Solar Photovoltaic (PV) Permit in Glasgow, Montana
Required for installation of rooftop or ground-mount solar photovoltaic systems within Glasgow city limits. Requires a City Building Permit (structural/racking, issued by the City's own Code Compliance Officer) plus a State of Montana Electrical Permit (wiring/interconnection) -- Glasgow is city-certified for Building permits only; Electrical, Plumbing, and Mechanical permits within city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City.
Verified 2026-07-20 · Source
When you need this permit
- City Building Permit Packet submitted to the City's Code Compliance Officer for the structural/racking scope
- Electrical wiring/interconnection scope requires a State of Montana electrical permit application, not a City permit -- Glasgow is not electrically-certified
- Licensed electrical contractors apply for a standard electrical permit and select 'Solar' as the Alternative Energy Source on the state application form; non-electrician installers submit the state's Alternate Energy Permit instead, per the Montana Building Codes Bureau's Alternative Energy Information guidance
- State application must specify whether the solar installation is a Micro Inverter/AC Module System or a PV String System, and whether the system produces 90 or more volts of electricity
- Per the state Application for Residential Contractor Electrical Permit (Rev 6/24), a residential 'Alternative Energy' line item carries its own flat state fee, separate from the amperage-based service fees
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Performed by the Montana Building Codes Bureau's regional electrical inspector; wiring, disconnect placement, and interconnection point verified before energizing
- 2
City Final Inspection (Building)
Racking/roof-penetration attachment and structural compliance verified by the City's Code Compliance Officer
See the full Glasgow inspection guide — scheduling & re-inspection fees →
Tips
- Glasgow splits solar permitting across two agencies: the City issues the structural Building Permit, but the State of Montana Building Codes Bureau (not the City) issues the electrical permit, since Glasgow is certified for Building only.
- On the state electrical permit application, be sure to check 'Yes' to the Alternative Energy Source question and specify Solar plus your system type (Micro Inverter/AC Module vs. PV String) -- this determines how the application is processed.
- The City's own building-permit fee schedule is not published in any document found online as of this review -- get a written quote directly from the Code Compliance Officer before budgeting.
- You can apply for the state electrical permit online at ebiz.mt.gov/bcb rather than mailing a paper form.
- Re-chase pass (2026-07-20): downloaded and read the current (Rev 6/24) Application for Residential Contractor Electrical Permit and Application for Commercial Electrical Permit PDFs directly from bsd.dli.mt.gov — both are live today and match this entry's figures exactly (line K 'Alternative Energy' = $45 flat on the residential form; the $45/$75/$255/$455 tiered commercial schedule verbatim, including the $60 renewal/request-inspection fees). Cross-checked against ARM 24.301.461(1)(o), the codified administrative rule, which lists a separate $65 flat fee for 'Renewable energy system: net metering system or off-grid electrical generating system (photovoltaic (PV) system, wind generator, hydro turbine, etc.)' -- this figure differs from the application forms and was not found reflected on either current PDF, so the live application-form figures (what an applicant actually submits and pays against) are treated as the controlling, currently-charged fee; the ARM figure is noted here for a future re-chase in case DLI updates its forms to match the rule text.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glasgow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Glasgow
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Glasgow project checklist
Describe your project once and get every permit, document, and fee it triggers in Glasgow — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →