Skip to main content
PermitBase

Commercial Building Permit (New Structures, Additions, Structural Modifications) in Lewistown, Montana

Required for new commercial construction, additions, and structural modifications within Lewistown city limits. Reviewed against the City's 2021 IBC/IEBC/IECC adoption and the 2012 IFC (as amended by ARM 23.12.601), plus City Ordinances #1749 and #1750, via a combined internal/external multi-department review.

Verified 2026-07-03 · Source

When you need this permit

  • Plans must be stamped by a Montana-licensed Architect or Engineer
  • The Prime or General Contractor must be a Registered Contractor licensed with the State of Montana and hold a current City Business License Contractor
  • Three paper copies (Architectural D: 24" x 36") and one electronic copy of the final plan set required
  • If located within a FEMA-designated floodplain, a floodplain permit is required with documentation of approval
  • Plans must include: job name/legal address/legal description, site plan with setbacks, foundation/roof/floor framing plan, floor plan, cross sections, exterior elevations, mechanical/plumbing/electrical where applicable, engineer-stamped fire protection plans with calculations and cut sheets, code-compliance details, finish schedule, interior/exterior finishes, utility connection details, storm-water drainage/retention ponds if required, curb & gutter/sidewalk plan, parking plan, and signage plan (separate sign permit required)
  • Application undergoes internal review by Building, Planning/Zoning, Public Works, 911 Coordinator, and Fire Department; may also be sent for external review at the building official's discretion, with additional plan-review costs added to the permit fee
  • Tenant improvements, change of use, or change of occupancy are reviewed on a case-by-case basis

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial building permit feeNo published fee schedule exists for Lewistown commercial building permits. The Commercial Building Permit Checklist (Rev. 9/1/2022) states that 'additional costs incurred for plan review will be added to the building permit fee' but lists no base fee table. Checked the Building Department page, Forms & Applications, and Plans & Documents pages — none publish a commercial fee schedule. Left null rather than estimated; contact the Building Department at (406) 535-1776 for a current quote.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Structures, Additions, Structural Modifications) permit actually take in Lewistown?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Lewistown inspection guide — scheduling & re-inspection fees →

    Tips

    • Commercial applicants must hold a current City Business License in addition to Montana contractor registration — confirm both before submitting. Contractor
    • External plan review (at the building official's discretion) adds cost to the base building permit fee — budget contingency for larger or more complex commercial projects.
    • The 2012 IFC (not 2021) as amended by ARM 23.12.601 governs fire code compliance per the City's own commercial checklist — a different edition than the 2021 IBC/IECC/IEBC cited elsewhere in the same document.

    Frequently asked questions

    Lewistown requires a commercial building permit (new structures, additions, structural modifications) for: Plans must be stamped by a Montana-licensed Architect or Engineer; The Prime or General Contractor must be a Registered Contractor licensed with the State of Montana and hold a current City Business License; Three paper copies (Architectural D: 24" x 36") and one electronic copy of the final plan set required; If located within a FEMA-designated floodplain, a floodplain permit is required with documentation of approval; Plans must include: job name/legal address/legal description, site plan with setbacks, foundation/roof/floor framing plan, floor plan, cross sections, exterior elevations, mechanical/plumbing/electrical where applicable, engineer-stamped fire protection plans with calculations and cut sheets, code-compliance details, finish schedule, interior/exterior finishes, utility connection details, storm-water drainage/retention ponds if required, curb & gutter/sidewalk plan, parking plan, and signage plan (separate sign permit required); Application undergoes internal review by Building, Planning/Zoning, Public Works, 911 Coordinator, and Fire Department; may also be sent for external review at the building official's discretion, with additional plan-review costs added to the permit fee; Tenant improvements, change of use, or change of occupancy are reviewed on a case-by-case basis. If your project isn't listed, confirm with City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 535-1776 before starting work.

    Lewistown does not publish a plan-review timeline for this permit. Contact City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 535-1776 for current turnaround.

    You'll need: Commercial Building Permit Checklist; Stamped Plans (3 paper + 1 electronic copy). Depending on your project, Lewistown may also ask for: Floodplain Permit Documentation. See the required-documents checklist on this page for details on each.

    Apply through City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 305 W Watson St, Lewistown, MT 59457 (Building Department office also cited at 308 4th Avenue South, Lewistown, MT). Phone: (406) 535-1776, email: building@ci.lewistown.mt.us. Office hours: Not published on the City's Building Department page as of this review. Building Inspector: Joe Ward, (406) 535-1776, building@ci.lewistown.mt.us; general Building Department line/fax (406) 535-1760 / (406) 535-3323 per city directory listings.. Official information: https://www.cityoflewistown.com/services/building-department.

    Lewistown, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified Local Government Program roster (bsd.dli.mt.gov/building-codes-permits).; Lewistown is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Holy Phelps, (406) 535-1776. Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster, updated 04/22/2026, https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf — verified directly against the PDF (row: 'Lewistown | B | Holy Phelps | 535-1776 | City Limits').; Per the City of Lewistown's own Public Notice 'Adoption of Building Codes' (Lewistown Public Works Administrative Order, dated August 12, 2022, issued pursuant to Lewistown Ordinance Section 4-4-1 adopted by the City Commission May 6, 2002, signed by Public Works Director Tim Majerus), the following codes are adopted and effective within the City of Lewistown as of September 1, 2022: International Building Code 2021 Edition (as amended by ARM 24.301.131), International Residential Code 2021 Edition (as amended by ARM 24.301.154), International Energy Conservation Code 2021 Edition (as amended by ARM 24.301.161), and International Existing Building Code 2021 Edition (as amended by ARM 24.301.171). Source: City of Lewistown, images/pdf/2021-Code-adoption.pdf; The City's Commercial Building Permit Checklist (Revised 9/1/2022) additionally references the International Fire Code, 2012 Edition, as amended by ARM 23.12.601, and the City of Lewistown's Ordinance #1749 and #1750 as part of the adopted codes and ordinances applicants must show compliance with. Source: City of Lewistown, images/pdf/Commercial-Permit-Checklist-10.2022.pdf; The City's Residential Building Permit Application Procedure (Admin approved 1/30/2015) states plans must comply with the '2012 International Residential Code (IRC), 2012 International Energy Conservation Code as amended by ARM 24.301.161' — this is a stale reference predating the City's own September 2022 code-adoption notice; the governing current codes are the 2021 editions per the City's 2022 Public Works Administrative Order above. Source: City of Lewistown, images/pdf/Respremit012015.pdf (dated 2015, superseded in substance by the 2022 adoption notice but still the only published residential application-procedure document found); Per the Montana DLI Building Codes Bureau's Current Codes reference (statewide effective date June 11, 2022): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility — consistent with the codes the City of Lewistown's own 2022 adoption notice cites for its Building-certified scope.. Local amendments apply — see the Lewistown overview page for the full list.

    The 2021 International Building Code (as amended by ARM 24.301.131), 2021 International Existing Building Code (ARM 24.301.171), 2021 International Energy Conservation Code (ARM 24.301.161), the 2012 International Fire Code (ARM 23.12.601), and City of Lewistown Ordinances #1749 and #1750. Source: City of Lewistown Commercial Building Permit Checklist, Rev. 9/1/2022.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewistown building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    This one’s complicated · Get an expediter

    Tell us about your project and we’ll connect you with a permit expediter who works in Lewistown.

    PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.