Unincorporated Washoe County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Washoe County, Nevada.

Verified 2026-07-20 · Source

How to schedule

Inspections are requested through the building department below.

Address
1001 E. Ninth Street, Building A, Reno, NV 89512
Phone
(775) 328-2020
Office hours
Monday–Friday 8:00 AM – 4:00 PM

Published scheduling rules

  • Inspections can be scheduled via voicemail at (775) 325-8000, email at inspections@washoecounty.gov, or online through your Accela account. (Residential Building Permit (New Construction))
  • Same-day inspection requests (after 3 pm the prior business day) cost $160; expedited plan review costs $100 per hour with a 2-hour minimum. (Fire Sprinkler & Fire Alarm System Permit (TMFPD))
  • All permits are submitted online via the ONe NV permit portal (www.onenv.us) — create an Accela account first; schedule inspections through the same portal. (General)

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Footings and foundation before concrete pour; setback certification required

  2. 2

    Framing

    Structural framing, egress windows, fire separation

  3. 3

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  4. 4

    Final

    All work complete, smoke/CO detectors, address posted

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Framing / Structural

    After framing and before wall cover

  2. 2

    MEP Rough-In

    Mechanical, electrical, plumbing rough-ins before walls closed

  3. 3

    Insulation / Energy

    Energy code compliance before drywall (if applicable)

  4. 4

    Final

    All work complete, fire sprinkler certification, ADA compliance verified, Certificate of Occupancy issued

Applies to: Fire Sprinkler & Fire Alarm System Permit (TMFPD)

  1. 1

    Rough-In / Underground

    Sprinkler underground supply and rough overhead piping, or fire alarm conduit/wiring rough-in, before concealment

  2. 2

    Fire Sprinkler System Test

    Hydrostatic test of sprinkler piping and fire-pump start-up test (if applicable), witnessed by TMFPD

  3. 3

    Fire Alarm System Test

    Final acceptance test of alarm devices, panel programming, and central-station monitoring connection

  4. 4

    Final

    Seismic bracing, standpipe flush/test, and Fire Department Connection (FDC) verified before Certificate of Occupancy

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footings / Foundation

    Before concrete pour — Setback and Elevation Certification Letter and Soils Compaction Certification Letter required

  2. 2

    Framing

    After structural framing, sheathing, and rough-in trades are complete and before insulation or wall cover

  3. 3

    Insulation / Energy

    Insulation installed and energy code compliance items verified before drywall

  4. 4

    Final

    All work complete; Grading and Drainage Certification Letter required; ready for Certificate of Occupancy

Applies to: Swimming Pool / Spa Permit

  1. 1

    Excavation / Pre-Gunite

    Steel reinforcement installed, before gunite/concrete — verify setbacks and dimensions

  2. 2

    Rough Plumbing / Electrical

    Plumbing lines and electrical bonding before backfill and decking

  3. 3

    Barrier / Fencing

    Pool barrier and fence enclosure installed before pool can be filled

  4. 4

    Final

    Equipment operational, safety covers, anti-entrapment drains, electrical bonding/grounding verified

Applies to: Certificate of Occupancy / Change of Use

  1. 1

    Final Building Inspection

    All work required by the building permit is completed (WCC §100.109.3.12)

  2. 2

    Other-Agency Sign-Offs

    Road, Health (well/septic), Community Development (parking/zoning/landscaping), Fire Department, and Nevada State Office inspections as applicable, verified on the permit card in Accela

  3. 3

    Certificate of Occupancy Issuance

    Building Division issues the CO (or TCO, up to 90 days) once all required sign-offs are complete

Applies to: Mechanical / HVAC Permit

  1. 1

    Gas Piping Pressure Test

    Required before concealing gas piping — verify no leaks under test pressure

  2. 2

    Rough-In

    Ductwork and mechanical equipment rough-in before walls closed — verify clearances and support

  3. 3

    Final

    Equipment operational, combustion air verified, venting correct

Applies to: Plumbing Permit

  1. 1

    Underground / Slab Plumbing

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed and before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, no leaks, proper venting verified

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footings (if applicable)

    Before concrete pour for new footings — setback certification may be required

  2. 2

    Framing / Structural

    After framing is complete and before walls are covered — verify structure, connections, and blocking

  3. 3

    Final

    All work complete per approved plans

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final — Structural / Building

    Panel mounting, racking attachment, roof penetration sealing verified

  3. 3

    Final — Electrical

    Electrical connections, inverter installation, and interconnection point verified

Applies to: Block / Screen Wall / Fence Permit

  1. 1

    Footings (if applicable)

    For masonry or block walls — verify footing depth, rebar, and setback before concrete pour

  2. 2

    Final

    Wall or fence complete — verify height, setbacks, and construction per approved plans

Applies to: Electrical Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify conductor sizing, box placement, and service connections

  2. 2

    Final

    All devices installed, panel labeled, GFCI/AFCI protection verified per 2023 NEC

Applies to: EV Charger (EVSE) Permit

  1. 1

    Rough-In

    Conductor sizing, box placement, and circuit routing before cover, where applicable

  2. 2

    Final

    Charger mounting, disconnect, GFCI/breaker sizing, and labeling verified per 2023 NEC

Re-inspection fees

Certificate of Occupancy / Change of UseTemporary Certificate of Occupancy — Special Inspection Permit ('Trip Permit') · Genuine gap, not invented: the Residential Certificate of Occupancy Handout names the 'Trip Permit' requirement but states no fee for it, and no line item titled 'Trip Permit' or 'TCO' appears in Table 2 (Other Inspections and Permit Fees); it may be billed under Table 2's general re-inspection fees ($90.00/hour under Article 109, or $45.00/hour where no fee is otherwise specified, one-hour minimum) but this is not confirmed
Not separately published in the fee tables reviewed

Unincorporated Washoe County building permits

Get alerts for Unincorporated Washoe County

We'll email you when Unincorporated Washoe County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.