attached' and requires a firewall facing the building: no windows, solid wood or steel door with no window lights, interior wall covered with 5/8-inch sheetrock
- Setback/offset requirements measured from the wall to the property line apply in every zoning district and are non-negotiable; where access is from an alley, the setback from the structure to the edge of the alley must be 20 feet
- Ordinance No. 966 property-pin requirement applies: pins must be established and witnessed by the Building Inspector before permit issuance if the project modifies the structure's footprint
- Plot plan and construction plan/elevations required per the standard Building Permit Application Instructions (minimum 2 complete sets of plans for garages/remodel-scale projects)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Glasgow inspection guide — scheduling & re-inspection fees →
Tips
- Sheds and detached accessory buildings 120 sq ft (10'x12') or smaller need NO building permit at all in Glasgow — this is one of the few outright exemptions the City publishes.
- If your detached garage will sit closer than 10 feet from your house or another building, budget for firewall construction (solid door, no window lights, 5/8-inch sheetrock) since it will be treated as 'attached' under the code.
- Garage size maximums scale with lot size — check your lot square footage against the 1,000/1,200/1,600 sq ft tiers before finalizing garage plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glasgow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Glasgow
Accessory Structure / Deck Permit in other cities
Compare accessory structure / deck permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Glasgow project checklist
Describe your project once and get every permit, document, and fee it triggers in Glasgow — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →