Commercial Building Permit (New Construction / Addition / Alteration / Tenant Improvement) in Cut Bank, Montana
Required for new construction, additions, alterations, and tenant improvements to commercial and other non-residential structures within Cut Bank city limits. There is no separate commercial application, guide, or fee schedule -- commercial work is submitted on the same Building Permit Application (Rev. 4.2025) used for residential work, and is identified there by checking 'C' under Permit Type. Reviewed by Building Official Kory Sandon under the City's DLI Building (B)-only certification against the 2021 International Building Code (IBC), the edition Montana adopted statewide effective June 11, 2022. The permit fee is whichever is higher of the City's valuation-based Building Permit Fee Schedule or the fee computed from the ICC Building Valuation Data Table (occupancy group and construction type, priced per square foot), per the application's own fee-calculation instruction.
Verified 2026-08-26 · Source
When you need this permit
- Complete the same City of Cut Bank Building Permit Application (Rev. 4.2025) used for residential work; under 'Permit Type' check 'C' (the form's own printed checkbox set is R, C, Z / S/W, E), and complete the Tenant/Business Name (DBA) and City Business License # fields in Section 2
- Plans reviewed for compliance with the 2021 IBC as adopted statewide by the Montana DLI Building Codes Bureau (effective June 11, 2022) and locally administered under Cut Bank Municipal Code 10-1-1 (Ord. 2007-01, 6-18-2007), which adopts by reference the current editions of the building codes bureau's codes by mayoral administrative order, as authorized by Montana Code Annotated 50-60-301(1)(b)
- Permit fee is calculated as whichever is higher: the Total Project Cost table in the City's Building Permit Fee Schedule, or the fee produced by applying the ICC Building Valuation Data Table's per-square-foot rate for the project's occupancy group and construction type to the building's total square footage -- stated directly on the application's fee line: 'Permit Fee $ (From Fee Schedule or Building Valuation Data Table - whichever is highest)'
- The application's own 'Other Requirements' block (Plot Plan, Curb/Gutter/SW Permit, Excavation Permit, Tapping Fee-Water, Tapping Fee-Sewer, Zoning Permit, Health Department, Fire Department, Soil Report, Building Plans, Other) is marked Not Required, Required, or Attached on a per-project basis by City staff -- Fire Department review is one of these per-project determinations rather than a freestanding fire-plan-review application
- Contractors working in Cut Bank must hold a City business license and current workers' compensation and general liability insurance, the same requirement documented for Cut Bank's residential building permit Contractor
- Minimum 48-inch frost depth (finish grade to bottom of footing) applies citywide, the same standard documented for Cut Bank's residential building permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Cut Bank Building Permit Application (PDF, Rev. Show full citationHide
City of Cut Bank Building Permit Application (PDF, Rev. 4.2025), page 4, 'ICC Building Valuation Data Table - August 2023'; the application's own Section 7 fee field instructs the Permit Fee is calculated 'From Fee Schedule or Building Valuation Data Table - whichever is highest,' making this table's per-square-foot figures the operative fee basis whenever they exceed the flat valuation-tier schedule above -- as is common for larger commercial buildingsReview timeline
Inspection process
- 1
Foundation/Footing
Verify footing width, depth, material, and 48-inch minimum frost depth before concrete pour
- 2
Framing
Framing, sheathing, and structural connections per approved plans and adopted 2021 IBC provisions before walls are closed
- 3
Final
Completed work verified against approved plans, including any Health Department, Fire Department, or other referral conditions marked Required on the application
See the full Cut Bank inspection guide — scheduling & re-inspection fees →
Tips
- Cut Bank has no dedicated commercial application, project guide, or fee schedule -- the same Building Permit Application and valuation table used for residential work applies, with the project distinguished only by the 'C' (Commercial) checkbox under Permit Type and the Tenant/Business Name and City Business License fields in Section 2.
- The permit fee is whichever is higher of the flat valuation-tier Building Permit Fee Schedule or the fee computed from the ICC Building Valuation Data Table's per-square-foot rate for the project's occupancy group and construction type -- a distinction that rarely changes a small residential permit's fee but often determines the fee for a commercial building.
- Cut Bank Municipal Code 10-1-5 sets a 30 working day maximum for building plan review (extendable to 40 working days when outside aid is needed), a considerably longer window than the City's separate homeowner-facing FAQ estimate of 'usually a week or less.'
- Electrical, plumbing, and mechanical permits for commercial work in Cut Bank are issued directly by the Montana DLI Building Codes Bureau, not the City, the same Building (B)-only certification split documented under Cut Bank's electrical-permit-state, plumbing-permit-state, and mechanical-permit-state permit types.
- The application's own 'Other Requirements' block lists Fire Department alongside Health Department and Soil Report as a per-project Required/Not Required determination. Cut Bank has no dedicated local Fire Marshal or fire-code-adoption ordinance -- City Code Title 6, Chapter 2 covers only the volunteer fire department's organization -- and Montana's own statewide 'All Building Codes Adopted by Montana' list (administered by the DLI Building Codes Bureau under ARM 24.301) does not include the International Fire Code. Glacier County is served by Deputy State Fire Marshal Doug Ulsh of the Montana Department of Justice's Fire Prevention & Investigation Section ((406) 431-3172), whose statutory role under Montana Code Annotated Title 50, Chapter 3 covers public-building inspection and fire-prevention-program certification rather than a published commercial building-permit plan-review submission process. Confirm directly with the Building Official which office actually reviews a given commercial project's Fire Department line.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cut Bank building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Cut Bank.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Cut Bank
Commercial Building Permit (New Construction / Addition / Alteration / Tenant Improvement) in other cities
Look up this fee in a different city →
Now live
Build your Cut Bank project checklist
Describe your project once and get every permit, document, and fee it triggers in Cut Bank — in one checklist. Free, for any city and any number of projects.
Get started →