Residential Solar Photovoltaic (PV) Permit — Ely, Nevada · Requirements sheet
Verified 2026-07-20 · Source: https://www.cityofelynv.gov/building-department-and-building-codes-city-of-ely/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar Photovoltaic (PV) Permit in Ely, Nevada
Rooftop or ground-mount residential solar PV installation within Ely city limits is not a separately named permit type — it is covered by the City's general building-permit trigger language ('to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system'), per the City's own How Do I/FAQ page, and is reviewed under the 2018 IBC/IRC (structural/mounting scope) and the 2011 NEC (electrical/interconnection scope) as identified on the City's Building Department & Building Codes webpage. No solar-specific application, checklist, or fee line is published by the City of Ely.
Verified 2026-07-20 · Source
When you need this permit
- Building permit required for installation of any electrical system, per the City's How Do I/FAQ page language ('to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system')
- Structural/mounting scope (roof penetrations, racking attachment) reviewed against the 2018 IBC/IRC as adopted (Ely Municipal Code 9-1-1) and the City's published design criteria (36-inch frost depth, seismic zone D or C, 115 mph wind speed, 1,500 lb. soil bearing capacity)
- Electrical/interconnection scope reviewed against the 2011 NEC as identified on the City's Building Department & Building Codes webpage
- Application submitted on the joint City of Ely/White Pine County Building Permit Application, listing the Building and/or Electrical Contractor's name/address and both State License Number and City License Number
- Two copies of a site plan and two copies of construction plans required, per the general Building Permit Package checklist
- Owner Builder Affidavit of Exemption (Nevada State Contractors Board) required if the owner is self-performing work in lieu of a licensed contractor Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Interconnection wiring, disconnects, and conduit runs verified per the 2011 NEC before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified against approved plans
See the full Ely inspection guide — scheduling & re-inspection fees →
Tips
- The City of Ely has no dedicated solar/PV permit, checklist, or fee schedule — a PV installation is processed as a standard building/electrical permit under the general trigger language covering installation of 'any electrical... system.'
- No dollar-amount fee schedule for any permit type (including solar/electrical) is published by the City. Ely Municipal Code 9-1-5 ties fees to the unpublished 1997 Uniform Administrative Code fee table; confirm current fee amounts directly with the Building Department at (775) 289-6500 or (775) 289-2430.
- Any work performed prior to permit issuance is subject to double permit fees, per the City of Ely Building Permit Package.
- The City's electrical code edition (2011 NEC) predates NEC 690's more recent rapid-shutdown provisions introduced in later cycles, so equipment and design assumptions based on a current NEC may not match what is enforced here. Confirm with the Building Department which PV and interconnection requirements apply.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ely building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Ely's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Ely yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Ely lands. Privacy.
Other permits in Ely
Residential Solar Photovoltaic (PV) Permit in other cities
Compare residential solar photovoltaic (pv) permit fees across Nevada →
Look up this fee in a different city →
Now live
Build your Ely project checklist
Describe your project once and get every permit, document, and fee it triggers in Ely — in one checklist. Free, for any city and any number of projects.