Residential Addition / Remodel Permit — Ely, Nevada · Requirements sheet
Verified 2026-07-03 · Source: https://codelibrary.amlegal.com/codes/elynv/latest/ely_nv/0-0-0-6068
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel Permit in Ely, Nevada
Required for room additions, remodels, and structural alterations to existing residential dwellings in Ely, using the same joint City of Ely/White Pine County Building Permit Application and Building Permit Package checklist used for new construction, with 'Addition' or 'Alteration' checked as the class of work.
Verified 2026-07-03 · Source
When you need this permit
- Building permit required for the erection, construction, alteration, enlargement, repair, or conversion of any building or structure, per Ely Municipal Code 12-16-2 (Building Permits, Ord. 410) and the general permit requirement described in the City's Building Permit Package
- Application must be accompanied by a plot plan (drawn to scale) showing the size and location of the lot and existing/proposed buildings or structures, dimensions of yards and open spaces, and other information as may be necessary, per Ely Municipal Code 12-16-2(A)
- Plans and descriptions must be submitted to the applicable reviewing body/commission for approval or disapproval, per Ely Municipal Code 12-16-2(B)
- No permit shall be issued unless the application conforms to all applicable zoning-title regulations and the proposed use conforms to zoning; any permit issued in conflict is null and void, per Ely Municipal Code 12-16-2(D)
- Same supporting documentation as new construction applies where relevant: proof of ownership, utility letters, contractor license numbers, and (if applicable) Regional Planning Commission approvals for any variance or zone change Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Framing
Structural framing and connections to the existing structure verified per plans
- 2
Rough Electrical / Plumbing / Mechanical
Applicable trade rough-ins verified before walls are closed
- 3
Insulation
Insulation verified before drywall installation, where applicable
- 4
Final
All work complete and verified per approved plans
See the full Ely inspection guide — scheduling & re-inspection fees →
Tips
- No addition/remodel-specific review timeline or fee schedule is published by the City of Ely. Ely Municipal Code 12-16-2 sets application and conformance requirements but no review-duration clock. Confirm current turnaround and fees with the Building Department at (775) 289-6500.
- A variance or use permit, once authorized, allows the Building Official to issue a building permit consistent with that variance/use permit, but only after any rehearing/appeal period has expired without a filed appeal, per Ely Municipal Code 12-16-2(C).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ely building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Ely
Residential Addition / Remodel Permit in other cities
Compare residential addition / remodel permit fees across Nevada →
Look up this fee in a different city →
Now live
Build your Ely project checklist
Describe your project once and get every permit, document, and fee it triggers in Ely — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →