EV Charger / Electric Vehicle Charging Station Permit — Fallon, Nevada · Requirements sheet
Reviewed 2026-07-20 · Source: https://library.municode.com/nv/fallon/codes/code_of_ordinances?nodeId=TIT17BUCO_CH17.04COCO
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Fallon, Nevada
The City of Fallon has no dedicated EV charger permit, application, or fee schedule. Installation of an electric vehicle charging station (Level 1/2 EVSE) is electrical work and falls under the City's standard Electrical Permit process (2023 NEC as adopted by Ordinance No. 788), using the Permit Application's 'Minor Electrical & Plumbing' section (new electric circuit) or, for a panel/service upgrade, the amperage-change field — the same mechanism documented in the electrical-permit entry. No EV-specific line item was found in the Municode-hosted ordinance text or on the City website. Re-chased exhaustively 2026-07-20: directly downloaded and text-extracted the City's Building Permit Application PDF (no fee table present, only a 'Minor Electrical & Plumbing' checkbox section), and re-checked the Business Licenses & Building Permits page and a fresh web search for any City of Fallon fee-schedule resolution PDF -- none found. This confirms the same gap independently, not merely an unrechased carryover.
Reviewed 2026-07-20 · Source
When you need this permit
- A construction permit from the city engineer is required for the electrical work associated with an EV charger installation (City Code § 17.08.010)
- Governed by the 2023 NEC (including Article 625, Electric Vehicle Power Transfer System) as adopted by City of Fallon Ordinance No. 788 (City Code § 17.04.020(J))
- Use the Permit Application's 'Minor Electrical & Plumbing' section — check 'new electric circuits' for a dedicated EVSE circuit, or specify the new amperage if a service/panel upgrade is required to support the charger
- Construction must be performed by a contractor licensed in the State of Nevada, except for qualifying Home Owner/Builders Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Inspections
The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate rough-in/final electrical inspection scheduling directly with the Building Department at (775) 423-5107
See the full Fallon inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate 'EV charger permit' in Fallon — apply for a standard Electrical Permit and select 'new electric circuits' (or the applicable amperage change) on the Minor Electrical & Plumbing section of the Permit Application.
- The City's adopted 2023 NEC includes Article 625 (Electric Vehicle Power Transfer System), which governs EVSE installation requirements even though no City-specific EV fee or checklist has been published.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fallon
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Fallon project checklist
Describe your project once and get every permit, document, and fee it triggers in Fallon — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →