EV Charger / EVSE Permit in Unincorporated Garfield County, Utah

Garfield County publishes no distinct EV charger / EVSE permit or fee. The county's Building Department Fees schedule prices work through a valuation-based Total Building Permit Valuation table plus itemized categories (stem walls, decks, garages, sheds, solar, signs, etc.); the only catch-all category that could apply to a minor scope with no specific line item is 'Inspections with No Specific Fee — $60.00 per hour.'

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Garfield County
  • New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan submitted with the permit
  • Licensed electrical contractor for the installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Inspections with No Specific FeeGarfield County Building Department Fees schedule (Departmental Fees Resolution) — the county's only published catch-all rate for a scope, such as an EV charger circuit, that does not match any of the schedule's named line items (stem walls, decks, garages, sheds, solar, signs, etc.).
$60.00 per hour
Total Building Permit Valuation (if treated as a valuation-based scope)Garfield County Building Department Fees schedule — general fallback fee basis if the department instead treats an EV charger circuit as a valuation-based building permit rather than an hourly no-specific-fee inspection.
Starting at $60.00 for valuations of $2,000 or less, scaling per the county's valuation table

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Garfield County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection of the new circuit/panel work serving the charger, administered by the Garfield County Building Department.

See the full Unincorporated Garfield County inspection guide — scheduling & re-inspection fees →

Tips

  • Garfield County's fee schedule has no line item naming EV chargers, EVSE, or charging stations — a full-text review (checked 2026-07-20) of the Building Department Fees schedule found no matches. The closest applicable published rate for a minor standalone scope is the $60.00/hour 'Inspections with No Specific Fee' catch-all.
  • Confirm with the Garfield County Building Department whether a standalone EV charger circuit is billed hourly under the no-specific-fee catch-all or under the general valuation-based Total Building Permit Valuation table before applying.

Frequently asked questions

Unincorporated Garfield County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Garfield County; New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan submitted with the permit; Licensed electrical contractor for the installation. If your project isn't listed, confirm with Garfield County Building Department at (435) 676-1111 before starting work.

No. Garfield County publishes no distinct EV/EVSE permit or fee line item. The Building Department's fee schedule's only applicable catch-all for a minor scope with no specific named category is a $60.00/hour 'Inspections with No Specific Fee' rate; otherwise the general valuation-based building permit fee table would apply.

Unincorporated Garfield County does not publish a plan-review timeline for this permit. Contact Garfield County Building Department at (435) 676-1111 for current turnaround.

You'll need: Garfield County Building Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Garfield County requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Garfield County Building Department ((435) 676-1111).

Apply through Garfield County Building Department at Garfield County Courthouse, 55 South Main St, PO Box 77, Panguitch, UT 84759. Phone: (435) 676-1111, email: jared.woolsey@garfield.utah.gov. Office hours: Monday–Friday 8:00 AM–12:00 PM, 1:00 PM–5:00 PM (closed noon–1pm and all holidays). Official information: https://www.garfield.utah.gov/Departments/Building.

Unincorporated Garfield County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code is not listed on Garfield County's own building-department pages, but it is adopted statewide by statute, so it applies here regardless of the county page's omission.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision; Utah Wildland Urban Interface Code — adopted under Utah Code § 15A-2-103; Garfield County charges a WUI plan review fee (one per parcel); NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, and IEBC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.. Local amendments apply — see the Unincorporated Garfield County overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Garfield County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare ev charger / evse permit fees across Utah

Look up this fee in a different city →

Embed this data card →