This is PermitBase’s published record for Nephi as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Nephi building permits

Verified

Nephi, Utah — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

2021 International Building Code (IBC) — current statewide-adopted edition per Utah Code § 15A-1-204 (Utah adopted the 2021 I-Code suite effective July 1, 2023); Nephi City's own Building Permit page links directly to the ICC code library (codes.iccsafe.org/codes/i-codes) rather than publishing a distinct local edition page, indicating adoption of the statewide-standard edition without a documented local vintage override. 2024 IBC takes effect statewide July 1, 2026 per the same statute.2021 International Residential Code (IRC) — current statewide-adopted edition, same statutory basis as above.2021 International Plumbing Code (IPC) — current statewide-adopted edition.2021 International Mechanical Code (IMC) — current statewide-adopted edition.2021 International Energy Conservation Code (IECC) with Utah amendments — current statewide-adopted edition.2020 National Electrical Code (NEC) — Nephi's own Electrical Policy documents (Overhead/Underground Residential Electric Service requirements) require installation 'in accordance with the latest edition of the NATIONAL ELECTRIC CODE,' consistent with statewide adoption; Nephi Power Department administers electrical service inspections separately from the Building Department (435-623-0276).

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and duplex residential construction and any work regulated by the statewide-adopted 2021 IRC/IBC. Nephi's Building Department (staffed separately from the Juab County-contracted Planning and Zoning function) issues the permit; plan review and building inspection services are themselves delivered under a competitively-bid professional-services contract (RFP No. 22-01) rather than by county staff. The core Building Permit fee is valuation-based (no flat citywide table is published); a $1,000 non-refundable Building Permit Application Deposit is credited toward the final fee at issuance.

Verified 2026-07-08 · Source

Requirements

  • New single-family or duplex residential construction, or any work regulated by the statewide-adopted 2021 IRC
  • Completed Nephi City Building Permit Application (Rev. 12-6-23), signed by owner and contractor
  • Signed Receipt of Nephi City Policy Documents (Electrical, Natural Gas, Sewer Lateral, and Curb/Gutter/Sidewalk policy packets)
  • Two sets of plans and a plat map/site plan submitted to the Building Department after Planning and Zoning approval of the underlying land use application
  • Toilet on site before work commences (per the official Building Permit Application, Page 2 conditions)
  • Compliance with subdivision soils report recommendations where applicable (collapsible soils notice, per the official application form)

Required documents

  • RequiredNephi City Building Permit Application (Rev. 12-6-23)Two-page application capturing parcel use, construction type/materials, contractor and owner information, and the department fee worksheet (Parks Impact Fee, Electric Fee/Impact Fee, Water Fee/Impact Fee, Sewer Fee, Gas Fee, Engineering Fee, Asphalt Fee, Road Excavation Fee, Garbage Can Fee, Plan Check Fee, Sidewalk Deposit, Building Permit Fee, 1% State Fee, Permit Tracking Fee).
  • RequiredReceipt of Nephi City Policy DocumentsSigned acknowledgment covering Electrical, Natural Gas, Sewer Lateral, and Curb/Gutter/Sidewalk/Drive Approach policy documents and standard drawings; applicant agrees to remove and re-install any non-compliant work at no cost to the city.
  • RequiredSite Plan / Plat MapSubmitted alongside the building permit application following Planning and Zoning (Juab County-contracted) approval of the underlying land use application.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published; fee computed by the contracted plans examiner/building inspector from project valuation)Nephi City Fee Schedule Report (effective 6/16/2026), 'Building Permit' > 'Miscellaneous Permit' > 'Building Permit' line: Current Approved Fee listed as $0.00 with Additional Conditions 'Based off valuation.' This is a valuation-driven fee methodology (not an unpublished/unresolved fee) — Nephi has not published a fixed percentage or per-square-foot table distinct from valuation-based calculation performed at plan review.
Building Permit Application Deposit$1,000.00 per permit (non-refundable; credited toward the Building Permit Fee at issuance)Nephi City Fee Schedule Report (6/16/2026): 'This is non-refundable. When a permit is issued it will be credited. If the permit is canceled, this pays for the plan review.' Also appears on the official Building Permit Application, Page 2.
Residential Permit Plan Check Fee$400.00 minimum per plan; $100.00 per hour for review time exceeding 4 hours; $100.00 for a duplicate plan checkNephi City Fee Schedule Report (6/16/2026), 'Building Permit' > 'Residential Permit' rows: Plan Check Fee $400.00 Per Plan (Minimum); Plan Check Fee $100.00 Per hour over 4 hours; Duplicate Plan Check $100.00 Per Plan.
Building Permit State Surcharge1% of building permit feeNephi City Fee Schedule Report (6/16/2026): 'State of Utah charges a 1% surcharge on building permit fees' — statewide surcharge under Utah Code § 15A-1-403.
Permit Tracking Fee$75.00 per permitNephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Permit Tracking Fee.
Impact Fee - Parks & Recreation (Single Family Household)$2,802.00 per residential unitNephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Parks & Recreation, Single Family Household.
Impact Fee - Water$6,067.00 per Equivalent Domestic Unit (EDU)Nephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Water.
Impact Fee - Electric$2,075.00 per Equivalent Domestic Unit (EDU)Nephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Electric.
Sidewalk Deposit / Sidewalk Inspection Fee$4,000.00 refundable deposit + $60.00 per inspectionNephi City Fee Schedule Report (6/16/2026): deposit refunded if sidewalk passes ADA-compliance inspection; also stated on the official Building Permit Application (Page 2: Sidewalk Deposit $4,000.00, Sidewalk Inspection $60.00).

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nephi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →