Skip to main content
PermitBase

Mechanical / HVAC Permit (State-Issued) in Glasgow, Montana

Because Glasgow's DLI certification is Building (B) ONLY per the official DLI roster (no 'M' shown), this KB treats mechanical/HVAC work anywhere within Glasgow city limits as requiring a Mechanical Permit issued directly by the Montana DLI Building Codes Bureau in Helena. Note: the City's own Building Permit Packet contains conflicting language, at one point stating the City itself issues mechanical permits alongside building permits — see the codesAdopted discrepancy note. Applicants should confirm directly with the City (406-228-2476 ext. 8) which office to file with before submitting.

Verified 2026-07-03 · Source

When you need this permit

  • Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule
  • Type of Building and Type of Work must be indicated
  • Boiler work requires a separate Boiler Permit form, not the Mechanical Permit
  • Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Mechanical Permit — project value $0-$10,000Montana Building Codes Bureau, Application for Mechanical Permit (BCP-1, Rev. 06/2022) statewide fee schedule
$48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof
Mechanical Permit — project value $10,001-$50,000Application for Mechanical Permit (BCP-1, Rev. 06/2022)
$166 for the first $10,000, plus $9 for each additional $1,000 or fraction thereof
Mechanical Permit — project value $50,001 or moreApplication for Mechanical Permit (BCP-1, Rev. 06/2022)
$514 for the first $50,000, plus $6 for each additional $1,000 or fraction thereof

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical / HVAC Permit (State-Issued) permit actually take in Glasgow?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Glasgow inspection guide — scheduling & re-inspection fees →

    Tips

    • CONFIRM WITH THE CITY FIRST: unlike electrical and plumbing (unambiguously state-routed per both the DLI roster and the City's own packet), mechanical permit routing in Glasgow is ambiguous in the City's own documentation. Call the Building Codes Department at (406) 228-2476 ext. 8 before assuming which office (City or State DLI) to file a mechanical permit application with.
    • A mechanical permit is required to have any gas hooked up to a residential or commercial building, per the City's Building Permit Packet, regardless of which office ultimately issues it.

    Frequently asked questions

    Glasgow requires a mechanical / hvac permit (state-issued) for: Project Value must be provided; permit fee is calculated from the state's valuation-based fee schedule; Type of Building and Type of Work must be indicated; Boiler work requires a separate Boiler Permit form, not the Mechanical Permit; Apply in accordance with Title 50, Chapter 60, Section 104, MCA and ARM 24.301.172. If your project isn't listed, confirm with City of Glasgow Public Works Department / Building Codes Department — Rod Dees, Code Compliance Officer; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Glasgow city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 228-2476 before starting work.

    In Glasgow, the published Mechanical Permit — project value $0-$10,000 is: $48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof. Additional published fees: Mechanical Permit — project value $10,001-$50,000 — $166 for the first $10,000, plus $9 for each additional $1,000 or fraction thereof; Mechanical Permit — project value $50,001 or more — $514 for the first $50,000, plus $6 for each additional $1,000 or fraction thereof. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Glasgow does not publish a plan-review timeline for this permit. Contact City of Glasgow Public Works Department / Building Codes Department — Rod Dees, Code Compliance Officer; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Glasgow city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 228-2476 for current turnaround.

    You'll need: Application for Mechanical Permit (BCP-1). See the required-documents checklist on this page for details on each.

    Apply through City of Glasgow Public Works Department / Building Codes Department — Rod Dees, Code Compliance Officer; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Glasgow city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 319 3rd Street South, Glasgow, MT 59230. Phone: (406) 228-2476, email: codecompliance@cityofglasgowmt.com. Office hours: City Hall: Monday-Friday, 8:00 AM-12:00 PM and 1:00 PM-5:00 PM, closed federal holidays. Code Compliance Officer Rod Dees: (406) 228-2476 ext. 8, cell (406) 263-3386. Public Works Department can also be reached at (406) 228-2476 ext. 4 for pre-submittal project discussions.. Official information: https://www.cityofglasgowmt.com/public-works-department.

    Glasgow, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs list (bsd.dli.mt.gov/building-codes-permits).; Glasgow is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Rod Dees, (406) 228-2476. Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster, updated 04/22/2026, https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf, which lists 'Glasgow | B | Rod Dees | 228-2476 | City Limits'.; Per the City of Glasgow's own 'General Information for Building Permit Applications' packet (Public Information Sheet GIPBA No. 4, dated 11/17/2021): all building designs and plans must adhere to the 2018 International Residential Code, 2018 International Building Code, 2018 International Mechanical Code, 2018 International Existing Building Code, 2018 International Fuel Gas Code, 2018 International Swimming Pool and Spa Code, 2012 International Energy Code, and the 2018 Uniform Plumbing Code, plus applicable local zoning codes. Source: City of Glasgow Building Permit Packet, cityofglasgowmt.com/_files/ugd/2ff7f3_a263251865d842a9b7db016c72ebf448.pdf; The 2021 editions govern. The City's own permit packet (dated 11/17/2021) cites 2018-edition I-codes and the 2012 IECC, while Montana DLI's statewide Current Codes page lists 2021 editions; Glasgow's own Municipal Code settles the discrepancy — Chapter 8, Article II adopts the 2021 editions by section, each 'Pursuant to MCA 50-60-301 and ARM 24.301.202'. The City packet is simply out of date relative to the City's own codified ordinance. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; The City of Glasgow's own Building Permit Packet contains an internal inconsistency regarding Mechanical permits: one bullet in the 'General Information' page states 'The City of Glasgow also issues plumbing/mechanical permits,' while a later 'NOTICE' section in the same packet states plainly: 'The City of Glasgow covers Building Permits and Mechanical Permits; the State of Montana issues plumbing and electrical plans for work in the city.' The DLI's own certified-jurisdictions roster (updated 04/22/2026) lists Glasgow's certification as 'B' ONLY, with no 'M' code shown (contrast with e.g. Havre or Choteau, also 'B' only, or Belgrade/Billings which show explicit 'M' certification). Given the DLI roster is the authoritative statewide certification record, this KB treats Mechanical permits in Glasgow as STATE-ISSUED (routed to the DLI Building Codes Bureau) consistent with the official 'B'-only certification, while flagging the City's own document's contrary claim as an unresolved discrepancy applicants should verify directly with (406) 228-2476 ext. 8 before assuming which office issues a mechanical permit.; International Building Code, 2021 edition — adopted at Code of Ordinances Sec. 8-23, 'as amended by ARM 24.301.131 and all accompanying appendices, amendments, and modifications adopted by the building codes bureau, state department of labor and industry', pursuant to MCA 50-60-301 and ARM 24.301.202. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; International Residential Code, 2021 edition — adopted at Code of Ordinances Sec. 8-24, as amended by ARM 24.301.154, for detached single- or two-family dwellings and townhouses not more than three stories and their accessory structures. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; International Fuel Gas Code — adopted at Code of Ordinances Sec. 8-25 'as adopted by the state in ARM 24.301.173'. NOTE: Sec. 8-25 is the one adoption section in Article II that cites NO edition year of its own; the edition is whatever ARM 24.301.173 currently carries. Stated as the section states it rather than assumed to be 2021 by analogy with Secs. 8-23, 8-24, 8-26 and 8-27. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; International Existing Building Code, 2021 edition — adopted at Code of Ordinances Sec. 8-26, as amended by ARM 24.301.171, usable 'as an alternative prescriptive method for the remodel, repair, alteration, change of occupancy, addition, and relocation of existing buildings'. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; International Energy Conservation Code, 2021 edition — adopted at Code of Ordinances Sec. 8-27, as amended by ARM 24.301.161. This supersedes the 2012 IECC cited in the City's own 2021 permit packet. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; Uniform Federal Accessibility Standards (current edition, published by the General Services Administration) — adopted by reference at Code of Ordinances Sec. 8-28(a), together with the appendices, amendments and modifications adopted by the state building codes bureau as set out in the Administrative Rules of Montana. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; Uniform Plumbing Code (current edition, published by the International Association of Plumbing and Mechanical Officials) — adopted by reference at Code of Ordinances Sec. 8-88(a), with the ARM amendments. NOTE this is a UPC jurisdiction for plumbing, not an IPC one; plumbing permits themselves are issued by the Montana DLI rather than the City, per localAmendments. City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) (nodeId COOR_CH8BUBURE); codification current through Ordinance No. 981, adopted 2022-08-15, online content updated 2023-12-01.; City of Glasgow Code of Ordinances Chapter 8 (Buildings and Building Regulations), Article II (Technical Codes) adopts seven codes by section.. Local amendments apply — see the Glasgow overview page for the full list.

    This is unresolved in the City's own published materials: the DLI's certified-jurisdictions roster lists Glasgow as Building-only certified (no Mechanical 'M' code), implying state routing, but the City's own Building Permit Packet states in one place that the City 'also issues plumbing/mechanical permits.' Confirm directly with the City Building Codes Department, (406) 228-2476 ext. 8, before filing.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glasgow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Glasgow's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Glasgow yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Glasgow lands. Privacy.