Plumbing Permit in Fallon, Nevada
Required for installation, alteration, or repair of plumbing systems, water heaters, and water/sewer service lines within Fallon city limits, governed by the 2024 Uniform Plumbing Code (UPC) as adopted by the City of Fallon.
Verified 2026-07-23 · Source
When you need this permit
- A construction permit from the city engineer is required for plumbing work (City Code § 17.08.010)
- Governed by the 2024 UPC, with Appendices A, B, and D, as adopted by City of Fallon Ordinance No. 788; the UPC's standard Table 104.5 permit-fee table is replaced by the City's own 'Table B' (City Code § 17.04.020(G))
- The Permit Application form's 'Minor Electrical & Plumbing' section covers water service replacement, sewer service replacement, and gas line add/replace (with footage)
- The Water Heater section of the application covers gas, electric, gas-to-electric, electric-to-gas conversion, and relocation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Inspections
The city engineer performs a sufficient number of inspections to assure project safety (City Code § 17.08.070(B)); coordinate rough-in/final inspection scheduling directly with the Building Department at (775) 423-5107
See the full Fallon inspection guide — scheduling & re-inspection fees →
Tips
- Fallon uses the Uniform Plumbing Code (UPC), not the International Plumbing Code (IPC).
- Water heater replacement/conversion (gas-to-electric or electric-to-gas) and relocation are all specifically itemized on the City's permit application form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fallon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fallon
Plumbing Permit in other cities
Compare plumbing permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Fallon project checklist
Describe your project once and get every permit, document, and fee it triggers in Fallon — in one checklist. Free, for any city and any number of projects.
Get started →