Unincorporated Grand County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Grand County, Utah.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
59 N 200 E, Moab, UT 84532
Phone
(435) 259-4134
Office hours
Mon–Fri 8:00 AM – 5:00 PM, closed 12:00–1:00 PM and on county holidays. Appointment required — call ahead before visiting; the office does not accept walk-ins.

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Sewer and Water Service Lines

    Installation from road to structure — before excavation is covered

  2. 2

    Electrical Trench

    Underground electrical service trench before backfill

  3. 3

    Footing

    Excavation complete, forms and reinforcing steel in place — before any concrete is poured

  4. 4

    Foundation

    Forms and reinforcing steel in place — before any concrete is poured

  5. 5

    Underground / Under-Slab / Interior Shovel Footings

    Sub-rough plumbing and heating in place, pressure tested — before pipes are buried and floor slab poured

  6. 6

    Slab

    Before concrete pour on slab

  7. 7

    Temporary Power

    Construction power contracted by contractor — Rocky Mountain Power work order number required when scheduling

  8. 8

    Weather Barrier / Lath & Flashing

    Before or after the four-way — before any brick or stucco is installed on a foundation ledge

  9. 9

    Duct Blaster Test

    Performed by third-party inspector; report must be submitted to building@grandcountyutah.net prior to requesting the four-way inspection

  10. 10

    Four-Way (Framing, Rough Electrical, Rough Plumbing, Mechanical)

    All roof/wall/floor framing, fire stopping, and bracing complete with truss calculations on site; wiring, plumbing, and mechanical rough-in complete before concealment

  11. 11

    Gas Line

    Gas piping installed and pressure tested

  12. 12

    Insulation

    After insulation installed, before drywall

  13. 13

    Drywall

    After nailing and before taping of required firewalls and braced walls

  14. 14

    Shower Pan

    Before tile/finish installed over shower pan liner

  15. 15

    Power to Panel / Permanent Power

    Electrical meter base placed and ready to energize — Rocky Mountain Power work order number required when scheduling

  16. 16

    Mechanical

    After all dust-producing work complete, equipment installed/vented, combustion air supplied

  17. 17

    Final

    All work complete, prior to occupancy. Final Floodplain inspection (post-construction Elevation Certificate) also required prior to Certificate of Occupancy if the site is within a flood hazard area.

Applies to: Commercial Building Permit

  1. 1

    Footing / Foundation

    Before concrete pour — verify excavation, forms, and reinforcing steel, per the standard inspection sequence used for Grand County construction.

  2. 2

    Four-Way (Framing, Rough Electrical, Rough Plumbing, Mechanical)

    All roof/wall/floor framing and MEP rough-in complete before concealment, per the same combined-inspection pattern documented for residential permits in this county.

  3. 3

    Final

    All work complete prior to occupancy; Fire Department and Health Department final sign-off required for applicable commercial uses.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Structural (if applicable)

    Wall construction and any structural changes verified before close-in, where the tenant improvement scope includes framing changes.

  2. 2

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in verified against submitted plans, where applicable to the tenant space scope.

  3. 3

    Final

    All work complete prior to occupancy; Fire Department and Health Department final sign-off required for applicable commercial uses (e.g., restaurants).

Applies to: Solar Permit

  1. 1

    Electrical Trench / Rough Electrical

    Conduit runs, wire sizing, disconnect and rapid-shutdown placement per the adopted 2023 NEC.

  2. 2

    Final

    Final electrical/structural inspection prior to energizing.

Re-inspection fees

Residential Building PermitRe-Inspection Fee · Grand County Ordinance No. 688, § 3.06.100(B); assessed after the second failed inspection of the same kind, due prior to the 3rd or subsequent re-inspection(s). One re-inspection per required inspection is included in the base permit fee.
$65.00 per hour

Unincorporated Grand County building permits

Get alerts for Unincorporated Grand County

We'll email you when Unincorporated Grand County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.