Skip to main content
PermitBase

EV Charger / Electric Vehicle Charging Station Permit in Lewistown, Montana

Montana has no dedicated EV-charger permit type or fee line, and Lewistown is DLI-certified for Building only (not Electrical), so installing a Level 2 (240V) home EV charger or EVSE within Lewistown city limits requires a State of Montana Electrical Permit issued directly by the DLI Building Codes Bureau (Helena) -- not the City of Lewistown -- billed under the same general residential wiring/circuit line items used for any new dedicated circuit or service upgrade. A separate City of Lewistown Building Permit is only needed if the installation also involves new structural work (e.g., a new carport or accessory structure).

Verified 2026-07-20 · Source

When you need this permit

  • Electrical work must be performed and the permit pulled by a Montana-licensed electrical contractor (LCO/UCO), per the Application for Residential Contractor Electrical Permit (Rev 6/24)
  • If the EV charger is added as a new dedicated circuit to an existing panel with no service/panel change, this is billed under the form's 'Single Family Interior/Exterior Wire or Rewire' section, line H ('1 additional circuit or piece of equipment') or line G ('2-3 additional circuits or pieces of equipment') depending on scope
  • If the installation requires a panel upgrade or new/upsized electrical service to support the charger's amperage draw, it is billed instead under the amperage-based 'Single Family Dwelling or Cabin' service tiers (A-D)
  • The state application form has no Alternative-Energy-style checkbox or dedicated question set for EV chargers (unlike its Solar/Wind/Hydro section) -- EVSE is treated as ordinary residential branch-circuit wiring
  • A City of Lewistown Building Permit is required in addition only if the EVSE is mounted on, or paired with, new structural construction (e.g., a new carport or accessory structure); not required for a simple wall/pedestal-mounted charger on an existing structure

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

1 additional circuit or piece of equipment (e.g., a single EV charger circuit added to an existing panel)Montana Building Codes Bureau, Application for Residential Contractor Electrical Permit (Rev 6/24), line H -- no distinct 'EV charger'/'EVSE' line item exists on the state form; this is the general additional-circuit line an electrical contractor would use for a single new EV charger circuit, confirmed directly against the current fee schedule PDF
$45
2-3 additional circuits or pieces of equipment (e.g., EV charger plus other new circuits in the same job)Application for Residential Contractor Electrical Permit (Rev 6/24), line G
$70
Single Family Dwelling or Cabin -- up to 200-amp service (if the EV charger install requires a new/upgraded service)Application for Residential Contractor Electrical Permit (Rev 6/24), line A -- applies if a panel/service upgrade is needed to support charger load rather than a simple additional circuit
$200
Request Inspection, per hourApplication for Residential Contractor Electrical Permit (Rev 6/24)
$60 (plus $30 per additional 30 minutes or fraction thereof, plus travel time)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Lewistown?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Performed by the Montana Building Codes Bureau's regional electrical inspector; new circuit, breaker sizing, and disconnect (if required by the charger manufacturer) verified before energizing

See the full Lewistown inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated 'EV charger' or 'EVSE' checkbox anywhere on Montana's state electrical permit form -- unlike solar, which gets its own Alternative Energy Source question set, an EV charger circuit is simply billed as ordinary new/additional wiring.
  • Whether your job falls under the flat additional-circuit fee ($45-$70) or the amperage-based service tiers depends on whether your existing panel has enough spare capacity -- ask your electrical contractor to specify this on the application.
  • Because Lewistown is not electrically-certified, do not attempt to pull this permit from the City -- it must go to the State DLI Building Codes Bureau in Helena, the same office that handles Lewistown's other electrical work.
  • No separate City of Lewistown permit is needed for a straightforward wall-mounted or pedestal EV charger with no new structure; only pull a City Building Permit as well if you're also constructing a new carport or similar structure to house it.

Frequently asked questions

Lewistown requires an ev charger / electric vehicle charging station permit for: Electrical work must be performed and the permit pulled by a Montana-licensed electrical contractor (LCO/UCO), per the Application for Residential Contractor Electrical Permit (Rev 6/24); If the EV charger is added as a new dedicated circuit to an existing panel with no service/panel change, this is billed under the form's 'Single Family Interior/Exterior Wire or Rewire' section, line H ('1 additional circuit or piece of equipment') or line G ('2-3 additional circuits or pieces of equipment') depending on scope; If the installation requires a panel upgrade or new/upsized electrical service to support the charger's amperage draw, it is billed instead under the amperage-based 'Single Family Dwelling or Cabin' service tiers (A-D); The state application form has no Alternative-Energy-style checkbox or dedicated question set for EV chargers (unlike its Solar/Wind/Hydro section) -- EVSE is treated as ordinary residential branch-circuit wiring; A City of Lewistown Building Permit is required in addition only if the EVSE is mounted on, or paired with, new structural construction (e.g., a new carport or accessory structure); not required for a simple wall/pedestal-mounted charger on an existing structure. If your project isn't listed, confirm with City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 535-1776 before starting work.

If added as a single new circuit to an existing panel, $45 under line H ('1 additional circuit or piece of equipment') of the state's Application for Residential Contractor Electrical Permit (Rev 6/24). If a service/panel upgrade is also needed, the amperage-based service fee tiers ($200-$800) apply instead.

Lewistown does not publish a plan-review timeline for this permit. Contact City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 535-1776 for current turnaround.

You'll need: Application for Residential (or Commercial) Contractor Electrical Permit. See the required-documents checklist on this page for details on each.

Lewistown requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: State Electrical Inspection. Schedule each through City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. ((406) 535-1776).

Apply through City of Lewistown Building Department — Building Inspector Joe Ward; city-certified for Building (B) permits only. Electrical, Plumbing, and Mechanical permits within Lewistown city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 305 W Watson St, Lewistown, MT 59457 (Building Department office also cited at 308 4th Avenue South, Lewistown, MT). Phone: (406) 535-1776, email: building@ci.lewistown.mt.us. Office hours: Not published on the City's Building Department page as of this review. Building Inspector: Joe Ward, (406) 535-1776, building@ci.lewistown.mt.us; general Building Department line/fax (406) 535-1760 / (406) 535-3323 per city directory listings.. Official information: https://www.cityoflewistown.com/services/building-department.

Lewistown, Montana has adopted: Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified Local Government Program roster (bsd.dli.mt.gov/building-codes-permits).; Lewistown is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Holy Phelps, (406) 535-1776. Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster, updated 04/22/2026, https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf — verified directly against the PDF (row: 'Lewistown | B | Holy Phelps | 535-1776 | City Limits').; Per the City of Lewistown's own Public Notice 'Adoption of Building Codes' (Lewistown Public Works Administrative Order, dated August 12, 2022, issued pursuant to Lewistown Ordinance Section 4-4-1 adopted by the City Commission May 6, 2002, signed by Public Works Director Tim Majerus), the following codes are adopted and effective within the City of Lewistown as of September 1, 2022: International Building Code 2021 Edition (as amended by ARM 24.301.131), International Residential Code 2021 Edition (as amended by ARM 24.301.154), International Energy Conservation Code 2021 Edition (as amended by ARM 24.301.161), and International Existing Building Code 2021 Edition (as amended by ARM 24.301.171). Source: City of Lewistown, images/pdf/2021-Code-adoption.pdf; The City's Commercial Building Permit Checklist (Revised 9/1/2022) additionally references the International Fire Code, 2012 Edition, as amended by ARM 23.12.601, and the City of Lewistown's Ordinance #1749 and #1750 as part of the adopted codes and ordinances applicants must show compliance with. Source: City of Lewistown, images/pdf/Commercial-Permit-Checklist-10.2022.pdf; The City's Residential Building Permit Application Procedure (Admin approved 1/30/2015) states plans must comply with the '2012 International Residential Code (IRC), 2012 International Energy Conservation Code as amended by ARM 24.301.161' — this is a stale reference predating the City's own September 2022 code-adoption notice; the governing current codes are the 2021 editions per the City's 2022 Public Works Administrative Order above. Source: City of Lewistown, images/pdf/Respremit012015.pdf (dated 2015, superseded in substance by the 2022 adoption notice but still the only published residential application-procedure document found); Per the Montana DLI Building Codes Bureau's Current Codes reference (statewide effective date June 11, 2022): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility — consistent with the codes the City of Lewistown's own 2022 adoption notice cites for its Building-certified scope.. Local amendments apply — see the Lewistown overview page for the full list.

No. Neither the State of Montana DLI Building Codes Bureau nor the City of Lewistown has a dedicated EV-charger or EVSE permit type or fee line. A home Level 2 charger is permitted as ordinary residential electrical wiring under the State's standard Residential Electrical Permit (Lewistown is not electrically-certified, so this is state-issued, not city-issued).