EV Charger Installation Permit — Unincorporated White Pine County, Nevada · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.whitepinecounty.net/134/Building-Permit-Procedures-Applications
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger Installation Permit in Unincorporated White Pine County, Nevada
Required for installation of Level 2 or DC fast electric vehicle charging equipment on residential or commercial properties in unincorporated White Pine County. EV charging is not a separately defined permit type in the White Pine County Code; it is administered as an electrical permit (circuit/wiring/interconnection) under the county's adopted 2011 NEC, plus a building permit if a new support structure or canopy is added, mirroring the same treatment documented in the solar-pv-permit entry. No dedicated EV-charger fee line item, valuation table, or charging-infrastructure code chapter is published on the county website: the county's Fee Schedule page links only to the County Clerk's NRS Chapter 19 fee schedule (marriage licenses, document copies, candidate filing — unrelated to building/electrical permits), and the Building Permit Procedures page links to the County's shared City of Ely/White Pine County Building Permit Application form. That application form itself has blank 'Total Valuation of Work', 'Building Permit', 'Plan Check', and 'Fuel Surcharge' fields filled in manually per-project by Building Department staff rather than a published fee table — the fee-setting mechanism is genuinely case-by-case and unpublished, not merely undiscovered.
Reviewed 2026-07-20 · Source
When you need this permit
- Electrical permit required for the charger circuit, wiring, and interconnection, enforced under the 2011 NEC per White Pine County Code §14.12.010, administered under the 2011 Uniform Administrative Code (§14.12.020)
- Building permit additionally required if a new canopy, carport, or structural mounting component is added, per the county's adopted 2018 IBC/IRC
- Submit a Building Permit Application (the county's single application form covers electrical work) describing the scope
- Plot plan may be required showing the charger/structure location relative to the building and property lines if new construction is involved
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover, per the 2011 NEC as adopted
- 2
Final
Charger installed and electrical connections verified
See the full Unincorporated White Pine County inspection guide — scheduling & re-inspection fees →
Tips
- White Pine County has no dedicated EV-charger permit category, fee line item, or charging-infrastructure code chapter published — an installation is treated as a standard electrical permit (plus a building permit if a new structure is added), following the county's general, unpublished valuation-based fee approach, the same treatment documented for the solar-pv-permit entry.
- Because no numeric fee table is published for any permit type in White Pine County, call the Building Department directly at (775) 289-6500 for a project-specific cost estimate before applying.
- The county enforces the 2011 NEC edition (not a more recent cycle) for the electrical portion of an EV charger installation.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated White Pine County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated White Pine County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated White Pine County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated White Pine County lands. Privacy.
Other permits in Unincorporated White Pine County
EV Charger Installation Permit in other cities
Compare ev charger installation permit fees across Nevada →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated White Pine County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated White Pine County — in one checklist. Free, for any city and any number of projects.
Get started →