Skip to main content
PermitBase

Unincorporated Garfield County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Garfield County, Utah.

Verified 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
Garfield County Courthouse, 55 South Main St, PO Box 77, Panguitch, UT 84759
Phone
(435) 676-1111
Office hours
Monday–Friday 8:00 AM–12:00 PM, 1:00 PM–5:00 PM (closed noon–1pm and all holidays)

Published scheduling rules

  • The county uses the 'City Inspect' online portal for applications, payments, and inspection scheduling — not a walk-in-only process. (General)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Footings

    After excavation with required forms and reinforcing steel in place; other required materials except concrete must be on the job site, including slab-edge insulation where applicable.

  2. 2

    Foundation Walls

    After forms and reinforcing steel are in place with other required materials on-site; includes basement wall exterior insulation or crawl space wall insulation where applicable.

  3. 3

    4-Way Rough

    Rough framing, rough electrical, rough plumbing, and rough mechanical performed together where possible. Energy code items (floor/wall insulation, glazing and door area, mass walls, joints/penetrations, duct insulation, vapor retarder, duct construction) checked at the same inspection where applicable.

  4. 4

    Insulation Inspection and Shower Pan

    Insulation installed and shower pan liner tested before cover

  5. 5

    Gypsum Board

    After gypsum board is in place, before taping and finishing

  6. 6

    Final Inspection

    After finish grading and building completion, ready for occupancy but before occupying. The county will not perform a final inspection on an occupied building, and will not issue a signed Final Inspection or Certificate of Occupancy with uncorrected code violations.

Applies to: Commercial Building Permit

  1. 1

    Footings

    After excavation with required forms and reinforcing steel in place.

  2. 2

    Foundation Walls

    After forms and reinforcing steel are in place with other required materials on-site.

  3. 3

    4-Way Rough

    Rough framing, rough electrical, rough plumbing, and rough mechanical performed together where possible.

  4. 4

    Health Department Inspection (Commercial Kitchens/Pools)

    Southwest Utah District Health Department approval required for commercial swimming pools and kitchens before final sign-off.

  5. 5

    Final Inspection

    After finish grading and building completion, ready for occupancy but before occupying. The county will not perform a final inspection on an occupied building.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Rough (Electrical / Plumbing / Mechanical)

    As applicable to the tenant-improvement scope, before wall closure.

  2. 2

    Health Department Inspection (Commercial Kitchens/Pools)

    If the tenant improvement affects a commercial kitchen or pool.

  3. 3

    Final Inspection

    Completed work verified before reoccupancy.

Applies to: Solar Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect and rapid-shutdown placement per the adopted 2023 NEC.

  2. 2

    Final Inspection

    Final electrical/structural inspection prior to energizing, per the county's standard Inspection Information and Schedule.

Re-inspection fees

Residential Building PermitRe-Inspection · Garfield County Building Department Fees schedule
$60.00 per inspection
Commercial Building PermitRe-Inspection · Garfield County Building Department Fees schedule
$60.00 per inspection
Commercial Tenant Improvement / Tenant Finish PermitRe-Inspection · Garfield County Building Department Fees schedule
$60.00 per inspection

Unincorporated Garfield County building permits

Get alerts for Unincorporated Garfield County

We'll email you when Unincorporated Garfield County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.