Required for re-roofing involving sheathing replacement in Boulder City. Reviewed against the 2018 IBC/IRC as adopted (with Southern Nevada Building Code Amendments). Re-roofing that does NOT involve sheathing replacement, or that installs additional layers within the allowed maximum, is exempt from permit under the Administrative Code; re-roofing involving sheathing replacement qualifies for the City's expedited 'Express Permit' (no-plans) track. There is no dedicated roofing fee table — the general valuation-based Building Permit Fee (Table A) governs.

Verified 2026-07-03 · Source

When you need this permit

  • Building permit required for re-roofing that involves replacement of sheathing ('Re-Roof (sheathing only)' is one of six Express Permit types requiring no plans, per the Permit Submittals page)
  • Replacement of existing roofing material of the same or higher class and the same or lighter material, NOT involving sheathing replacement, is exempt from a permit altogether (2026 Administrative Code Section 106.2, item 25)
  • Installation of additional layers of roofing material over an existing roof covering, not exceeding the maximum allowable number of layers, is also exempt from permit (Section 106.2, item 26)
  • Governed by the City's adopted 2018 IBC / 2018 IRC with Southern Nevada Building Code Amendments for all work requiring a permit
  • No dedicated roofing permit fee table is published; the general valuation-based Building Permit Fee (Table A) applies, using the declared/validated cost of the re-roofing work as valuation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — Table A, valuation-based (general schedule; no dedicated roofing fee table published)2026 Building and Safety Division Administrative Code, Section 111, Table A — the governing fee schedule for building permits without their own dedicated fee table, per Section 110.2(D)
$27.00 minimum ($1-$500), scaling per Table A of the 2026 Administrative Code by declared/validated project valuation
Permit Issuance Fee2026 Administrative Code, Section 110.2(A)
$40.00
Building Plan Review Fee (where plan review applies)2026 Administrative Code, Section 110.2(F); Express Permit track does not require plan review
65% of the building permit fee

Review timeline

Plan reviewBoulder City’s published plan-review target
7–14 business days

How long did your Re-Roofing Permit permit actually take in Boulder City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Completed roofing verified for code compliance

See the full Boulder City inspection guide — scheduling & re-inspection fees →

Tips

  • 'Re-Roof (sheathing only)' is one of six Express Permit types identified by the City that do not require plans, alongside water heater replacement, HVAC replacement, same-for-same service change, gas test, and main breaker replacement. Source: City of Boulder City Permit Submittals page, https://www.bcnv.org/608/Permit-Submittals
  • There is no dedicated per-square-foot or per-item roofing fee table published by Boulder City (unlike electrical/plumbing/mechanical Tables C/D/E) — roofing work is billed against the general valuation-based Building Permit Fee Table A, applying the governing rule in Section 110.2(D) that all building permit fees without their own dedicated fee table use Table A.
  • The plan-review timeframe used here (1-2 weeks) is drawn from the City's Electrical/Plumbing/Mechanical/Demolition permit checklists, the closest published governing timeline for a minor building-permit scope of this kind; no roofing-specific timeline document is separately published.

Frequently asked questions

If the re-roof involves replacing sheathing, yes — it is one of six 'Express Permit' scopes that Boulder City processes without requiring plans. If the re-roof uses the same or a higher class of material, the same or a lighter weight, and does NOT involve sheathing replacement, it is exempt from a permit entirely under Section 106.2 of the City's Administrative Code. Source: City of Boulder City Permit Submittals page and 2026 Building and Safety Division Administrative Code Section 106.2.

In Boulder City, the published Building Permit Fee — Table A, valuation-based (general schedule; no dedicated roofing fee table published) is: $27.00 minimum ($1-$500), scaling per Table A of the 2026 Administrative Code by declared/validated project valuation. Additional published fees: Permit Issuance Fee — $40.00; Building Plan Review Fee (where plan review applies) — 65% of the building permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Boulder City's published plan-review target for a re-roofing permit is 7–14 business days.

You'll need: Building Permit Application (Express Permit track for sheathing re-roofs). See the required-documents checklist on this page for details on each.

Boulder City requires 1 inspection(s) for a re-roofing permit, in order: Final. Schedule each through City of Boulder City Community Development Department, Building and Safety Division ((702) 293-9282).

Apply through City of Boulder City Community Development Department, Building and Safety Division at 401 California Avenue, Boulder City, NV 89005. Phone: (702) 293-9282, email: buildingpermits@bcnv.org. Office hours: Monday through Thursday, 7:00 a.m. to 6:00 p.m. (excluding holidays); applications submitted after office hours are processed the next available work day. Inspection scheduling hotline: (702) 293-9327 or buildinginspections@bcnv.org; inspection requests must be received by 3:30 p.m. for next-business-day scheduling (no Friday/weekend/holiday inspections).. Official information: https://www.bcnv.org/163/Building-Permits.

Boulder City, Nevada has adopted: Nevada has no mandatory statewide building code; NRS 701.220 requires the Nevada Governor's Office of Energy (GOE) to adopt, on a triennial basis, the most recently published International Energy Conservation Code (IECC) as a statewide ENERGY floor only — local governments may not adopt an energy code less stringent than the GOE-adopted IECC edition, but building-code editions for structural/life-safety codes vary city-by-city under home rule. The 2024 IECC was adopted by the GOE effective August 18, 2024, as the current statewide energy floor. Source: NRS 701.220 (Nevada Revised Statutes, Chapter 701 — Energy Policy), https://www.leg.state.nv.us/nrs/nrs-701.html; Nevada Governor's Office of Energy, Building Energy Codes / State Adoption Status, https://www.energy.nv.gov/programs/building-energy-codes/state-adoption-status/. Confirm your city's specific adopted energy-code edition — Boulder City's own adopted edition is documented separately below and is older than the current statewide floor edition (a home-rule city choice, not a floor violation, since IECC 2018 was the floor at the time of Boulder City's last code-cycle adoption).; Boulder City runs its own independent building-permit program (Community Development Department, Building and Safety Division) — it is NOT administered by Clark County. Verified via the City's official Building and Safety Division page and the City's own Administrative Code, fee schedule, and permit-submittal-checklist library, all published on bcnv.org. Source: City of Boulder City Building and Safety Division, https://www.bcnv.org/163/Building-Permits; 2018 International Building Code (IBC), with Southern Nevada Building Code Amendments — applies to buildings other than single-family residential homes and townhomes (2026 Administrative Code Section 101.5.1). Source: City of Boulder City Permit Fee Schedule and Valuation Table (eff. 8/3/2020) 'Currently Adopted Codes/Standards' list, and Residential New Construction (Custom) Permit Submittal Checklist (02/16/2021 V1) 'Applicable Codes' section; 2018 International Existing Building Code (IEBC) — governs additions/modifications to existing buildings (2026 Administrative Code Section 101.5.2); 2018 International Residential Code (IRC), with Southern Nevada Building Code Amendments — applies to single-family homes and townhomes (2026 Administrative Code Section 101.5.3); 2018 Uniform Mechanical Code (UMC), with Southern Nevada Building Code Amendments — Nevada's Southern Nevada jurisdictions use the Uniform Mechanical Code, not the International Mechanical Code; 2018 Uniform Plumbing Code (UPC), with Southern Nevada Building Code Amendments — not the International Plumbing Code; 2017 National Electrical Code (NEC), with Southern Nevada Building Code Amendments; 2018 International Swimming Pool and Spa Code (ISPSC), with Southern Nevada Building Code Amendments; 2018 International Energy Conservation Code (IECC), with Southern Nevada Building Code Amendments — this is Boulder City's own locally adopted energy-code edition (older than the current 2024 IECC statewide floor under NRS 701.220; confirm current status with Building and Safety before relying on this edition for new submittals); 2012 International Fire Code (IFC) per the 2020 Fee Schedule flyer; the 2026 Administrative Code Section 101.5.9 separately lists 'the currently adopted International Fire Code' generically without repeating the edition year — the 2012 edition is the last edition year found published by the City; Southern Nevada Amendments apply to all the above codes per 2026 Administrative Code Section 101.5.10 ('the provisions of the currently adopted Southern Nevada Amendments shall apply to all matters of all of the above mentioned codes'); City of Boulder City Building and Safety Division Administrative Code, 2026 edition — the local administrative/procedural code (permit application, fees, inspections, exemptions); contains substantial copyrighted material from the 2012 IBC per its title page. Source: https://www.bcnv.org/DocumentCenter/View/16731/2026-Building-and-Safety-Division-Administrative-Codepdf; All of the above code editions and amendment references are confirmed current via the City's Permit Submittal Checklists (each dated 02/16/2021 V1, and independently re-served live from bcnv.org as of this review) for Residential New Construction (Custom), Electrical, Plumbing, Mechanical, Demolition, Fence and Retaining Wall, Renewable Energy System Residential PV, and Residential Accessory Building — all list the identical 2018/2018/2018/2017/2018 code-edition set with Southern Nevada Amendments, corroborating the 2020 Fee Schedule flyer. Local amendments apply — see the Boulder City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boulder City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.