Zoning and Building Permit (Commercial New Construction / Addition / Alteration / Repair) — Conrad, Montana · Requirements sheet
Verified 2026-08-26 · Source: https://www.cityofconrad.com/building-permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Zoning and Building Permit (Commercial New Construction / Addition / Alteration / Repair) in Conrad, Montana
Required for new commercial construction, additions, alterations, and repairs within Conrad city limits. Issued by the City of Conrad under its DLI-certified local Building (B) program, using the same combined Zoning and Building Permit Application reviewed by Building Inspector Keith Thaut against the City's adopted 2021 IBC (Municipal Code Title 4, Chapter 1). City Code 4-1-8 (Territorial Application) states the building department's jurisdictional area is 'residential and commercial buildings and structures and permits therefore within the corporate limits of the city' -- confirming the City, not Pondera County, is the issuing authority for a commercial project inside Conrad city limits. Outside those city limits, in unincorporated Pondera County, Pondera County itself holds a separate DLI certification for Building, commercial only, with its own certified official, Kyle Harlan -- a project on the same road but across the city-limits line into unincorporated county territory is the County's permit, not the City's. Because Conrad's own certification is Building only (no Plumbing, Electrical, or Mechanical), commercial plumbing, electrical, and mechanical work within Conrad city limits is issued directly by the Montana DLI Building Codes Bureau, the same trade split documented for residential construction in this jurisdiction.
Verified 2026-08-26 · Source
When you need this permit
- Complete the Zoning and Building Permit Application (Jurisdiction of Conrad): legal description, owner, contractor and architect/engineer contact information, use of building, class of work (New/Addition/Alteration/Repair/Move/Demolition), full description of work, change of use (if any), and valuation of work
- Complete a Plot Plan showing building/site/setback dimensions, easements, finish contours or drainage, first floor elevation, street elevation, sewer service elevation, and location of water/sewer/gas/electrical service lines and survey pins, drawn on a 5-foot grid (1 inch = 20 feet), with north indicated
- Read and sign the Validity of Permit/Disclaimer form acknowledging the City does not control contractors/subcontractors, does not review floodplain location, property lines, or federal ADA compliance, and that issuance of a permit does not constitute approval of any code violation
- The application's Office Use Only block records Type of Construction, Occupancy Group, Number of Stories, Size of Building, Max. Occupant Load, and Off-Street Parking Spaces -- fields the building inspector completes for a commercial project's IBC occupancy classification
- Plans and specifications indicating the entire scope of work must be submitted per City Code 4-1-2.B; the building inspector may require additional documents deemed relevant, or may waive requirements for work of an insubstantial nature or effect
- Confirm the project sits within Conrad's corporate city limits, per City Code 4-1-8 (Territorial Application) -- a commercial project in unincorporated Pondera County outside those limits is permitted by Pondera County (Building, commercial only, Kyle Harlan), not the City
- Call Building Inspector Keith Thaut at (406) 271-5821 before construction begins so inspections can be scheduled; approval times may vary
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City Code 4-1-7 states only: 'Building permit fees shall be set and established by the city council from time to time by appropriate resolution.' This applies to commercial permits on the same… Show full citationHide
City Code 4-1-7 states only: 'Building permit fees shall be set and established by the city council from time to time by appropriate resolution.' This applies to commercial permits on the same combined Zoning and Building Permit Application as residential work, and no fixed valuation-based fee table or separate commercial fee resolution was found published on the City's Building Permits page, Building & Zoning page, or Finance page, or elsewhere online -- the same publication gap already documented for the City's residential Building Permit. The application's Office Use Only block has blank Plan Check Fee and Permit Fee lines filled in by city staff after review; no distinct plan review fee line or percentage was found published for commercial work either. Applicants must contact City Hall at (406) 271-5821 (Building) or (406) 271-3623 (general) for a current quote.Review timeline
Inspection process
- 1
Footing
Required before concrete pour, per City Code 4-1-4.A. Request must be made 72 hours in advance.
- 2
Foundation Wall
Per City Code 4-1-4.B.
- 3
Concrete Slab
Per City Code 4-1-4.C.
- 4
Under Floor (Crawl Space)
Per City Code 4-1-4.D.
- 5
Frame
Walls, trusses, rafters, floor, etc., per City Code 4-1-4.E.
- 6
Energy Efficiency
Insulation, glazing, etc., per City Code 4-1-4.F.
- 7
Wall Board
Per City Code 4-1-4.G.
- 8
Fire Dept. Special Approval
Fire Department review/sign-off tracked as a Special Approval (Required/Received/Not Required) on the Zoning and Building Permit Application's Office Use Only block, alongside Zoning, Health Dept., Plans, Electrical, Plumbing, and Mechanical, before the permit is issued -- the same Special Approval mechanism documented for fire sprinkler/alarm work in this jurisdiction; it is a step within the Building Permit process, not a separate application
- 9
Final
Issue certificate of occupancy, per City Code 4-1-4.H, conducted in accordance with the International Building Code.
See the full Conrad inspection guide — scheduling & re-inspection fees →
Tips
- A commercial project inside Conrad's corporate city limits is the City's Building permit, per City Code 4-1-8; a commercial project in unincorporated Pondera County outside those limits is Pondera County's Building (commercial only) permit -- the two certifications do not overlap, and Pondera County's commercial-only status is unusual among Montana's certified local programs.
- Conrad uses the same combined Zoning and Building Permit Application for commercial as for residential work -- there is no separate commercial application form.
- The application's Office Use Only block adds Type of Construction, Occupancy Group, Max. Occupant Load, and Off-Street Parking Spaces fields that the building inspector completes for a commercial project's IBC occupancy classification.
- No fixed fee schedule or separate plan review fee is published for commercial work; request a fee quote from City Hall before budgeting a project.
- Fire Department review is a Special Approval line item on the same application, not a standalone fire-sprinkler or fire-alarm permit.
- Separate permits are required for Electrical, Plumbing, Heating, Ventilating, or Air Conditioning work on a commercial project -- these are issued by the Montana DLI Building Codes Bureau, not the City, since Conrad is Building-certified only.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Conrad building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Conrad.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Conrad
Zoning and Building Permit (Commercial New Construction / Addition / Alteration / Repair) in other cities
Look up this fee in a different city →
Now live
Build your Conrad project checklist
Describe your project once and get every permit, document, and fee it triggers in Conrad — in one checklist. Free, for any city and any number of projects.
Get started →