How to schedule
Inspections are requested through the building department below.
- Address
- 595 Silver Lace Blvd, Fernley, NV 89408
- Phone
- (775) 784-9900
- Office hours
- Monday-Friday 8:00 a.m.-5:00 p.m.; permit submittal counter closes at 4:00 p.m. daily; closed all observed holidays. Inspection requests must be received by phone (775-784-9829/775-784-9900) by 4:00 p.m. the business day before the requested inspection date.
- Website
- Official site
Published scheduling rules
- Inspections must be requested by phone by 4:00 p.m. the business day before the desired inspection date. (Residential Building Permit (New Construction / Single- and Two-Family Dwellings))
- Inspections must be requested by phone by 4:00 p.m. the business day before the desired inspection date; the City does not offer same-day inspection requests. (General)
Inspection sequence
Applies to: Residential Building Permit (New Construction / Single- and Two-Family Dwellings)
- 1
Foundation
Footing, stem wall, and under-slab inspection required prior to placing concrete
- 2
Underfloor
Required prior to installing plywood subfloor
- 3
Utilities (Trench)
All trenches behind electrical and gas meters; testing of new lines
- 4
Roof-Framing
Required prior to covering the roof
- 5
Shear Nailing
Wall sheathing nailing including required structural hold-downs
- 6
Stucco/Veneer Lath
Lath inspection prior to applying stucco or veneer finish
- 7
Rough Frame / Electric / Plumbing / HVAC
Combined rough inspection including leak tests; building must be weathered-in (roofing and door/window weather protection complete)
- 8
Insulation
Building insulation, thermal wrap, ductwork leak test, and related energy-code certifications of compliance
- 9
Wallboard / Shower Pan
Wallboard nailing inspection and shower pan inspection
- 10
Final Utilities
Heat and permanent power release inspections
- 11
Final / Certificate of Occupancy
All permitted work complete; Building & Safety Division issues final approval and, if required, a Certificate of Occupancy and utility releases
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed; utility trench inspection and new-line testing
- 3
Final
All fixtures connected, no leaks, final utility release
Applies to: Residential Addition / Remodel / Repair Permit
- 1
Foundation/Footing
Required before concrete pour for any new footings (addition, deck posts requiring a permit, etc.)
- 2
Rough Frame / Electric / Plumbing / HVAC
Structural framing, connections to existing structure, and rough utility inspections combined
- 3
Final
Completed work verified against approved plans; final utility release and Certificate of Occupancy if applicable
Applies to: Sign Building Permit
- 1
Footing
Required before backfill/concrete placement, to verify footing size, location, materials, reinforcing, and embedded anchoring against the approved footing plan
- 2
Electrical Rough-In
For illuminated signs only: disconnect location, circuit sizing, and conduit verified before energizing
- 3
Final
Completed sign verified against approved elevations, height, and location; electrical connections and grounding verified if illuminated
Applies to: Demolition Permit
- 1
Pre-Backfill / Utility Disconnect Verification
Owner, Public Works, NV Energy, and Southwest Gas sign-off confirming water, sewer, gas, and electrical services are disconnected and capped/de-energized before demolition proceeds
- 2
Final
Site restoration verified: lot filled and maintained to existing grade, debris removed, drainage provisions in place
Applies to: Electrical Permit (Tag / Service Change / New Installation)
- 1
Rough-In
Wiring, box placement, and service connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2023 NEC; final utility (permanent power) release
Applies to: EV Charger / Electric Vehicle Charging Station Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement, and any panel/service upgrade verified before energizing
- 2
Final
Charger mounting, electrical connections, and interconnection point verified per adopted NEC
Applies to: Fence and Retaining Wall Permit
- 1
Footing
Required for permitted retaining walls before backfill, to verify footing depth and reinforcement
- 2
Final
Completed fence/wall verified against approved plans
Applies to: Fire Sprinkler & Fire Alarm System Permit (North Lyon County Fire Protection District)
- 1
Underground/Rough-In
Sprinkler underground supply piping and rough fire-alarm wiring inspected/tested per NFPA 13/25 and NFPA 72 before concealment
- 2
Final Acceptance Test
Hydrostatic/flow acceptance test of the sprinkler system (NFPA 13) and functional test of the fire alarm system (NFPA 72); a floor and site plan showing hydrant locations, gas/electrical shutoffs, lock box location, annunciator panel, and FDC/PIV location must be provided to NLCFPD at building final (8.5in x 11in, two copies)
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and mechanical equipment rough-in before walls closed; gas piping tested (manometer test) before concealment
- 2
Final
Equipment operational, clearances and combustion air verified, final utility (heat) release
Applies to: Solar Photovoltaic (PV) / EV Charging Station Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing; roof retrofit verification if applicable
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, electrical connections, inverter, and interconnection point verified per adopted NEC
Final inspection only: Change of Use / Change of Occupancy Permit, Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fernley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Fernley building permits
Get alerts for Fernley
We'll email you when Fernley's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.