Deck / Accessory Structure Permit (Garage, Pole Barn, Patio Cover) in Cut Bank, Montana
Required for building an uncovered deck, adding a garage, constructing a pole barn, or adding a patio cover within Cut Bank city limits, using the same Building Permit Application as new construction. Effective May 1, 2024, deck installations were explicitly brought under the City's permitting program alongside roofing. Small sheds and minimal decks remain exempt per IRC R105.2.
Verified 2026-07-03 · Source
When you need this permit
- Building Permit Application required for decks, garages, pole barns, and patio covers (not exempt under R105.2)
- Exempt only if: one-story detached accessory structure (shed) 200 sq ft or less in floor area, OR a deck 200 sq ft or less, not more than 30 inches above grade at any point within 36 inches of the deck edge, not attached to the dwelling, and not serving a required exit door under R311.4
- Plot plan showing setbacks from property lines required for all non-exempt accessory structures and decks
- Guide handouts available from the City for adding a garage, building a pole barn, adding a patio cover, and building an uncovered deck
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Required before concrete pour for deck posts, garage foundations, or pole barn footings, verifying the 48-inch frost depth
- 2
Final
Completed structure verified against approved plans and setbacks
See the full Cut Bank inspection guide — scheduling & re-inspection fees →
Tips
- Effective May 1, 2024, the City explicitly added deck installations to its permitting program under new Building Official Kory Sandon — do not assume older guidance that decks were unregulated still applies.
- A deck is exempt from a building permit ONLY if it meets all four conditions together: 200 sq ft or less, 30 inches or less above grade at any point within 36 inches of its edge, unattached to the dwelling, and not serving a required exit door.
- The City publishes free project-specific guides (Guide for Adding a Garage, Guide to Building a Pole Barn, Guide to Adding a Patio Cover, Guide for Building an Uncovered Deck) available on the Permits page.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cut Bank building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cut Bank
Deck / Accessory Structure Permit (Garage, Pole Barn, Patio Cover) in other cities
Compare deck / accessory structure permit (garage, pole barn, patio cover) fees across Montana →
Look up this fee in a different city →
Now live
Build your Cut Bank project checklist
Describe your project once and get every permit, document, and fee it triggers in Cut Bank — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →