Skip to main content
PermitBase

Demolition Permit in Lewistown, Montana

Demolition of structures within Lewistown city limits falls under the City's Building Department review process. No standalone demolition-specific bond, checklist, or fee schedule (comparable to Billings' $10,000 demolition bond) was found published by the City as of this review.

Verified 2026-07-03 · Source

When you need this permit

  • Contact the Building Department at (406) 535-1776 or building@ci.lewistown.mt.us prior to demolition to confirm current permit requirements, since no dedicated demolition checklist or ordinance excerpt is published on the City's site
  • As with other building-related work, applications are understood to route through the City's standard multi-department internal review (Building, Planning/Zoning, Public Works, 911 Coordinator, Fire) based on the process described for residential and commercial permits generally

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition permit feeNo published fee schedule or bond requirement was found for demolition permits in Lewistown. Checked the City's Building Department page, Forms & Applications page, and Plans & Documents page — none list a dedicated demolition permit fee, bond amount, or checklist (unlike Billings, which publishes a $10,000 demolition bond requirement and dedicated checklist). This is reported as a genuine small-city publication gap, not an inferred or invented figure. Contact the Building Department at (406) 535-1776 for current requirements.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Lewistown?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Lewistown inspection guide — scheduling & re-inspection fees →

    Tips

    • Unlike Billings (which publishes a dedicated Demolition Permit Requirements/Checklist and requires a $10,000 site bond per lot), Lewistown does not appear to publish an equivalent standalone demolition procedure online — confirm bonding, utility disconnection, and site restoration requirements directly with the Building Department, (406) 535-1776, before beginning demolition work.
    • Contact the Montana Department of Environmental Quality regarding asbestos/NESHAP requirements before any demolition, consistent with statewide practice in other Montana cities.

    Frequently asked questions

    The City's Building Department (406-535-1776) should be contacted directly, as no dedicated demolition permit checklist, fee schedule, or bond requirement is published on the City's website as of this review.

    Lewistown does not publish a plan-review timeline for this permit. Contact City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 535-1776 for current turnaround.

    You'll need: Demolition Permit Application. See the required-documents checklist on this page for details on each.

    Apply through City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 305 W Watson St, Lewistown, MT 59457 (Building Department office also cited at 308 4th Avenue South, Lewistown, MT). Phone: (406) 535-1776, email: building@ci.lewistown.mt.us. Office hours: Not published on the City's Building Department page as of this review. Building Inspector: Joe Ward, (406) 535-1776, building@ci.lewistown.mt.us; general Building Department line/fax (406) 535-1760 / (406) 535-3323 per city directory listings.. Official information: https://www.cityoflewistown.com/services/building-department.

    Lewistown, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified Local Government Program roster (bsd.dli.mt.gov/building-codes-permits).; Lewistown is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Holy Phelps, (406) 535-1776. Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster, updated 04/22/2026, https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf — verified directly against the PDF (row: 'Lewistown | B | Holy Phelps | 535-1776 | City Limits').; Per the City of Lewistown's own Public Notice 'Adoption of Building Codes' (Lewistown Public Works Administrative Order, dated August 12, 2022, issued pursuant to Lewistown Ordinance Section 4-4-1 adopted by the City Commission May 6, 2002, signed by Public Works Director Tim Majerus), the following codes are adopted and effective within the City of Lewistown as of September 1, 2022: International Building Code 2021 Edition (as amended by ARM 24.301.131), International Residential Code 2021 Edition (as amended by ARM 24.301.154), International Energy Conservation Code 2021 Edition (as amended by ARM 24.301.161), and International Existing Building Code 2021 Edition (as amended by ARM 24.301.171). Source: City of Lewistown, images/pdf/2021-Code-adoption.pdf; The City's Commercial Building Permit Checklist (Revised 9/1/2022) additionally references the International Fire Code, 2012 Edition, as amended by ARM 23.12.601, and the City of Lewistown's Ordinance #1749 and #1750 as part of the adopted codes and ordinances applicants must show compliance with. Source: City of Lewistown, images/pdf/Commercial-Permit-Checklist-10.2022.pdf; The City's Residential Building Permit Application Procedure (Admin approved 1/30/2015) states plans must comply with the '2012 International Residential Code (IRC), 2012 International Energy Conservation Code as amended by ARM 24.301.161' — this is a stale reference predating the City's own September 2022 code-adoption notice; the governing current codes are the 2021 editions per the City's 2022 Public Works Administrative Order above. Source: City of Lewistown, images/pdf/Respremit012015.pdf (dated 2015, superseded in substance by the 2022 adoption notice but still the only published residential application-procedure document found); Per the Montana DLI Building Codes Bureau's Current Codes reference (statewide effective date June 11, 2022): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility — consistent with the codes the City of Lewistown's own 2022 adoption notice cites for its Building-certified scope.. Local amendments apply — see the Lewistown overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lewistown building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.