EV Charger (EVSE) Permit in Unincorporated Washoe County, Nevada
Required for installation of electric vehicle charging equipment (EVSE) in unincorporated Washoe County. There is no separate EV-charger permit type or fee line — EVSE installation is explicitly listed as covered work under the standard Electrical Permit (Washoe County Code Chapter 100, Appendix A, Table 8) and is billed using the same unit-fee schedule as other fixed appliances/power apparatus.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for EV charger (EVSE) installation per Washoe County Code Chapter 100
- Work must comply with the 2023 National Electrical Code as locally adopted
- Submit using the standard Residential Building Permit Application (2023) or the EZ Permit — Electrical form for basic like-for-like circuit additions by licensed contractors Contractor
- Nevada state law (NRS 624) requires a licensed electrical contractor unless the owner is performing the work on their own single-family residence
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Conductor sizing, box placement, and circuit routing before cover, where applicable
- 2
Final
Charger mounting, disconnect, GFCI/breaker sizing, and labeling verified per 2023 NEC
See the full Unincorporated Washoe County inspection guide — scheduling & re-inspection fees →
Tips
- There is no distinct 'EV charger permit' — apply for a standard Electrical Permit; a basic EV charger circuit installed by a licensed contractor may qualify for the faster EZ Permit — Electrical pathway. Contractor
- Fee is driven by the unit-fee schedule (Table 8): most Level 2 residential chargers are billed as a single fixed appliance/outlet ($3 unit fee) plus the $45 base issuance fee, not by installation valuation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washoe County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Washoe County
EV Charger (EVSE) Permit in other cities
Compare ev charger (evse) permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Washoe County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washoe County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →