Fire Sprinkler / Fire Alarm Permit (No Dedicated Fee Schedule — Reviewed via Building Permit 'Fire' Line) in Ely, Nevada

Ely's fire code is adopted entirely by reference: Ely Municipal Code 7-2-1 (Ord. 673, 8-27-2015) states 'the city's fire code shall be as adopted by the state fire marshal pursuant to Nevada Revised Statutes chapter 477 et seq.,' and the City's Building Department & Building Codes webpage separately identifies the specific edition in effect as the 2018 International Fire Code. The Ely City Fire Department (Title 7, Chapter 1) does not administer a separate fire-sprinkler or fire-alarm permit application, checklist, or fee schedule; fire-protection-system work is instead captured within the standard joint City of Ely/White Pine County Building Permit Application, which itemizes a dedicated 'Fire' review-fee line (dollar amount not published) alongside RPC, Health, and Will Serve fee lines, reviewed by the Ely Fire Chief or White Pine County Fire Chief.

Reviewed 2026-07-22 · Source

When you need this permit

  • Fire-protection system work (sprinklers, alarms, detection) is captured within the standard Building Permit Application's 'Fire' review-fee line item, reviewed by the Ely Fire Chief or White Pine County Fire Chief — no separate fire-sprinkler/alarm application exists
  • Governed by the fire code as adopted by the Nevada State Fire Marshal pursuant to NRS Chapter 477 (Ely Municipal Code 7-2-1), separately identified as the 2018 International Fire Code on the City's Building Department and Building Codes webpage
  • Application submitted on the joint City of Ely/White Pine County Building Permit Application, describing the scope of fire-protection work and listing the installing contractor's name/address and State/City license numbers
  • For new construction generally, an 'all-weather road' emergency-vehicle-access approval letter from the Ely Fire Chief or White Pine County Fire Chief is required, per the City's Building Permit Package checklist

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler / Fire Alarm Permit (No Dedicated Fee Schedule — Reviewed via Building Permit 'Fire' Line) permit actually take in Ely?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Fire Protection System

    Sprinkler piping or fire alarm wiring and device placement verified before concealment, if applicable

  2. 2

    Final

    Fire protection system tested (e.g., hydrostatic/flow test for sprinklers, functional test for alarms) and verified against the adopted fire code before occupancy

See the full Ely inspection guide — scheduling & re-inspection fees →

Tips

  • Ely does not have a locally-administered, separately-fee-scheduled fire-sprinkler or fire-alarm permit — fire-protection-system work is folded into the standard Building Permit Application's 'Fire' review-fee line, the same joint form used for all other trade permits in this jurisdiction.
  • Ely's fire code is adopted purely by reference to whatever the Nevada State Fire Marshal has adopted under NRS Chapter 477, rather than by direct city ordinance text (contrast with the City's own direct-ordinance adoption of the 2018 IBC/IRC). Confirm the specific fire-protection-system standards currently enforced with the Building Department at (775) 289-6500 or the Ely Fire Chief.
  • No dollar-amount fee schedule for fire-protection-system work (or any permit type) is published by the City; Ely Municipal Code 9-1-5 ties building-code fees to the unpublished 1997 Uniform Administrative Code fee table.
  • The Nevada State Fire Marshal's online Fire Protection Licensing page could not be independently verified for a state-level sprinkler/alarm fee or timeline figure — it returned an active bot-detection challenge page rather than content during this chase. This is a genuine access gap, not a confirmed absence of a state figure.

Frequently asked questions

Ely requires a fire sprinkler / fire alarm permit (no dedicated fee schedule — reviewed via building permit 'fire' line) for: Fire-protection system work (sprinklers, alarms, detection) is captured within the standard Building Permit Application's 'Fire' review-fee line item, reviewed by the Ely Fire Chief or White Pine County Fire Chief — no separate fire-sprinkler/alarm application exists; Governed by the fire code as adopted by the Nevada State Fire Marshal pursuant to NRS Chapter 477 (Ely Municipal Code 7-2-1), separately identified as the 2018 International Fire Code on the City's Building Department and Building Codes webpage; Application submitted on the joint City of Ely/White Pine County Building Permit Application, describing the scope of fire-protection work and listing the installing contractor's name/address and State/City license numbers; For new construction generally, an 'all-weather road' emergency-vehicle-access approval letter from the Ely Fire Chief or White Pine County Fire Chief is required, per the City's Building Permit Package checklist. If your project isn't listed, confirm with City of Ely Building Department at (775) 289-6500 / (775) 289-2430 before starting work.

Ely does not publish a plan-review timeline for this permit. Contact City of Ely Building Department at (775) 289-6500 / (775) 289-2430 for current turnaround.

You'll need: Building Permit Application (City of Ely/White Pine County joint form). See the required-documents checklist on this page for details on each.

Ely requires 2 inspection(s) for a fire sprinkler / fire alarm permit (no dedicated fee schedule — reviewed via building permit 'fire' line), in order: Rough Fire Protection System, Final. Schedule each through City of Ely Building Department ((775) 289-6500 / (775) 289-2430).

Apply through City of Ely Building Department at 501 Mill Street, P.O. Box 299, Ely, NV 89301. Phone: (775) 289-6500 / (775) 289-2430, email: buildingofficial@cityofelynv.gov. Office hours: Monday-Friday 8:00 AM-5:00 PM. City of Ely Building Department, 501 Mill Street, Ely, NV 89301 (mailing: P.O. Box 299, Ely, NV 89301). Fax (775) 289-1463. Building Official: Christopher Flannery (buildingofficial@cityofelynv.gov). The Building and Planning Department is jointly operated with White Pine County (Building & Planning Dept. Manager Jennifer Drew-Lesher, jdrew@whitepinecountynv.gov) and uses a shared City of Ely/White Pine County Building Permit Application form. Source: City of Ely Building Department & Building Codes page; Building Permit Application (joint form).. Official information: https://www.cityofelynv.gov/building-department-and-building-codes-city-of-ely/.

Ely, Nevada has adopted: Nevada is a home-rule state for building codes: there is no single mandatory statewide building-code edition — each city and county adopts and amends its own code. The only genuine statewide floor is the energy code: Nevada's Energy Assurance/building energy standards reference the IECC, and NRS 701.220 directs the State to adopt and update energy efficiency standards for new construction. Always confirm the specific adopted edition for the city or county in question rather than assuming a uniform statewide building code. Source: Nevada Legislature NRS Chapter 701 (State Office of Energy).; City of Ely Municipal Code Title 9, Chapter 1, Section 9-1-1 (Building Code Adopted, Ordinance 746, adopted 8-18-2022): 'The City of Ely hereby adopts the International Building Code (IBC), 2018 edition, including all appendices as published by the International Code Council as the building code for the City of Ely.' Source: Ely Municipal Code 9-1-1, American Legal Publishing code library.; International Residential Code (IRC), 2018 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; Uniform Mechanical Code, 2018 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; Uniform Plumbing Code, 2018 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; International Fire Code, 2018 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; National Electric Code (NEC), 2011 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; International Energy Conservation Code (IECC), 2018 edition, as identified on the City of Ely Building Department & Building Codes webpage. Source: City of Ely Building Department and Building Codes page.; At least one copy of the operative building code is on file in the office of the Ely City Clerk for use and examination by the public, per Ely Municipal Code 9-1-1(B). Source: Ely Municipal Code 9-1-1.. Local amendments apply — see the Ely overview page for the full list.

No. Fire-protection-system work is reviewed as part of the standard joint City of Ely/White Pine County Building Permit Application, which includes a dedicated 'Fire' review-fee line. Ely's fire code itself is adopted by reference to the Nevada State Fire Marshal's code under NRS Chapter 477 (Ely Municipal Code 7-2-1), and is separately identified as the 2018 International Fire Code on the City's Building Department webpage. Source: Ely Municipal Code 7-2-1; City of Ely Building Department and Building Codes page; joint Building Permit Application.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ely building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.