Re-Roofing / Siding Permit — Fallon, Nevada · Requirements sheet
Verified 2026-07-23 · Source: https://www.fallonnevada.gov/wp-content/uploads/2019/09/BuildingPermit_12.20.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Re-Roofing / Siding Permit in Fallon, Nevada
Required for re-roofing and siding work within Fallon city limits, governed by the 2024 IRC/IBC roofing provisions as adopted by the City of Fallon, with local snow-load amendments via the 2024 Northern Nevada Amendments.
Verified 2026-07-23 · Source
When you need this permit
- A construction permit from the city engineer is required for re-roofing/siding, falling under the general construction-permit requirement of City Code § 17.08.010
- Governed by the 2024 IRC/IBC roofing chapters as adopted by City of Fallon Ordinance No. 788, together with the 2024 Northern Nevada Amendments' ground-snow-load table (IBC Table 1608.2.1, amended to read 'City of Fallon and Lyon County')
- The Permit Application form's 'Re-Roof & Siding' section requires specifying tear-off vs. recover (maximum 2 layers), composition shingle year rating, stucco, or siding
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Inspections
The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate roofing inspection scheduling directly with the Building Department at (775) 423-5107
See the full Fallon inspection guide — scheduling & re-inspection fees →
Tips
- The permit application distinguishes tear-off from recover (maximum 2 layers permitted) — check with the Building Department if your existing roof already has 2 layers.
- Fallon's adopted snow-load table (2024 Northern Nevada Amendments, IBC Table 1608.2.1) specifically lists 'City of Fallon and Lyon County' — confirm the current ground snow load value with the Building Department for structural roofing work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fallon
Re-Roofing / Siding Permit in other cities
Compare re-roofing / siding permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Fallon project checklist
Describe your project once and get every permit, document, and fee it triggers in Fallon — in one checklist. Free, for any city and any number of projects.
Get started →