Commercial Building Permit (New Construction) — Boulder City, Nevada · Requirements sheet
Verified 2026-08-01 · Source: https://www.bcnv.org/163/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction) in Boulder City, Nevada
Building permit for new commercial/industrial construction in Boulder City, administered by the City's own Building and Safety Division (Community Development Department) — not by Clark County. The City publishes a dedicated 'Commercial – New Construction' permit submittal checklist with its own stated first-review timeframe of 3–4 weeks. Fees are valuation-based under Table A of the 2026 Building and Safety Division Administrative Code, plus a plan review fee of 65% of the building permit fee, collected as a non-refundable deposit before review begins. A shell-only building can be issued a Certificate of Completion (Section 113.3) instead of a Certificate of Occupancy until a tenant build-out follows.
Verified 2026-08-01 · Source
When you need this permit
- Appropriate zoning must already be in place for the proposed use before a building permit application can be accepted for processing (contact Community Development at (702) 293-9282); a permanent address, including suite numbers if applicable, must be assigned (Commercial – New Construction checklist, Part 2 Prerequisites)
- A Drainage [Hydrology] Study and a Traffic Study, if applicable, must each be approved for the site before the application can be accepted (checklist Part 2)
- Construction documents must be prepared by a registered design professional as required by Nevada state statutes, submitted in two or more sets; the Building Official may allow a licensed contractor to prepare plans for work under their control, or waive design-professional preparation where review is not necessary for compliance (2026 Administrative Code Section 108.1) Contractor
- All submitted documents must be digitally stamped/signed; submittals are emailed to buildingpermits@bcnv.org (20MB per email limit — use Dropbox/OneDrive or similar for larger packages) with subject-line keywords such as 'Initial Submittal – [address]' (checklist Part 4)
- A non-refundable plan review deposit equal to the full plan review fee must be paid (invoice emailed to applicant) before staff review any plans/documents (checklist Part 1; Administrative Code Section 110.2(E))
- Incomplete applications are not reviewed until all plans/documents are submitted, and the checklist itself must be filled out — a blank checklist is treated as an incomplete submittal (checklist Part 1)
- The building permit application form requires the applicant's Boulder City Business License number and Nevada State Contractor's License number (or Owner/Builder declaration); general contractors must have Subcontractor Registration Forms on file for mechanical, plumbing and electrical subs Owner-builderContractor
- Project must comply with the City's adopted codes: 2018 IBC, 2018 UMC, 2018 UPC, 2017 NEC, 2018 IECC and 2018 IFC edition listed on the checklist, all with Southern Nevada Building Code Amendments, plus Title 11 (Zoning and Subdivisions) — see this jurisdiction's codesAdopted notes for the full adopted-code picture
- Properties in the federally designated Boulder City Historic District may require Historic Preservation Committee review, which can delay the permit (checklist Part 6; Title 11, Chapter 27)
- Zoning restricts most building heights in Boulder City, including residential, to 25 feet or less (checklist Part 5, Exterior Elevations note)
- No building or structure may be used or occupied until the Building Official issues a Certificate of Occupancy (2026 Administrative Code Section 113.1); the certificate issues only after the Building Official finds no violations of codes enforced by Building and Safety, Planning and Zoning, Fire Department and Public Works, as applicable (Section 113.4)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Inspections per the permit's Inspection Record
The Building Official, upon notification, makes the inspections set forth on the Inspection Record assigned to each permit (Section 112.3); the permit holder must notify the Building Official when work is ready and provide access (Section 112.5). Work may not proceed beyond each successive inspection point without approval, and non-complying work may not be covered or concealed until authorized (Section 112.6)
- 2
Special Inspections
As specified by the construction documents and/or required by Chapter 17 of the International Building Code (Section 112.3.2); the special inspection program must be indicated on the plan cover sheet. A continuous dedicated inspection program may additionally be required at the Building Official's discretion, with all costs paid by the contractor or owner of record (Section 112.3.1)
- 3
Final Inspection
Made after all work required by the building permit is completed (Section 112.3.3)
- 4
Certificate of Occupancy issuance inspection
The Building Official inspects the building and issues the Certificate of Occupancy after finding no violations of provisions enforced by Building and Safety, Planning and Zoning, Fire Department and Public Works, as applicable (Section 113.4); a Temporary Certificate of Occupancy may be issued for safely occupiable portions before full completion (Section 113.5)
See the full Boulder City inspection guide — scheduling & re-inspection fees →
Tips
- Schedule inspections via the hotline (702) 293-9327 or buildinginspections@bcnv.org; requests must be received by 3:30 p.m. for next-business-day scheduling, and the Division performs no Friday, weekend or holiday inspections (overtime Friday/Saturday inspections are available at $90/hour, 2-hour minimum, per Table H).
- Pay the plan review deposit invoice promptly — it is non-refundable, equals the full plan review fee (65% of the building permit fee), and staff will not begin reviewing anything until it is paid.
- Buildings constructed as a shell (not intended for occupancy until later build-out) are issued a Certificate of Completion under Section 113.3 rather than a Certificate of Occupancy, and shell-only valuations deduct 20% under Table B note 3; each subsequent tenant build-out is then a separate commercial-tenant-improvement (Commercial – Remodel) permit.
- A Certificate of Occupancy (Section 113.1) covers the structure; any business operating in the completed space additionally needs a Certificate of Business Occupancy ($60, Section 113.2) obtained through the City's Business License process — see the certificate-of-business-occupancy-permit entry for that flow.
- Starting work without a permit triggers a special investigation and an investigation fee equal to the full permit fee, on top of the permit fee itself (Section 110.2(Q)).
- The Building Official may waive any fee or partial fee for extenuating circumstances beyond the applicant's control (Section 110.2(S)), and unused permits are refundable: 100% of permit fees if no work has commenced, 100% of plan review fees only if withdrawn before any review is conducted (Section 110.2(R)).
- No published fee item is specific to commercial construction as a category — commercial and residential building permits share the same Table A valuation schedule; what differs for commercial is the development fees (Transportation Privilege Tax at $1.00/sq ft, commercial-rate utility connections) and the longer 3–4 week first-review window.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Boulder City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Boulder City.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Boulder City
Commercial Building Permit (New Construction) in other cities
Compare commercial building permit (new construction) fees across Nevada →