EV Charger / EVSE Permit in Unincorporated Grand County, Utah
Grand County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. Installation of a Level 2 or DC fast EV charger involves electrical work, and Grand County's building permit code (Building Permit Requirements for Electrical Work) expressly lists an "Electrical" scope with specific minor-work exemptions (e.g., replacing lamps, connecting portable equipment to existing approved receptacles) — meaning non-exempt electrical installations, including a new dedicated EV charger circuit, require the same general Building Permit issued by the Grand County Building Department, valuation-based per Ordinance No. 688, § 3.06.100(A). No separate EV-specific line item exists.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger, per the county's electrical permit scope (non-exempt electrical alteration work)
- Compliance with the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Verification of the new circuit, panel capacity, and grounding for the EV charger installation, performed under the general Building Permit inspection process.
See the full Unincorporated Grand County inspection guide — scheduling & re-inspection fees →
Tips
- Grand County does not have a separate EV-charger or standalone Electrical permit type — EV charger circuit installations are processed and fee-assessed under the general valuation-based Building Permit.
- Confirm with the Building Inspector at (435) 259-4134 whether a specific EV charger installation qualifies for a minor-work exemption or requires the full Building Permit process.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Grand County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Grand County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Grand County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Grand County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →