Commercial Building Permit (New Construction, Additions, Alterations) in Choteau, Montana

Required for new commercial construction, additions, and alterations within Choteau city limits. Issued by the City of Choteau under its DLI-certified local Building (B) program using the same combined Zoning/Building Permit Application form as residential work, with a distinct 'Plan Review (Commercial Only)' fee line built into the same office-use fee block. Because Choteau's DLI certification covers Building only, electrical, plumbing, and mechanical work on a commercial project is permitted directly by the Montana DLI Building Codes Bureau rather than the City, and fire sprinkler/alarm systems are reviewed by the Montana State Fire Marshal's Office rather than as part of this permit.

Verified 2026-08-26 · Source

When you need this permit

  • Combined Zoning/Building Permit Application must be completed, with the Building Permit Application number field used, Type of Work indicated (New/Addition/Alteration/Repair), a full description of work attached, and project valuation (prior value and completed value) provided
  • The application's 'For Office Use' fee block includes a 'Plan Review (Commercial Only)' line, in addition to the Zoning, Building, Board of Appeals, and Public Works lines applied to every permit type on this form -- confirmed by direct visual review of the packet's page 2
  • A signed Zoning/Building Permit Acknowledgement Form must be submitted, acknowledging the City does not oversee contractors, does not review floodplain/property-line/accessibility compliance, and that the applicant is solely responsible for code compliance
  • A Plot Plan must be submitted for new buildings, drawn to a 5-foot grid (1 inch = 20 feet), showing building/site/setback dimensions, easements, drainage or finish contours, first floor elevation, street elevation, sewer service elevation, water/sewer/gas/electrical service line locations, and survey pin locations, with north indicated
  • If the property is in Flood Zone 'A', additional applications are required per the City's 2024 Floodplain Regulations
  • Applicant must call Building Inspector Kyle Harlan at (406) 788-3398 prior to construction and during the project so required inspections can be scheduled
  • Electrical work requires a separate Application for Commercial Electrical Permit filed directly with the Montana DLI Building Codes Bureau, since Choteau holds no DLI Electrical certification; this is a different state application and fee schedule from the Residential Electrical Permit documented elsewhere in this jurisdiction's file
  • Plumbing and mechanical work also require separate permits filed directly with the Montana DLI Building Codes Bureau, using the same statewide fee schedules already documented for residential plumbing and mechanical work in this jurisdiction's file -- the DLI does not publish a separate commercial-specific plumbing or mechanical application; a Montana-licensed Master Plumber is required on all public/commercial buildings per the DLI's own plumbing-permits page
  • Fire sprinkler and alarm system work is reviewed by the Montana State Fire Marshal's Office rather than the City, because Choteau does not appear on the SFMO's Fire Inspection Certified Jurisdiction roster

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Zoning, Building, Board of Appeals, and Public Works fees
Not published as a fixed table by the City of Choteau. Show full citationNot published as a fixed table by the City of Choteau. Confirmed by rendering and visually reading the City's Zoning/Building Permit Application form (choteaumt.org/s/Choteau-Zoning-and-Building-Permit-packet.pdf, page 2, 'For Office Use' block) on 2026-08-26: the Zoning, Building, Board of Appeals, and Public Works lines each carry a blank dollar-amount field, filled in by city staff after review. Applicants must contact the City Office at (406) 466-2510 for a current quote.
Not published — contact the department
Plan Review (Commercial Only)
Confirmed by the same visual read of the City's Zoning/Building Permit Application form (page 2, 'For Office Use' block) on 2026-08-26: a distinct 'Plan Review (Commercial Only)' line appears below… Show full citationConfirmed by the same visual read of the City's Zoning/Building Permit Application form (page 2, 'For Office Use' block) on 2026-08-26: a distinct 'Plan Review (Commercial Only)' line appears below Zoning/Building/Board of Appeals/Public Works, with its own blank dollar-amount field -- this is the fee line that applies specifically to commercial-scope work on the same combined form. No fixed amount or percentage is printed on the form itself.
Not published — contact the department
Commercial Electrical Permit -- project cost $0 to $1,000Montana Building Codes Bureau, Application for Commercial Electrical Permit (Rev. 11/25), Commercial Fee Schedule -- issued directly by the Montana DLI Building Codes Bureau, not the City of Choteau, because the City's certification covers Building only, not Electrical.
$45.00 for the first $500, plus 6% of the balance of the project cost
Commercial Electrical Permit -- project cost $1,001 to $10,000Application for Commercial Electrical Permit (Rev. 11/25), Commercial Fee Schedule
$75.00 for the first $1,000, plus 2% of the balance of the project cost
Commercial Electrical Permit -- project cost $10,001 to $50,000Application for Commercial Electrical Permit (Rev. 11/25), Commercial Fee Schedule
$255.00 for the first $10,000, plus 0.5% of the balance of the project cost
Commercial Electrical Permit -- project cost $50,001 or moreApplication for Commercial Electrical Permit (Rev. 11/25), Commercial Fee Schedule
$455.00 for the first $50,000, plus 0.3% of the balance of the project cost
Commercial Plumbing Permit -- each new water heater (or replacement)
Montana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule -- the same schedule already documented for residential plumbing work in this jurisdiction's file; Show full citationMontana Building Codes Bureau, Application for Plumbing Permit (BCP-1) statewide Fee Schedule -- the same schedule already documented for residential plumbing work in this jurisdiction's file; the DLI publishes no separate commercial-specific plumbing application, though its plumbing-permits page states a Montana-licensed Master Plumber is required on all public/commercial buildings.
$25
Commercial Mechanical Permit -- project value $0 to $10,000
Montana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule -- the same schedule already documented for residential mechanical work in this jurisdiction's file; Show full citationMontana Building Codes Bureau, Application for Mechanical Permit (BCP-1) statewide Fee Schedule -- the same schedule already documented for residential mechanical work in this jurisdiction's file; checked the DLI's mechanical-permits page directly on 2026-08-26 and no separate commercial-specific mechanical application or fee tier is published.
$48 for the first $1,000, plus $14 for each additional $1,000 or fraction thereof

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction, Additions, Alterations) permit actually take in Choteau?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Choteau has no dedicated commercial building permit application -- commercial and residential projects use the identical Zoning/Building Permit Application, distinguished only by the 'Plan Review (Commercial Only)' fee line and the project description/valuation entered on the form.
    • Electrical work on a Choteau commercial project is billed on a different Montana DLI fee schedule than residential electrical work: the Commercial Electrical Permit's Commercial Fee Schedule is percentage-of-project-cost based (e.g. $45 for the first $500 plus 6% of the balance, up to $1,000), while the Residential Electrical Permit uses flat service-tier fees.
    • Plumbing and mechanical trade permits on a commercial project use the same statewide DLI fee schedules as residential work -- there is no separate commercial plumbing or mechanical application -- but Montana requires a licensed Master Plumber on all public/commercial buildings.
    • Fire sprinkler and alarm system plans for a commercial building in Choteau are not reviewed as part of this permit -- that work is reviewed by the Montana State Fire Marshal's Office, since Choteau does not appear on the SFMO's Fire Inspection Certified Jurisdiction roster; contact Deputy State Fire Marshal Doug Ulsh at (406) 431-3172.
    • No fee schedule or review timeline is published online for the City's own Building/Zoning/Plan Review fees; call the City Office at (406) 466-2510 for a current quote.

    Frequently asked questions

    Choteau requires a commercial building permit (new construction, additions, alterations) for: Combined Zoning/Building Permit Application must be completed, with the Building Permit Application number field used, Type of Work indicated (New/Addition/Alteration/Repair), a full description of work attached, and project valuation (prior value and completed value) provided; The application's 'For Office Use' fee block includes a 'Plan Review (Commercial Only)' line, in addition to the Zoning, Building, Board of Appeals, and Public Works lines applied to every permit type on this form -- confirmed by direct visual review of the packet's page 2; A signed Zoning/Building Permit Acknowledgement Form must be submitted, acknowledging the City does not oversee contractors, does not review floodplain/property-line/accessibility compliance, and that the applicant is solely responsible for code compliance; A Plot Plan must be submitted for new buildings, drawn to a 5-foot grid (1 inch = 20 feet), showing building/site/setback dimensions, easements, drainage or finish contours, first floor elevation, street elevation, sewer service elevation, water/sewer/gas/electrical service line locations, and survey pin locations, with north indicated; If the property is in Flood Zone 'A', additional applications are required per the City's 2024 Floodplain Regulations; Applicant must call Building Inspector Kyle Harlan at (406) 788-3398 prior to construction and during the project so required inspections can be scheduled; Electrical work requires a separate Application for Commercial Electrical Permit filed directly with the Montana DLI Building Codes Bureau, since Choteau holds no DLI Electrical certification; this is a different state application and fee schedule from the Residential Electrical Permit documented elsewhere in this jurisdiction's file; Plumbing and mechanical work also require separate permits filed directly with the Montana DLI Building Codes Bureau, using the same statewide fee schedules already documented for residential plumbing and mechanical work in this jurisdiction's file -- the DLI does not publish a separate commercial-specific plumbing or mechanical application; a Montana-licensed Master Plumber is required on all public/commercial buildings per the DLI's own plumbing-permits page; Fire sprinkler and alarm system work is reviewed by the Montana State Fire Marshal's Office rather than the City, because Choteau does not appear on the SFMO's Fire Inspection Certified Jurisdiction roster. If your project isn't listed, confirm with City of Choteau — Building Official Kyle Harlan (contracted); city-certified for Building (B) permits only. Zoning permits are administered directly by the City Office; Electrical, Plumbing, and Mechanical permits within Choteau city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 466-2510 before starting work.

    Choteau does not publish a plan-review timeline for this permit. Contact City of Choteau — Building Official Kyle Harlan (contracted); city-certified for Building (B) permits only. Zoning permits are administered directly by the City Office; Electrical, Plumbing, and Mechanical permits within Choteau city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at (406) 466-2510 for current turnaround.

    You'll need: Zoning/Building Permit Application; Zoning/Building Permit Acknowledgement Form; Plot Plan. See the required-documents checklist on this page for details on each.

    Apply through City of Choteau — Building Official Kyle Harlan (contracted); city-certified for Building (B) permits only. Zoning permits are administered directly by the City Office; Electrical, Plumbing, and Mechanical permits within Choteau city limits are issued directly by the Montana Department of Labor & Industry Building Codes Bureau, not the City. at 38 First Avenue N.W., PO Box 619, Choteau, MT 59422-0619. Phone: (406) 466-2510. Office hours: City Office: Mon-Fri 8:00 AM - 5:00 PM. Building Inspector Kyle Harlan (contracted, also serves Toole County and Pondera County as certified building official) should be called directly at (406) 788-3398 prior to construction and during the project to schedule required inspections, per the City's Zoning/Building Permit Acknowledgement Form.. Official information: https://www.choteaumt.org/services.

    Montana's statewide 2021 International Building Code, effective June 11, 2022 under Administrative Rules of Montana Title 24, Chapter 301, applies to certified and state-enforced jurisdictions alike. The City's own permit packet names the code families it enforces (International Building Code, Energy Conservation Code, International Mechanical Code, International Fuel Gas Piping Code, ICC A117.1 Accessibility Standards, Uniform Plumbing Code, National Electrical Code) without naming the edition or a municipal code section, consistent with the City having adopted the State Building Code as its own by ordinance effective May 17, 2012.

    No. Commercial projects use the same combined Zoning/Building Permit Application as residential projects, with the addition of a 'Plan Review (Commercial Only)' fee line on the form's office-use fee block. Source: City of Choteau Zoning/Building Permit Packet.

    The Montana DLI Building Codes Bureau, not the City, because Choteau's certification covers Building only. Electrical work uses a distinct Commercial Electrical Permit application with a percentage-of-cost fee schedule; plumbing and mechanical work use the same statewide fee schedules that apply to residential work in Choteau.

    No. Fire protection systems are reviewed by the Montana State Fire Marshal's Office, not the City, because Choteau does not appear on the SFMO's Fire Inspection Certified Jurisdiction roster. Contact Deputy State Fire Marshal Doug Ulsh at (406) 431-3172.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-26.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Choteau building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    This one’s complicated · Get an expediter

    Tell us about your project and we’ll connect you with a permit expediter who works in Choteau.

    PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.