Commercial Building Permit (New Construction, Additions, Alterations, Change of Occupancy) in Anaconda-Deer Lodge, Montana
Required for new commercial buildings, additions, alterations, repairs, reroofs, and changes of occupancy in Anaconda-Deer Lodge. Anaconda-Deer Lodge County's certified local Building program covers residential only, per the Montana Building Codes Bureau's Certified City, County and Town Programs list ('Deer Lodge County — B (residential only) — Greg Bahr — 563-4010 — County'); that Bureau's own list states that all other building work — which, for a residential-only certified county, means commercial work — is under the jurisdiction of the State Building Codes Bureau. This is the same building official (Greg Bahr) and phone exchange (563-xxxx, Anaconda) already confirmed for the local residential permit on the ADLC Building Inspector page, distinguishing this jurisdiction from the similarly-named City of Deer Lodge in Powell County, a separate town whose own certified-program row is listed as 'PENDING' at a distinct 846-2238 number. Because the county is not certified for commercial building, the Montana Department of Labor & Industry Building Codes Bureau in Helena issues, reviews, and inspects the commercial building permit directly — the ADLC Planning Department does not perform this plan review or issue this permit, though its own Building Permit Application form directs commercial applicants back to the Planning Department, and the county continues to apply its separate zoning and business-license requirements to the same project.
Verified 2026-08-26 · Source
When you need this permit
- A state Building Permit is required before construction, addition, alteration, repair, reroof, moving a building, or change of occupancy for any commercial building in Anaconda-Deer Lodge, because the county's certified local Building program (residential only) does not extend to commercial work
- Building permits must be issued before plumbing, mechanical, or electrical permits can be issued for the same project, and before any work authorized under those permits can start
- Submit construction plans and a Building Permit/Plan Review Application to the Montana Building Codes Bureau for review and approval — electronically at ebiz.mt.gov, by upload/email to buildingcodes@mt.gov, or by mail
- Plans and specifications must be drawn to scale and show compliance with the International Building Code, including a site plan, dimensioned floor plans, a typical wall/floor/roof section, and required accessibility routes
- Roof truss designs, and footing/foundation designs that do not comply with the code (such as slab-on-grade in some conditions), require the seal and certification of a licensed Montana design professional
- Energy code compliance must be demonstrated, for example via the ComCheck tool
- Do not send fees with the initial submittal unless a project number has already been assigned; the Bureau calculates and bills the permit and plan review fees after intake
- Separate plumbing, electrical, and mechanical permits are the applicant's responsibility to obtain from the same Bureau
- The project remains subject to other applicable local requirements, including Anaconda-Deer Lodge County zoning ordinances and the county's business-license requirement for contractors — confirm applicability directly with the ADLC Planning Department, since its own local Building Permit Application form directs commercial applicants there for guidance even though the county does not issue the commercial building-code permit itself
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Administrative Rules of Montana 24.301.138, Table 109.2 (Building Permit Fees), as adopted by the Montana Building Codes Bureau — the Bureau's own state fee schedule for state-administered building… Show full citationHide
Administrative Rules of Montana 24.301.138, Table 109.2 (Building Permit Fees), as adopted by the Montana Building Codes Bureau — the Bureau's own state fee schedule for state-administered building permits, distinct from the ADLC Planning Department's local residential fee table documented under the Residential Building Permit entry above. Text confirmed via Cornell Law School's Legal Information Institute's regulation mirror, https://www.law.cornell.edu/regulations/montana/Mont-Admin-r-24.301.138Review timeline
Inspection process
See the full Anaconda-Deer Lodge inspection guide — scheduling & re-inspection fees →
Tips
- This is a State of Montana permit, not a county one — the ADLC Planning Department and Building Inspector Greg Bahr administer only the county's certified residential Building program, per the state's Certified City, County and Town Programs list. A commercial project's Building Permit is filed with the Montana Building Codes Bureau in Helena, the same Bureau that already handles all electrical, plumbing, and mechanical permitting in this jurisdiction.
- Do not confuse Anaconda-Deer Lodge County with the City of Deer Lodge — a separate town in Powell County that appears on the same state certified-program list under its own row.
- Building, plumbing, mechanical, and electrical permits for the same commercial project are separate applications to the same Bureau; the building permit must be issued first.
- The Bureau's fee schedule (ARM 24.301.138) also lists flat fees for wind farm turbine foundations ($200 for the first turbine, $100 for each additional turbine) and solar fields ($100 per megawatt) — these apply only if the commercial project includes that scope.
- ADLC's own local Building Permit Application states that its printed fee table is residential only and directs commercial applicants to contact the Planning Department directly — in practice this appears to route to zoning, business-license, and other county requirements rather than to a county-issued commercial building-code permit, since the county's own state certification does not cover commercial building work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Anaconda-Deer Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Anaconda-Deer Lodge.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Anaconda-Deer Lodge
Commercial Building Permit (New Construction, Additions, Alterations, Change of Occupancy) in other cities
Look up this fee in a different city →