Deck / Accessory Structure Permit — Lewistown, Montana · Requirements sheet
Verified 2026-07-03 · Source: https://www.cityoflewistown.com/services/building-department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Deck / Accessory Structure Permit in Lewistown, Montana
Decks, sheds, and other detached accessory structures (garages, barns, playhouses, greenhouses) within Lewistown city limits fall under the City's standard Building Permit process for additions/structural work, subject to the City's setback requirements for accessory structures.
Verified 2026-07-03 · Source
When you need this permit
- Detached tool/storage sheds, playhouses, greenhouses, and other accessory buildings must be set back 3 feet from a side property line, 3 feet from a rear property line without street/alley frontage, 0 feet from an alley property line, and 10 feet from a side street property line
- Site plan showing dimensions from property lines to the proposed structure, consistent with the Residential Building Permit Application Procedure requirements for additions
- Decks and accessory structures involving new structural framing follow the same plan submittal requirements as additions (floor plan, foundation/framing plan, cross sections)
- Private Property Accessory Building electrical work (garage, barn, etc.) requires a separate STATE-issued electrical permit — see electrical-permit-state
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
See the full Lewistown inspection guide — scheduling & re-inspection fees →
Tips
- Accessory structure setbacks (3 ft side, 3 ft rear without alley/street frontage, 0 ft from an alley, 10 ft from a side street) apply regardless of whether the structure requires a full building permit — confirm applicability with the Building Department for small sheds.
- If the accessory structure will be wired for electricity, a separate STATE-issued (not city) electrical permit is required from the Montana DLI Building Codes Bureau — Lewistown is Building-certified only.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewistown building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lewistown's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Lewistown yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Lewistown lands. Privacy.
Other permits in Lewistown
Deck / Accessory Structure Permit in other cities
Compare deck / accessory structure permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Lewistown project checklist
Describe your project once and get every permit, document, and fee it triggers in Lewistown — in one checklist. Free, for any city and any number of projects.
Get started →