Change of Use / Occupancy Permit in Anaconda-Deer Lodge, Montana
Anaconda-Deer Lodge does not issue a standalone, free-standing 'Certificate of Occupancy' document. Occupancy/change-of-use compliance instead runs through two tracks depending on whether construction is involved. LOCAL TRACK (no construction — a new or changed business occupying an existing space as-is): the ADLC Business License Application (Rev. December 19th, 2025) functions as the county's de facto change-of-occupancy compliance check — no business may operate without a business license in hand, and the license itself requires sign-off from the Tri-County Sanitarian's Office, the ADLC Building Inspector (Greg Bahr), and the ADLC Code Enforcement Officer (Vern Tuss), each confirming compliance, plus review by the ADLC Planning Director and Chief Executive Officer. STATE TRACK (construction-related change of use — the occupancy classification of a building is actually changing, e.g., a warehouse converting to retail): the Montana Building Codes Bureau's statewide 'Application for Building Permit' (BCP-1, Rev. 11/25) includes an explicit 'Change of Use' checkbox under 'Type of Work,' confirmed by direct inspection of the live form. This state track applies in Anaconda-Deer Lodge because the county's local Building certification covers RESIDENTIAL construction only — commercial change-of-use construction is not locally certified and falls to the state Bureau, the same pattern used for electrical, plumbing, and mechanical work there.
Verified 2026-07-22 · Source
When you need this permit
- Any change of business, occupant, or use at a location in Anaconda-Deer Lodge requires a Business License Application (ADLC Planning Department, Rev. December 19th, 2025) — applications may have up to a two-week waiting period
- All required inspections must be conducted and each inspector (Building Inspector, Code Enforcement Officer, Tri-County Sanitarian as applicable) must deem the business/occupancy in compliance with all applicable codes before the license issues
- No business shall operate prior to having the business license in hand; if the space is not ready for inspection at submittal, the applicant must contact the county when ready
- If the change of use involves construction work that changes the building's occupancy classification (not simply a new tenant/business using an existing space as-is), an Application for Building Permit (BCP-1, Rev. 11/25) must separately be submitted to the Montana Building Codes Bureau with 'Change of Use' checked under Type of Work, because ADLC's local Building certification is residential-only
- Construction-related change-of-use plans must conform to the International Building Code and be submitted electronically to the Bureau per its Plan Submittal Requirements
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Inspector Compliance Check
ADLC Building Inspector (Greg Bahr) confirms compliance as part of the Business License sign-off; required before a license (and therefore occupancy) is granted
- 2
Code Enforcement / Sanitarian Compliance Check
ADLC Code Enforcement Officer (Vern Tuss) and, where applicable (food service, septic, water), the Tri-County Sanitarian's Office sign off on compliance as part of the same Business License Application
See the full Anaconda-Deer Lodge inspection guide — scheduling & re-inspection fees →
Tips
- Anaconda-Deer Lodge does not issue a standalone Certificate of Occupancy — occupancy/change-of-use compliance is folded into the Business License process itself, which requires sign-off from the Building Inspector, Code Enforcement Officer, and Sanitarian before the license (and thus the ability to operate) is granted.
- If your change of use is just a new business moving into existing, unmodified space, you likely only need the local Business License track — budget up to two weeks.
- If your change of use involves construction that reclassifies the building's occupancy (e.g., warehouse to assembly, office to restaurant), you likely also need the separate STATE Change-of-Use Building Permit from the Montana Building Codes Bureau, since ADLC's local Building certification is residential-only — budget an additional 2-3 weeks for that track and confirm applicability with the Bureau, (406) 841-2056, and the ADLC Building Inspector, (406) 563-4011.
- No business may legally operate before the business license is physically in hand, regardless of whether inspections have been scheduled.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Anaconda-Deer Lodge building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Anaconda-Deer Lodge
Change of Use / Occupancy Permit in other cities
Compare change of use / occupancy permit fees across Montana →
Look up this fee in a different city →
Now live
Build your Anaconda-Deer Lodge project checklist
Describe your project once and get every permit, document, and fee it triggers in Anaconda-Deer Lodge — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →