Plumbing Permit — Unincorporated Washoe County, Nevada · Requirements sheet
Verified 2026-06-30 · Source: https://www.washoecounty.gov/building/Residential_Projects/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Unincorporated Washoe County, Nevada
Required for plumbing installations, alterations, and repairs in unincorporated Washoe County, including water heater replacements, fixture additions, re-piping, and sewer/water service line work. Governed by the 2024 Uniform Plumbing Code.
Verified 2026-06-30 · Source
When you need this permit
- Repair, replace, relocate, or add to the plumbing system
- Water heater installation or replacement
- New fixtures (toilets, sinks, showers, bathtubs)
- Water or waste re-piping
- Sewer or water service line replacement
- Submit via ONe NV permit portal or EZ Permit — Plumbing for basic work by licensed contractors Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Underground / Slab Plumbing
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed and before walls closed — pressure test required
- 3
Final
All fixtures connected, no leaks, proper venting verified
See the full Unincorporated Washoe County inspection guide — scheduling & re-inspection fees →
Tips
- EZ Permits are available for water heater replacements and other basic plumbing work by licensed contractors. Contractor
- Washoe County uses the 2024 Uniform Plumbing Code (UPC), not the International Plumbing Code — rules on fixture counts and venting differ.
- A water heater permit fee is $45 base + $8 for the water heater unit = $53 minimum for a licensed contractor pull. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washoe County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Washoe County
Plumbing Permit in other cities
Compare plumbing permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Washoe County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washoe County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →