The City of Fallon has no dedicated sign ordinance, sign-permit application, or sign fee schedule. Title 21 Zoning (Chapters 21.04 through 21.80, reviewed in full) contains only a definition of 'sign' (§ 21.08.270) and no standalone sign-standards chapter (area/height/setback table) or sign-permit-application section. Signs requiring construction, structural support, or electrical connection are instead permitted under the City's general construction-permit requirement (City Code § 17.08.010) and reviewed against the 2024 International Building Code Appendix H (Signs), which the City of Fallon adopted alongside the base 2024 IBC (City Code § 17.04.020(A): 'IBC... with Appendices C, E, H, and I'). Illuminated signs are additionally subject to the 2023 NEC as adopted (City Code § 17.04.020(J)).

Reviewed 2026-07-22 · Source

When you need this permit

  • A construction permit from the city engineer is required for 'the erection of a building... and other work covered in the codes adopted' (City Code § 17.08.010); sign installation involving structural support or electrical connection falls within this general trigger
  • Structural design and installation of outdoor signs must comply with 2024 IBC Appendix H (Signs), adopted by the City of Fallon together with the base 2024 IBC (City Code § 17.04.020(A), Ordinance No. 788, adopted December 2, 2025)
  • Electrically illuminated signs must additionally comply with the 2023 National Electrical Code as adopted by City Code § 17.04.020(J) — apply for the standard Electrical Permit for the illumination circuit (see the Electrical Permit entry)
  • City of Fallon Zoning Code § 21.08.270 defines 'sign' as 'any advertising method by which a person, profession, business, commodity or fact is made known as relating to the property upon which such advertisement is located,' but Title 21 (Chapters 21.04-21.80) contains no dedicated sign-standards chapter, sign area/height/setback table, or sign-permit-application section — confirmed by reviewing the full Title 21 chapter table of contents
  • No City of Fallon sign-specific permit application, checklist, or fee schedule was found published online, distinct from the standard Building Permit Application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building/Electrical Permit Fee (sign)City of Fallon Code of Ordinances § 17.08.080; confirm current amount with the Building Department at (775) 423-5107
Not published — set by City Council resolution; no dedicated sign fee table found on the City website or in the Municode-hosted ordinance text

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Fallon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Department Inspections

    The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate sign/electrical inspection scheduling directly with the Building Department at (775) 423-5107

See the full Fallon inspection guide — scheduling & re-inspection fees →

Tips

  • Fallon has no dedicated sign ordinance or sign permit — apply through the standard Building Permit process (and the Electrical Permit as well, if the sign is illuminated).
  • The 2024 IBC Appendix H (Signs) governs outdoor sign construction and safety in Fallon because the City adopted it alongside the base 2024 IBC — review its structural and location provisions before designing a sign.
  • Because no zoning sign-standards chapter was found (no area, height, or setback table for signs in Title 21), confirm directly with the Building Department whether a specific sign location or size raises any zoning concern beyond the building permit.

Frequently asked questions

Fallon requires a sign permit for: A construction permit from the city engineer is required for 'the erection of a building... and other work covered in the codes adopted' (City Code § 17.08.010); sign installation involving structural support or electrical connection falls within this general trigger; Structural design and installation of outdoor signs must comply with 2024 IBC Appendix H (Signs), adopted by the City of Fallon together with the base 2024 IBC (City Code § 17.04.020(A), Ordinance No. 788, adopted December 2, 2025); Electrically illuminated signs must additionally comply with the 2023 National Electrical Code as adopted by City Code § 17.04.020(J) — apply for the standard Electrical Permit for the illumination circuit (see the Electrical Permit entry); City of Fallon Zoning Code § 21.08.270 defines 'sign' as 'any advertising method by which a person, profession, business, commodity or fact is made known as relating to the property upon which such advertisement is located,' but Title 21 (Chapters 21.04-21.80) contains no dedicated sign-standards chapter, sign area/height/setback table, or sign-permit-application section — confirmed by reviewing the full Title 21 chapter table of contents; No City of Fallon sign-specific permit application, checklist, or fee schedule was found published online, distinct from the standard Building Permit Application. If your project isn't listed, confirm with City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 before starting work.

In Fallon, the published Building/Electrical Permit Fee (sign) is: Not published — set by City Council resolution; no dedicated sign fee table found on the City website or in the Municode-hosted ordinance text. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Fallon does not publish a plan-review timeline for this permit. Contact City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 for current turnaround.

You'll need: City of Fallon Building Department Permit Application. Depending on your project, Fallon may also ask for: Electrical Permit Application (if illuminated). See the required-documents checklist on this page for details on each.

Fallon requires 1 inspection(s) for a sign permit, in order: Building Department Inspections. Schedule each through City of Fallon Building Department (Engineering and Public Works) ((775) 423-9862 / (775) 423-5107).

Apply through City of Fallon Building Department (Engineering and Public Works) at 55 West Williams Avenue, Fallon, Nevada 89406. Phone: (775) 423-9862 / (775) 423-5107, email: buildingpermits@fallonnevada.gov. Office hours: City Building Department, 55 W. Williams Avenue, Fallon, NV 89406 (fax (775) 423-8874). The Building Department is organizationally part of the City's Engineering and Public Works Department, which is responsible for 'Airport Oversight, Building Inspections, Building Permit Issuance.' Applications may be submitted in person, or (for roofing/siding-type minor work per the permit form) scanned and emailed to the office; the City Engineer reviews and issues construction permits per City Code Chapter 17.08.. Official information: https://www.fallonnevada.gov/business/business-licenses-building-permits/.

Fallon, Nevada has adopted: The City of Fallon self-administers its own building permitting program within city limits — it is NOT routed to Churchill County. The City Building Department (55 W. Williams Avenue) issues permits and performs inspections directly; Churchill County's separate Building Department (270 S. Maine Street, Suite A, Fallon, NV) has its own, distinct jurisdiction limited to unincorporated Churchill County. Source: City of Fallon Code of Ordinances Chapter 17.04 and 17.08 (city engineer/building department issues permits); City of Fallon Departments page (Engineering and Public Works: 'Airport Oversight, Building Inspections, Building Permit Issuance'); Churchill County Building Department page (separate department/address for unincorporated county).; Nevada has no single mandatory statewide building code edition for all jurisdictions (unlike Montana) — Nevada is a home-rule state for building codes, with the principal statewide requirement being an energy-code floor under NRS 701.220 (local governments must adopt a code at least as stringent as the most recent published IECC edition, currently the 2024 IECC per the Nevada Governor's Office of Energy). Each city/county separately adopts its own building code editions and amendments. City of Fallon's actual adopted editions are documented below from its own Code of Ordinances — not assumed from any statewide default.; 2024 International Building Code (IBC), with Appendices C, E, H, and I, adopted by the City of Fallon with local additions/deletions (Section 113 deleted; Section 312.1 amended; Section 1612.3 amended to insert 'Churchill County and Incorporated Areas' and 'April 5, 2021' effective flood-hazard date). Source: City of Fallon Code of Ordinances § 17.04.020(A); 2024 International Residential Code (IRC), with Appendices AB, BF, CA, CB, CD, and CE, adopted by the City of Fallon (Section R112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(B); 2024 International Existing Building Code (IEBC), with Appendices A and B, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(C); 2024 International Fuel Gas Code (IFGC), with Appendices A, B, and C, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(D); 2024 International Mechanical Code (IMC), adopted by the City of Fallon (Sections 112 and 113 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(E); 2024 International Swimming Pool and Spa Code (ISPSC), adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(F); 2024 Uniform Plumbing Code (UPC), with Appendices A, B, and D, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table B) — Nevada jurisdictions may adopt either the UPC or the IPC; Fallon adopted the UPC. Source: City of Fallon Code of Ordinances § 17.04.020(G); 2024 Uniform Mechanical Code (UMC), with Appendices A, B, and C, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table C) — adopted alongside (in addition to) the IMC. Source: City of Fallon Code of Ordinances § 17.04.020(H); 2024 International Energy Conservation Code (IECC), adopted by the City of Fallon (Section 109 deleted) — satisfies the NRS 701.220 statewide energy-code floor. Source: City of Fallon Code of Ordinances § 17.04.020(I); NRS 701.220; 2023 National Electrical Code (NEC), adopted by the City of Fallon. Source: City of Fallon Code of Ordinances § 17.04.020(J); 2024 Northern Nevada Amendments (NNA), published by the Northern Nevada Chapter of the International Code Council on February 20, 2025, adopted by the City of Fallon, amending IBC Table 1608.2.1 (ground snow load table) to replace 'Lyon County' with 'City of Fallon and Lyon County.' Source: City of Fallon Code of Ordinances § 17.04.020(K); All codes adopted 'by reference,' together with the noted supplements, amendments, and additions/deletions, per Ordinance No. 747 (adopted March 4, 2014) as most recently amended by Ordinance No. 788 (adopted December 2, 2025). 'Jurisdiction' and similar terms in the adopted codes mean the City of Fallon. Source: City of Fallon Code of Ordinances §§ 17.04.010, 17.04.020, 17.04.030. Local amendments apply — see the Fallon overview page for the full list.

No dedicated sign-standards chapter or sign-permit application was found in the City of Fallon Code of Ordinances after reviewing all of Title 21 (Zoning), Chapters 21.04 through 21.80 — Title 21 contains only a definition of 'sign' at § 21.08.270. Sign construction is instead reviewed under the City's general construction-permit requirement (City Code § 17.08.010) against the 2024 IBC Appendix H (Signs), which Fallon adopted alongside its base 2024 IBC.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.