Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) — Conrad, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://bsd.dli.mt.gov/building-codes-permits/permit-applications/electrical-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) in Conrad, Montana
Installing an EV charger/EVSE in Conrad is electrical work, and because Conrad is DLI-certified for Building only (no Electrical certification), it requires a permit issued directly by the Montana DLI Building Codes Bureau in Helena via the same Application for Residential Electrical Permit (or Commercial Electrical Permit) used for any other electrical work — not a separate, EV-specific permit. No dedicated EV charger/EVSE line item was found on the state's Residential Electrical Permit fee schedule (directly text-extracted from the Bureau's own fillable PDF form); a charger installation is billed under the form's general 'additional circuit or piece of equipment' or 'change of service' line items depending on scope.
Verified 2026-07-20 · Source
When you need this permit
- Application must be signed and dated by the licensed electrical contractor's person in charge, or filed as a homeowner permit for owner-performed work
- Payment must be submitted with the application; incomplete applications are returned unprocessed
- Property address, GEOCODE/parcel/lot/block, owner information, and power company must be provided
- Apply in accordance with Title 50, Chapter 60, Section 604, MCA and ARM 24.301.431
- No EV-charger-specific line item exists on the state's Residential Electrical Permit form (Rev. 12/22); a Level 1/Level 2 charger installed as a single new circuit/outlet is most consistent with the form's 'Single Family Interior/Exterior Wire or Rewire' category (items E-H, scaled by number of circuits and whether a panel/service change is involved)
- The City of Conrad's own Building Permit Application form states under NOTICE that separate permits are required for electrical work, confirming EV charger circuits are not handled by the City
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (if new circuit run before concealment)
Conduit/wiring for the new charger circuit before covering
- 2
Final
Charger installed, circuit verified, system energized
See the full Conrad inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated 'EV charger permit' in Conrad or on the Montana Building Codes Bureau's statewide fee schedule -- a home charger is billed under the same general residential electrical fee items used for any new circuit or piece of equipment ($45 for one additional circuit, per item H of the state's own form).
- Electrical permits for any Conrad address (including EV chargers) are issued by the STATE Building Codes Bureau in Helena, not the city, mirroring this file's electrical-permit-state entry -- mail applications and payment to PO Box 200517, Helena, MT 59620-0517, or apply online at ebiz.mt.gov.
- If the charger installation requires a panel upgrade or full service change, budget for the higher $200 (4+ circuits & change of service) fee tier instead of the $45 single-circuit rate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Conrad building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Conrad
Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) in other cities
Look up this fee in a different city →