Choteau building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Choteau, Montana.

Last verified 2026-07-03 · Source · Embed this page’s badge · Version history

Building department

Address
38 First Avenue N.W., PO Box 619, Choteau, MT 59422-0619
Phone
(406) 466-2510
Email
Office hours
City Office: Mon-Fri 8:00 AM - 5:00 PM. Building Inspector Kyle Harlan (contracted, also serves Toole County and Pondera County as certified building official) should be called directly at (406) 788-3398 prior to construction and during the project to schedule required inspections, per the City's Zoning/Building Permit Acknowledgement Form.

Codes adopted

Montana adopts a single statewide building code by rule and, by default, enforces it directly — local governments only gain enforcement authority once the state certifies them. Under the Montana Building Codes Act (Mont. Code Ann. Title 50, Chapter 60), the Department of Labor & Industry's Building Codes Bureau adopts one state building code applicable everywhere (§ 50-60-203, codified further at Administrative Rules of Montana Title 24, Chapter 301) — currently the 2021 editions of the IBC, IRC, IMC, IFGC, IECC, IEBC, ISPSC, and UPC, with the 2020 NEC for electrical (effective statewide since 6/11/2022 per the Bureau's own Current Codes page). A city, county, or town may adopt and enforce its own building-code program under § 50-60-301, but its adopted code "may include only codes adopted by the Building Codes Bureau" — a local edition can never diverge from or be less stringent than the state's. Critically, under § 50-60-302, a local government cannot enforce ANY building code — even one it has formally adopted — until the Bureau certifies its program (requiring an approved code, a published fee schedule, an enforcement plan, and properly licensed or nationally certified inspectors); certification is granted per TRADE, not as one blanket designation. The Bureau's own "Certified City, County and Town Programs" list uses the key B=Building, P=Plumbing, E=Electrical, M=Mechanical, SP=Pool, W=Wildland-Urban-Interface — a jurisdiction can be certified for Building only while Electrical/Plumbing/Mechanical remain directly state-enforced within the same city limits (e.g., Havre, Anaconda-Deer Lodge), or certified across all trades (e.g., Billings, Missoula, Great Falls, Bozeman, Helena, Kalispell). Non-certified jurisdictions — most of Montana's unincorporated county land, since very few counties appear on the certified list — fall under direct enforcement by the state Building Codes Bureau (§ 50-60-304). Montana also exempts private homes and buildings of four or fewer dwelling units not serving transient guests from the state building-permit requirement entirely, though electrical, plumbing, and mechanical permits remain separately required regardless. Always confirm with the specific jurisdiction which trades it is certified for versus which remain directly state-enforced.

  • Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Building Codes Bureau, amended by the Administrative Rules of Montana (ARM) Title 24, Chapter 301. Cities, counties, and towns may become 'certified' to locally administer permitting and inspection for all or part of the code; non-certified trades in a partially-certified jurisdiction fall under direct state administration by the DLI Building Codes Bureau. Source: Montana DLI Building Codes Bureau, Certified City, County and Town Programs list (bsd.dli.mt.gov/building-codes-permits).
  • Choteau is a Montana DLI-certified jurisdiction for Building (B) ONLY within city limits; certified building official on file with DLI: Kyle Harlan, (406) 466-2510 (city office) / (406) 788-3398 (direct, per City's own permit packet). Source: Montana DLI Building Codes Bureau, 'Montana Certified Local Government Program' roster, updated 04/22/2026, https://bsd.dli.mt.gov/_docs/building-codes-permits/certified-city.pdf
  • Per Choteau Acantha reporting (April 2012 City Council coverage), the City of Choteau adopted the State Building Code as its own by ordinance (effective May 17, 2012) and contracted with Kyle Harlan of Cascade, MT as the city's certified building code inspector, so that building permit fees collected stay with the city rather than the state, and so contractors have a local point of contact. Source: choteauacantha.com, 'City adopts revised zoning codes'
  • The City of Choteau's own Zoning/Building Permit Acknowledgement Form lists the codes applicable to construction in the city as: the International Building Code, Energy Conservation Code (IECC), International Mechanical Code (IMC), International Fuel Gas Piping Code (IFGC), ICC A117.1 Accessibility Standards, the Uniform Plumbing Code (UPC), the National Electrical Code (NEC), the City of Choteau Zoning Code, and other Choteau Municipal Codes. Source: City of Choteau, Choteau-Zoning-and-Building-Permit-packet.pdf (choteaumt.org/s/Choteau-Zoning-and-Building-Permit-packet.pdf)
  • Per the Montana DLI Building Codes Bureau's Current Codes page (statewide effective date June 11, 2022, applicable to all certified and state-enforced jurisdictions alike): 2021 IBC, 2021 IRC, 2021 IEBC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 ISPSC, 2021 UPC, 2020 NEC, 2017 ICC A117.1 Accessibility. Choteau's own permit packet references these same code families (IBC, IECC, IMC, IFGC, ICC A117.1, UPC, NEC) without naming a locally-amended edition, consistent with a small B-only-certified jurisdiction enforcing the state-adopted editions rather than authoring independent code text. Source: bsd.dli.mt.gov/building-codes-permits/current-codes

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
2units

2 buildings · $938,000 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Montana building activity

Tips & gotchas

  • Choteau is a Montana DLI-certified jurisdiction for BUILDING (B) permits ONLY — verified directly against the DLI Building Codes Bureau's own 'Montana Certified Local Government Program' roster PDF (updated 04/22/2026): 'Choteau | B | Kyle Harlan | 466-2510 | City Limits'. Electrical, Plumbing, and Mechanical permits anywhere within Choteau city limits are issued DIRECTLY by the Montana DLI Building Codes Bureau in Helena, not the City — mail to PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov.
  • The City of Choteau adopted the State Building Code as its own by ordinance effective May 17, 2012, and contracted with Kyle Harlan of Cascade, MT as its certified building inspector — a deliberate local decision so that building-permit fees stay with the city instead of the state, and so contractors have a local point of contact. Kyle Harlan also serves as the certified building official for Toole County and Pondera County per the same DLI roster, i.e. he is a shared regional inspector, not Choteau-exclusive.
  • Unincorporated Teton County (outside Choteau city limits) does not appear on the DLI's certified local government roster at all — every permit type there (Building, Electrical, Plumbing, Mechanical) is issued directly by the state Building Codes Bureau.
  • Choteau uses ONE combined Zoning/Building Permit Application form (not separate applications for zoning vs. building) — plus a separate Plot Plan form for new construction and a signed Zoning/Building Permit Acknowledgement Form. All three are bundled in the City's single downloadable PDF packet.
  • No fixed, published fee schedule was found for Choteau's Building or Zoning permits — unlike Billings and Havre, which publish standalone valuation-based Fee Schedule PDFs, Choteau's application form has blank 'For Office Use' fee lines (Zoning / Building / Board of Appeals / Public Works / Plan Review-commercial-only) filled in by city staff after review. This is reported as an honest publication gap after directly reviewing the City's own permit packet — not an inferred or invented number. Applicants must call the City Office, (406) 466-2510, for a current quote.
  • reviewTimelineDays is null/unverified for every Choteau-issued (Building) permit type: no city-published turnaround time exists on the City's website, permit packet, Services page, or Documents/Reports page. The state DLI Building Codes Bureau's own FAQ describes 'a few hours to several weeks' for STATE-ISSUED permits, but that figure governs jurisdictions where the state issues Building permits directly — it is NOT the applicable governing figure for Choteau, which is independently Building-certified and processes review through its own contracted inspector on a different (informal, phone-coordinated) track. Chase trail: (1) City of Choteau Services page — no timeline stated; (2) City of Choteau Documents/Reports page and permit packet PDF — no timeline stated; (3) Choteau Acantha local news archive — no timeline stated; (4) DLI Building Codes Bureau FAQ — timeline applies only to state-administered permits, not Choteau's own certified program, so borrowing it would misattribute a different administrative process. Per the zero-tolerance policy, this is left null with reviewTimelineVerified:false rather than estimated or borrowed from a non-governing source.
  • For Electrical, Plumbing, and Mechanical work (all state-issued in Choteau since only Building is city-certified), the applicable fee tables are identical to those used in other Montana B-only jurisdictions such as Havre — sourced directly from the Montana Building Codes Bureau's own statewide application PDFs.
  • If the property is in Flood Zone 'A', the City's own application form flags that additional applications are required per the City of Choteau Floodplain Regulations (adopted 2024).

Related guides

Comparable nearby cities

Conrad
11 shared permit types~27 mi away
Compare fees →
Glasgow
9 shared permit typesBoth on the Montana has a mandatory statewide building code administered by the Montana Department of Labor & Industry (DLI) Buil...