Mechanical / HVAC Permit in Fallon, Nevada
Required for installation, change-out, or repair of heating, cooling, and ventilation equipment within Fallon city limits, governed by the 2024 International Mechanical Code (IMC) and 2024 Uniform Mechanical Code (UMC) as adopted by the City of Fallon.
Verified 2026-07-23 · Source
When you need this permit
- A construction permit from the city engineer is required for mechanical work (City Code § 17.08.010)
- Governed by the 2024 IMC (Sections 112 and 113 deleted) and the 2024 UMC (Table 104.5 replaced with the City's own 'Table C'), both adopted by City of Fallon Ordinance No. 788 (City Code § 17.04.020(E), (H))
- 2024 International Fuel Gas Code (IFGC) also adopted for fuel-gas-fired equipment and gas piping (City Code § 17.04.020(D))
- The Permit Application form's 'HVAC Installations' section covers change-out, new installation, electric-to-gas unit conversion, and A/C or heat pump (with tonnage)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Inspections
The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate rough-in/final inspection scheduling directly with the Building Department at (775) 423-5107
See the full Fallon inspection guide — scheduling & re-inspection fees →
Tips
- Fallon adopted both the IMC and the UMC together (with the UMC's fee table replaced by the City's own Table C) — verify with the Building Department which code governs a specific piece of equipment if in doubt.
- A/C and heat pump permits require specifying unit tonnage on the application form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fallon
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Fallon project checklist
Describe your project once and get every permit, document, and fee it triggers in Fallon — in one checklist. Free, for any city and any number of projects.
Get started →