Required for installation of rooftop or ground-mounted solar photovoltaic systems within Fallon city limits. Falls under the City's general construction-permit requirement, governed by the 2024 IRC/IBC (structural/mounting) and the 2023 NEC (Article 705 interconnection requirements) as adopted by the City of Fallon.

Verified 2026-07-23 · Source

When you need this permit

  • A construction permit from the city engineer is required for solar PV installation as electrical/structural work under City Code § 17.08.010 ('erection of a building... plumbing mechanical, electrical... and other work covered in the codes adopted')
  • Structural/mounting design must comply with the 2024 IBC/IRC as adopted by City of Fallon Ordinance No. 788, including the 2024 Northern Nevada Amendments ground-snow-load table (IBC Table 1608.2.1, 'City of Fallon and Lyon County')
  • Electrical interconnection must comply with the 2023 NEC (including Article 705 interconnected/utility-interactive system requirements) as adopted by City Code § 17.04.020(J)
  • No dedicated solar-specific plan-requirements document (of the kind some larger Nevada/Montana cities publish) was found published by the City of Fallon; applicants should submit under the standard Building Permit Application and confirm submittal specifics (one-line diagram, structural calculations, module/inverter listings) directly with the Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building/Electrical Permit Fee (solar PV)City of Fallon Code of Ordinances § 17.08.080; confirm current amount with the Building Department at (775) 423-5107
Not published — set by City Council resolution; no dedicated solar fee table found on the City website or in the Municode-hosted ordinance text

Review timeline

Plan review
Not published — contact the department

How long did your Solar Photovoltaic (PV) Permit permit actually take in Fallon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Department Inspections

    The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate rough electrical/final inspection scheduling directly with the Building Department at (775) 423-5107

See the full Fallon inspection guide — scheduling & re-inspection fees →

Tips

  • No City of Fallon-specific solar PV submittal-requirements document (site plan/one-line diagram/labeling diagram checklist) was found published online — call the Building Department at (775) 423-5107 before submitting to confirm exactly what plan set they expect.
  • Structural mounting calculations must still account for Fallon's adopted 2024 Northern Nevada Amendments ground-snow-load entry (IBC Table 1608.2.1) — confirm the current design value with the Building Department.

Frequently asked questions

Fallon requires a solar photovoltaic (pv) permit for: A construction permit from the city engineer is required for solar PV installation as electrical/structural work under City Code § 17.08.010 ('erection of a building... plumbing mechanical, electrical... and other work covered in the codes adopted'); Structural/mounting design must comply with the 2024 IBC/IRC as adopted by City of Fallon Ordinance No. 788, including the 2024 Northern Nevada Amendments ground-snow-load table (IBC Table 1608.2.1, 'City of Fallon and Lyon County'); Electrical interconnection must comply with the 2023 NEC (including Article 705 interconnected/utility-interactive system requirements) as adopted by City Code § 17.04.020(J); No dedicated solar-specific plan-requirements document (of the kind some larger Nevada/Montana cities publish) was found published by the City of Fallon; applicants should submit under the standard Building Permit Application and confirm submittal specifics (one-line diagram, structural calculations, module/inverter listings) directly with the Building Department. If your project isn't listed, confirm with City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 before starting work.

In Fallon, the published Building/Electrical Permit Fee (solar PV) is: Not published — set by City Council resolution; no dedicated solar fee table found on the City website or in the Municode-hosted ordinance text. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Fallon does not publish a plan-review timeline for this permit. Contact City of Fallon Building Department (Engineering and Public Works) at (775) 423-9862 / (775) 423-5107 for current turnaround.

You'll need: City of Fallon Building Department Permit Application. See the required-documents checklist on this page for details on each.

Fallon requires 1 inspection(s) for a solar photovoltaic (pv) permit, in order: Building Department Inspections. Schedule each through City of Fallon Building Department (Engineering and Public Works) ((775) 423-9862 / (775) 423-5107).

Apply through City of Fallon Building Department (Engineering and Public Works) at 55 West Williams Avenue, Fallon, Nevada 89406. Phone: (775) 423-9862 / (775) 423-5107, email: buildingpermits@fallonnevada.gov. Office hours: City Building Department, 55 W. Williams Avenue, Fallon, NV 89406 (fax (775) 423-8874). The Building Department is organizationally part of the City's Engineering and Public Works Department, which is responsible for 'Airport Oversight, Building Inspections, Building Permit Issuance.' Applications may be submitted in person, or (for roofing/siding-type minor work per the permit form) scanned and emailed to the office; the City Engineer reviews and issues construction permits per City Code Chapter 17.08.. Official information: https://www.fallonnevada.gov/business/business-licenses-building-permits/.

Fallon, Nevada has adopted: The City of Fallon self-administers its own building permitting program within city limits — it is NOT routed to Churchill County. The City Building Department (55 W. Williams Avenue) issues permits and performs inspections directly; Churchill County's separate Building Department (270 S. Maine Street, Suite A, Fallon, NV) has its own, distinct jurisdiction limited to unincorporated Churchill County. Source: City of Fallon Code of Ordinances Chapter 17.04 and 17.08 (city engineer/building department issues permits); City of Fallon Departments page (Engineering and Public Works: 'Airport Oversight, Building Inspections, Building Permit Issuance'); Churchill County Building Department page (separate department/address for unincorporated county).; Nevada has no single mandatory statewide building code edition for all jurisdictions (unlike Montana) — Nevada is a home-rule state for building codes, with the principal statewide requirement being an energy-code floor under NRS 701.220 (local governments must adopt a code at least as stringent as the most recent published IECC edition, currently the 2024 IECC per the Nevada Governor's Office of Energy). Each city/county separately adopts its own building code editions and amendments. City of Fallon's actual adopted editions are documented below from its own Code of Ordinances — not assumed from any statewide default.; 2024 International Building Code (IBC), with Appendices C, E, H, and I, adopted by the City of Fallon with local additions/deletions (Section 113 deleted; Section 312.1 amended; Section 1612.3 amended to insert 'Churchill County and Incorporated Areas' and 'April 5, 2021' effective flood-hazard date). Source: City of Fallon Code of Ordinances § 17.04.020(A); 2024 International Residential Code (IRC), with Appendices AB, BF, CA, CB, CD, and CE, adopted by the City of Fallon (Section R112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(B); 2024 International Existing Building Code (IEBC), with Appendices A and B, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(C); 2024 International Fuel Gas Code (IFGC), with Appendices A, B, and C, adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(D); 2024 International Mechanical Code (IMC), adopted by the City of Fallon (Sections 112 and 113 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(E); 2024 International Swimming Pool and Spa Code (ISPSC), adopted by the City of Fallon (Section 112 deleted). Source: City of Fallon Code of Ordinances § 17.04.020(F); 2024 Uniform Plumbing Code (UPC), with Appendices A, B, and D, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table B) — Nevada jurisdictions may adopt either the UPC or the IPC; Fallon adopted the UPC. Source: City of Fallon Code of Ordinances § 17.04.020(G); 2024 Uniform Mechanical Code (UMC), with Appendices A, B, and C, adopted by the City of Fallon (Table 104.5 replaced with the City's own Table C) — adopted alongside (in addition to) the IMC. Source: City of Fallon Code of Ordinances § 17.04.020(H); 2024 International Energy Conservation Code (IECC), adopted by the City of Fallon (Section 109 deleted) — satisfies the NRS 701.220 statewide energy-code floor. Source: City of Fallon Code of Ordinances § 17.04.020(I); NRS 701.220; 2023 National Electrical Code (NEC), adopted by the City of Fallon. Source: City of Fallon Code of Ordinances § 17.04.020(J); 2024 Northern Nevada Amendments (NNA), published by the Northern Nevada Chapter of the International Code Council on February 20, 2025, adopted by the City of Fallon, amending IBC Table 1608.2.1 (ground snow load table) to replace 'Lyon County' with 'City of Fallon and Lyon County.' Source: City of Fallon Code of Ordinances § 17.04.020(K); All codes adopted 'by reference,' together with the noted supplements, amendments, and additions/deletions, per Ordinance No. 747 (adopted March 4, 2014) as most recently amended by Ordinance No. 788 (adopted December 2, 2025). 'Jurisdiction' and similar terms in the adopted codes mean the City of Fallon. Source: City of Fallon Code of Ordinances §§ 17.04.010, 17.04.020, 17.04.030. Local amendments apply — see the Fallon overview page for the full list.

No dedicated solar-specific application or requirements checklist was found published by the City of Fallon as of this review. Solar PV work is permitted under the City's standard Building Permit Application and reviewed against the adopted 2024 IBC/IRC (structural) and 2023 NEC (electrical interconnection, NEC Article 705).

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.