Ely building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Ely, Nevada.

Verified 2026-07-03 · Source

How to schedule

Inspections are requested through the building department below.

Address
501 Mill Street, P.O. Box 299, Ely, NV 89301
Phone
(775) 289-6500 / (775) 289-2430
Office hours
Monday-Friday 8:00 AM-5:00 PM. City of Ely Building Department, 501 Mill Street, Ely, NV 89301 (mailing: P.O. Box 299, Ely, NV 89301). Fax (775) 289-1463. Building Official: Christopher Flannery (buildingofficial@cityofelynv.gov). The Building and Planning Department is jointly operated with White Pine County (Building & Planning Dept. Manager Jennifer Drew-Lesher, jdrew@whitepinecountynv.gov) and uses a shared City of Ely/White Pine County Building Permit Application form. Source: City of Ely Building Department & Building Codes page; Building Permit Application (joint form).

Published scheduling rules

  • All inspections must be scheduled at least 24 hours in advance (per the Building Permit Package) — the joint Building Permit Application separately states 48 hours in advance for inspections; confirm current scheduling lead time with the Building Department at (775) 289-6500. (Residential Building Permit (New Construction))
  • All inspections must be scheduled 48 hours in advance per the joint Building Permit Application (the separate Building Permit Package states 24 hours in advance for inspections generally) (Electrical Permit)
  • All inspections must be scheduled 48 hours in advance per the joint Building Permit Application (EV Charger / EVSE Permit (No Dedicated Type — Fee Schedule Unpublished))

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footings

    Before concrete pour — footing size and placement verified

  2. 2

    Foundation

    Foundation walls and forms verified prior to backfill

  3. 3

    Under-Slab Utilities

    Under-slab plumbing and utility rough-in verified before slab pour

  4. 4

    Rough Framing

    Structural framing verified per approved plans

  5. 5

    Rough Electrical

    Electrical rough-in verified before walls are closed

  6. 6

    Rough Plumbing

    Plumbing rough-in verified before walls are closed

  7. 7

    Rough Mechanical

    Mechanical/HVAC rough-in verified before walls are closed

  8. 8

    Insulation

    Insulation verified before drywall installation

  9. 9

    Dry Wall Nailing

    Drywall fastening pattern verified

  10. 10

    Final

    All work complete and verified per approved plans and adopted codes

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough Framing

    Structural framing and connections to the existing structure verified per plans

  2. 2

    Rough Electrical / Plumbing / Mechanical

    Applicable trade rough-ins verified before walls are closed

  3. 3

    Insulation

    Insulation verified before drywall installation, where applicable

  4. 4

    Final

    All work complete and verified per approved plans

Applies to: Plumbing Permit

  1. 1

    Under-Slab Utilities

    Underground/under-slab plumbing verified before concrete pour

  2. 2

    Rough Plumbing

    Pipes and venting verified before walls are closed

  3. 3

    Final

    All fixtures connected and verified per the 2018 UPC

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring, box placement, and service connections verified before walls are closed

  2. 2

    Final

    Devices installed and panel verified per the 2011 NEC

Applies to: EV Charger / EVSE Permit (No Dedicated Type — Fee Schedule Unpublished)

  1. 1

    Rough Electrical

    Charger circuit wiring and breaker sizing verified before concealment, if applicable

  2. 2

    Final

    EVSE installed, GFCI/disconnect and connections verified against the 2011 NEC

Applies to: Fire Sprinkler / Fire Alarm Permit (No Dedicated Fee Schedule — Reviewed via Building Permit 'Fire' Line)

  1. 1

    Rough Fire Protection System

    Sprinkler piping or fire alarm wiring and device placement verified before concealment, if applicable

  2. 2

    Final

    Fire protection system tested (e.g., hydrostatic/flow test for sprinklers, functional test for alarms) and verified against the adopted fire code before occupancy

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork and mechanical equipment rough-in verified before walls are closed

  2. 2

    Final

    Equipment operational and verified per the 2018 UMC

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Interconnection wiring, disconnects, and conduit runs verified per the 2011 NEC before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified against approved plans

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ely building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Ely building permits

Get alerts for Ely

We'll email you when Ely's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.