Required for demolition of any building or structure within Fallon city limits. There is no separate 'Demolition' chapter in the City of Fallon Code of Ordinances distinct from the general construction-permit requirement; demolition is permitted work under City Code § 17.08.010 and the demolition provisions of the adopted 2024 IBC (Chapter 33, Site Work, Demolition and Construction). Chapter 17.28 (Moving Buildings) is a separate, distinct permit for relocating a structure rather than demolishing one.

Verified 2026-07-23 · Source

When you need this permit

  • It is unlawful to construct, or commence construction — a term expressly including 'erection of a building... and other work covered in the codes adopted' — without a permit from the city engineer; demolition of a structure is treated as construction-related work requiring a permit under this same section (City Code § 17.08.010)
  • Application made on Building Department forms with a detailed statement of the work (City Code § 17.08.020)
  • Demolition work must comply with the safeguards during construction/demolition provisions of the adopted 2024 IBC
  • Moving a building (as distinct from demolishing it) instead requires the separate process in Chapter 17.28: application to the city clerk, inspection and report by the building inspector, and a City Council public hearing with notice mailed to owners within 300 feet before an order approving or rejecting the move is entered (City Code §§ 17.28.030-17.28.060) — confirm with the Building Department which pathway (demolition vs. moving permit) applies to a given project

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Demolition Permit FeeCity of Fallon Code of Ordinances § 17.08.080; confirm current amount with the Building Department at (775) 423-5107
Not published — set by City Council resolution; no dedicated demolition fee table found on the City website or in the Municode-hosted ordinance text

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Fallon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Department Inspections

    The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate final-site inspection scheduling directly with the Building Department at (775) 423-5107

See the full Fallon inspection guide — scheduling & re-inspection fees →

Tips

  • Fallon's Code of Ordinances does not publish a standalone 'demolition permit' checklist (utility-disconnect letter, site-bond amount, etc.) the way some larger cities do — confirm exact demolition submittal requirements and any site-restoration expectations directly with the Building Department at (775) 423-5107.
  • Moving a building into, or within, the city is a materially different (and more involved) process than demolition — it requires a City Council public hearing under Chapter 17.28, not just a Building Department permit.

Frequently asked questions

Fallon requires a demolition permit for: It is unlawful to construct, or commence construction — a term expressly including 'erection of a building... and other work covered in the codes adopted' — without a permit from the city engineer; demolition of a structure is treated as construction-related work requiring a permit under this same section (City Code § 17.08.010); Application made on Building Department forms with a detailed statement of the work (City Code § 17.08.020); Demolition work must comply with the safeguards during construction/demolition provisions of the adopted 2024 IBC; Moving a building (as distinct from demolishing it) instead requires the separate process in Chapter 17.28: application to the city clerk, inspection and report by the building inspector, and a City Council public hearing with notice mailed to owners within 300 feet before an order approving or rejecting the move is entered (City Code §§ 17.28.030-17.28.060) — confirm with the Building Department which pathway (demolition vs. moving permit) applies to a given project. If your project isn't listed, confirm with City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 before starting work.

In Fallon, the published Demolition Permit Fee is: Not published — set by City Council resolution; no dedicated demolition fee table found on the City website or in the Municode-hosted ordinance text. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Fallon does not publish a plan-review timeline for this permit. Contact City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 for current turnaround.

You'll need: City of Fallon Building Department Permit Application. See the required-documents checklist on this page for details on each.

Fallon requires 1 inspection(s) for a demolition permit, in order: Building Department Inspections. Schedule each through City of Fallon Building Department (Engineering and Public Works) ((775) 423-9862 / (775) 423-5107).

Apply through City of Fallon Building Department (Engineering and Public Works) at 55 West Williams Avenue, Fallon, Nevada 89406. Phone: (775) 423-9862 / (775) 423-5107, email: buildingpermits@fallonnevada.gov. Office hours: City Building Department, 55 W. Williams Avenue, Fallon, NV 89406 (fax (775) 423-8874). The Building Department is organizationally part of the City's Engineering and Public Works Department, which is responsible for 'Airport Oversight, Building Inspections, Building Permit Issuance.' Applications may be submitted in person, or (for roofing/siding-type minor work per the permit form) scanned and emailed to the office; the City Engineer reviews and issues construction permits per City Code Chapter 17.08.. Official information: https://www.fallonnevada.gov/business/business-licenses-building-permits/.

Fallon, Nevada has adopted: The City of Fallon self-administers its own building permitting program within city limits — it is NOT routed to Churchill County. The City Building Department (55 W. Williams Avenue) issues permits and performs inspections directly; Churchill County's separate Building Department (270 S. Maine Street, Suite A, Fallon, NV) has its own, distinct jurisdiction limited to unincorporated Churchill County. Source: City of Fallon Code of Ordinances Chapter 17.04 and 17.08 (city engineer/building department issues permits); City of Fallon Departments page (Engineering and Public Works: 'Airport Oversight, Building Inspections, Building Permit Issuance'); Churchill County Building Department page (separate department/address for unincorporated county).; Nevada has no single mandatory statewide building code edition for all jurisdictions (unlike Montana) — Nevada is a home-rule state for building codes, with the principal statewide requirement being an energy-code floor under NRS 701.220 (local governments must adopt a code at least as stringent as the most recent published IECC edition, currently the 2024 IECC per the Nevada Governor's Office of Energy). Each city/county separately adopts its own building code editions and amendments. City of Fallon's actual adopted editions are documented below from its own Code of Ordinances — not assumed from any statewide default.; 2024 International Building Code (IBC), with Appendices C, E, H, and I, adopted by the City of Fallon with local additions/deletions (Section 113 deleted; Section 312.1 amended; Section 1612.3 amended to insert 'Churchill County and Incorporated Areas' and 'April 5, 2021' effective flood-hazard date). Source: City of Fallon Code of Ordinances § 17.04.020(A); 2024 International Residential Code (IRC), with Appendices AB, BF, CA, CB, CD, and CE, adopted by the City of Fallon (Section R112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(B); 2024 International Existing Building Code (IEBC), with Appendices A and B, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(C); 2024 International Fuel Gas Code (IFGC), with Appendices A, B, and C, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(D); 2024 International Mechanical Code (IMC), adopted by the City of Fallon (Sections 112 and 113 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(E); 2024 International Swimming Pool and Spa Code (ISPSC), adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(F); 2024 Uniform Plumbing Code (UPC), with Appendices A, B, and D, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table B) — Nevada jurisdictions may adopt either the UPC or the IPC; Fallon adopted the UPC. Source: City of Fallon Code of Ordinances § 17.04.020(G); 2024 Uniform Mechanical Code (UMC), with Appendices A, B, and C, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table C) — adopted alongside (in addition to) the IMC. Source: City of Fallon Code of Ordinances § 17.04.020(H); 2024 International Energy Conservation Code (IECC), adopted by the City of Fallon (Section 109 deleted) — satisfies the NRS 701.220 statewide energy-code floor. Source: City of Fallon Code of Ordinances § 17.04.020(I); NRS 701.220; 2023 National Electrical Code (NEC), adopted by the City of Fallon. Source: City of Fallon Code of Ordinances § 17.04.020(J); 2024 Northern Nevada Amendments (NNA), published by the Northern Nevada Chapter of the International Code Council on February 20, 2025, adopted by the City of Fallon, amending IBC Table 1608.2.1 (ground snow load table) to replace 'Lyon County' with 'City of Fallon and Lyon County.' Source: City of Fallon Code of Ordinances § 17.04.020(K); All codes adopted 'by reference,' together with the noted supplements, amendments, and additions/deletions, per Ordinance No. 747 (adopted March 4, 2014) as most recently amended by Ordinance No. 788 (adopted December 2, 2025). 'Jurisdiction' and similar terms in the adopted codes mean the City of Fallon. Source: City of Fallon Code of Ordinances §§ 17.04.010, 17.04.020, 17.04.030. Local amendments apply — see the Fallon overview page for the full list.

No dedicated 'Demolition' chapter distinct from the general construction-permit requirement was found in the City of Fallon Code of Ordinances. Demolition is permitted as construction-related work under City Code § 17.08.010 and reviewed against the demolition provisions of the adopted 2024 IBC. Moving a building (rather than demolishing it) is a separate process under Chapter 17.28 requiring a City Council public hearing.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.