Skip to main content
PermitBase

Electrical Permit (State-Issued) in Conrad, Montana

Because Conrad is DLI-certified for Building only, electrical work anywhere within Conrad city limits requires a Residential (or Commercial) Electrical Permit issued directly by the Montana DLI Building Codes Bureau in Helena, not by the City of Conrad, under the 2020 NEC.

Verified 2026-07-03 · Source

When you need this permit

  • Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
  • Payment must be submitted with the application; incomplete applications are returned unprocessed
  • Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
  • Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
  • The City of Conrad's own Building Permit Application form states under NOTICE that separate permits are required for electrical work, confirming it is not handled by the City

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time)Montana Building Codes Bureau, Application for Residential Electrical Permit (Rev. 12/22) — same statewide fee schedule applied to all non-electrically-certified Montana jurisdictions, including Conrad; figure cross-verified against the identical schedule already confirmed for Choteau, MT in this same research effort
$200
Single Family Dwelling or Cabin — 201 to 400-amp serviceApplication for Residential Electrical Permit (Rev. 12/22)
$380
Residential Change of Service — exterior meter base & interior/exterior main disconnect onlyApplication for Residential Electrical Permit (Rev. 12/22)
$45

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit (State-Issued) permit actually take in Conrad?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Conrad inspection guide — scheduling & re-inspection fees →

    Tips

    • Electrical permits for any Conrad address are issued by the STATE Building Codes Bureau in Helena, not the city — mail applications and payment to PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov.

    Frequently asked questions

    Conrad requires an electrical permit (state-issued) for: Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work; Payment must be submitted with the application; incomplete applications are returned unprocessed; Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided; Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431; The City of Conrad's own Building Permit Application form states under NOTICE that separate permits are required for electrical work, confirming it is not handled by the City. If your project isn't listed, confirm with City of Conrad Building & Zoning Department — Building Official Keith Thaut; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Conrad city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 271-5821 before starting work.

    In Conrad, the published Single Family Dwelling or Cabin — up to 200-amp service (includes meter base and attached garages if wired at the same time) is: $200. Additional published fees: Single Family Dwelling or Cabin — 201 to 400-amp service — $380; Residential Change of Service — exterior meter base & interior/exterior main disconnect only — $45. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Conrad does not publish a plan-review timeline for this permit. Contact City of Conrad Building & Zoning Department — Building Official Keith Thaut; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Conrad city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 271-5821 for current turnaround.

    You'll need: Application for Residential Electrical Permit. See the required-documents checklist on this page for details on each.

    Apply through City of Conrad Building & Zoning Department — Building Official Keith Thaut; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical/HVAC permits within Conrad city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 413 South Main Street, Conrad, MT 59425-2337. Phone: (406) 271-5821, email: office@cityofconrad.com. Office hours: City Hall: Monday-Friday, 7:00 AM - 3:30 PM. Building Inspector Keith Thaut should be called directly at (406) 271-5821 before construction begins so inspections can be scheduled; approval times from the Building Inspector may vary. Building & Zoning general line (406) 271-3623, fax (406) 271-5602..

    Conrad, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs (bsd.dli.mt.gov/building-codes-permits).; Conrad is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Keith Thaut, (406) 271-5821. Verified directly against the DLI Building Codes Bureau's 'Montana Certified Local Government Program' roster PDF, updated 04/22/2026: 'Conrad | B | Keith Thaut | 271-5821 | City Limits'. Source: https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf; City of Conrad Municipal Code Title 4, Chapter 1 (Building Codes and Regulations), Section 4-1-1 (Adoption of Codes), last amended by Ordinance 425 (8-9-2022): adopts 'the state building code' referenced in Mont. Code Ann. Section 50-60-203 (2021), consisting of: (1) International Building Code (IBC), 2021 Edition, as described in and amended by ARM 24.301.131; (2) International Residential Code (IRC), 2021 Edition, as described in and amended by ARM 24.301.154; (3) International Energy Conservation Code (IECC), 2021 Edition, as amended by ARM 24.301.161; (4) International Existing Building Code (IEBC), 2021 Edition, as described in and amended by ARM 24.301.171. Source: City of Conrad Municipal Code 4-1-1, https://codelibrary.amlegal.com/codes/conradmt/latest/conrad_mt/0-0-0-728 (also verified via the City's own Building Permit Packet PDF); The City's Building Permit Packet 'Validity of Permit/Disclaimer' form (signed by every applicant) additionally names the International Mechanical Code, International Fuel Gas Piping Code, ICC A117.1 Accessibility Standards, the Uniform Plumbing Code, and the National Electrical Code as codes/standards referenced for construction in Conrad — consistent with the statewide code set enforced by the DLI even though Conrad itself is not separately certified in the Mechanical/Plumbing/Electrical trades. Source: City of Conrad Building Permit Packet PDF (Validity of Permit/Disclaimer page), https://www.cityofconrad.com/_files/ugd/984806_971dc8cb30b84475b0f2cd026eed99df.pdf; Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Conrad's own municipal code (Title 4-1-1) names the same 2021 IBC/IRC/IECC/IEBC editions without authoring independently amended code text, consistent with a small B-only-certified jurisdiction enforcing the state-adopted editions. Source: bsd.dli.mt.gov/building-codes-permits/current-codes. Local amendments apply — see the Conrad overview page for the full list.

    The Montana Department of Labor & Industry Building Codes Bureau issues electrical permits for Conrad — the city itself only holds Building certification, not Electrical. Apply by mail to PO Box 200517, Helena, MT 59620-0517, or online at ebiz.mt.gov, under the 2020 NEC.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Conrad building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.