Solar PV / Alternative Energy Permit (State-Issued) in Conrad, Montana
Required for installation of grid-tied residential or commercial rooftop/ground-mounted solar photovoltaic systems in Conrad. Because Conrad is DLI-certified for Building only (no Electrical certification), the electrical/interconnection portion of any solar PV installation is issued directly by the Montana DLI Building Codes Bureau in Helena as an Application for Alternative Energy Permit — the same statewide form used for solar, wind, and hydro systems — not by the City of Conrad. Roof-mounted racking/structural attachment (residential or commercial) may separately require the City of Conrad's own Building Permit, since Conrad holds full Building certification for both project types.
Verified 2026-07-20 · Source
When you need this permit
- Complete the state's Application for Alternative Energy Permit (BCP-1 series, Rev. 11/25): identify the alternative energy type as Solar and the system type (PV String System, Generator, or Micro Inverter/AC Module System)
- If the system will produce 90 or more volts, the electrical work must be performed by a Montana-licensed electrical contractor unless the homeowner is doing the work on their own private house
- If the project involves a grid-tied alternative energy generator (virtually all net-metered residential/commercial solar), a licensed electrical contractor must obtain an ADDITIONAL permit for the final utility interconnection — stated directly on the state application form
- Mail the completed application and fee to Department of Labor & Industry, Building Codes Bureau, PO Box 200517, Helena, MT 59620-0517, or apply online at https://aca-prod.accela.com/bcb/
- Because Conrad holds full DLI Building certification, a separate City of Conrad Building Permit application is likely required for the roof-mount racking/structural attachment portion of the installation — confirm with the City of Conrad building department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Electrical)
Conduit runs, wire sizing, disconnect placement before covering/energizing; must be requested with 48 hours' notice
- 2
Final Interconnection
Per the state application form, a licensed electrical contractor must obtain and complete an additional permit/inspection for the final grid-tied utility connection before Permission to Operate
See the full Conrad inspection guide — scheduling & re-inspection fees →
Tips
- Solar PV in Conrad is NOT processed by the City for the electrical portion — because Conrad holds no DLI Electrical certification, the interconnection permit is issued directly by the Montana DLI Building Codes Bureau in Helena using the Application for Alternative Energy Permit, the same statewide form used for solar, wind, and hydro systems.
- A grid-tied system (virtually all residential net-metered solar) requires a licensed electrical contractor to obtain a SEPARATE additional permit for the final utility connection, per the state form's own certification language.
- The residential flat fee of $45 applies under the 'Residential Change of Service' line item on the same Alternative Energy Permit form; commercial projects are billed on the same tiered valuation schedule as standard commercial electrical work.
- Because Conrad holds full local Building certification, the structural/racking attachment likely needs a City of Conrad Building Permit in addition to the state electrical permit — confirm before starting work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Conrad building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Conrad
Solar PV / Alternative Energy Permit (State-Issued) in other cities
Compare solar pv / alternative energy permit (state-issued) fees across Montana →
Look up this fee in a different city →
Now live
Build your Conrad project checklist
Describe your project once and get every permit, document, and fee it triggers in Conrad — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →